Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
UNDERGROUND STORAGE TANK <br /> RESPONSE PLAN-PAGE 1 <br /> TYPE OF ACTION ® I NEW PLAN ) <br /> - ❑ 2.CHANGE OF INFORMATION (One form r facilit <br /> R01. <br /> FACILITY ED x (Agency Use only) L FACILITY INFORMATION <br /> BUSINESS NAME(Same as FACILITY NAME) - - <br /> Valero Corner Store #3698 4 3 4 3 <br /> BUSINESS SITE ADDRESS 3. <br /> 153 E. 11th Street 103. BUSINESS SITE CITY <br /> 104. <br /> II. SPILL C Trac <br /> This plan addresses unauthorized releases from UST systemONTROLnAND CgLEANUP pMETHODa res in [he facility's Hazardous Materials <br /> Business Plan(HMBP). <br /> IF safe n h so,facility personnel will take immediate measures to control or stop any release(e.g.,activate pump shut-off,e[cJ and,if necessary,remaining hazardous material from the UST system. <br /> ly <br /> Any release to secondary containment will be pumped or otherwise removed within a Gme consistent with the ability of[he secondary con[ainrrmen[esystemoto <br /> fo <br /> contain the hazardous material,but no[greater than 30 calendar days,or sooner if required by[he local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> ➢ Absorbent material will be used to coin n and clean up manageable spills of hazardous materials. Absorbent material which has become too saturated it be <br /> effective or which is no longer intended for use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds that <br /> it p non-hazardous. Used absorbent material,reusable or waste,will be stored in a properly labeled and sealed m;..-.. <br /> appropriately. <br /> ➢ Facility personnel will determine whether any water removed from secondary enmeshment systems, or from clean-up activity, <br /> material shall be disposed of <br /> y <br /> hazardous material. If the water is contaminated, it will be managed as hazardous waste unless a hazardous waste determination in accordance with 22 CCR <br /> §66262.11 finds that it is non-hazardous. B the water has a ty. has been in contact with any <br /> necessarily display rainbow colors. Water h Petroleum sheen(i.e.,rainbow colors),it is contaminated. A thick floating <br /> D We will review second (hazardous Po si non-hazardous)from sumps,spill containers,etc.will not be disposed to storm wapteer sysemsayer may not <br /> secondary containment systems for possible deterioration if any of the following conditions occur: <br /> L Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2. Secondary containment is prone to damage from to equip is <br /> used to remove or clean u hazardous material collected in secondary 3. Hazardous material, other than the producVwas[e s[oedin [he rim <br /> released Product/waste,and the added material or resulting material from such a combination is not compatible with secondary containment. <br /> Primary containments stem, is laced inside second nm containment; <br /> Y P secondary containment to treat or neutralize <br /> III. SPILL CONTRO <br /> equipment is inspected at least monthly,and afterSupplies <br /> L AND CLEAN-UP E <br /> PERIODIC MAINTENANCE: S ill control and clean-u QUIPMENT <br /> each use,Su pliesmane replenished en asey ste li <br /> needed. Defective equipment is repaired or replaced asnecessary. <br /> is sted in [he facility's Hazardous Materials Business PlanThis <br /> , <br /> E UIPMENT NOT PERMANENTLY ONSITE,BUT AVAILABLE FOR USE IF NEEDED; <br /> EQUIPMENT (Cu (ete onl i a (icable) <br /> LOCATION <br /> RIG. AVAII.ABH,rI'Y <br /> R20. <br /> R11. R30. <br /> R21. <br /> R 12. mi. <br /> R22. <br /> R13. R32. <br /> R23. <br /> R14. R33. <br /> R24. <br /> RIS. R34. <br /> R25. <br /> R35. <br /> IV- RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSON(S)IS/ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME Rao. <br /> Ja tar Gill TITLE <br /> NAME Mana er RSo. <br /> Don Marcetti Rat, TITLE R51. <br /> NAMR Area Manager <br /> Sand Huff R42. TI17,E <br /> NAME COm liance Coordinator R52. <br /> R43. TITLE <br /> R53. <br /> V- MONITORING INDICATORS <br /> IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE,STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br /> ®I. ADDITIONAL SYSTEM TESTING OR DATA COLLECTION ®2. INSPECTION BY QUALIFIED PERSONS <br /> EJ 99. OTHER(Specify): 03. RECALIBRATION OF EQUIPMENT R60. <br /> RM. <br /> UN-022B-1/3 <br /> www.unidocs.org <br /> Rev.04/02/08 <br />