My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
153
>
2300 - Underground Storage Tank Program
>
PR0231389
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:22 AM
Creation date
11/4/2018 4:35:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231389
PE
2361
FACILITY_ID
FA0003709
FACILITY_NAME
VALERO #3698
STREET_NUMBER
153
Direction
E
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23336607
CURRENT_STATUS
01
SITE_LOCATION
153 E ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\ELEVENTH\153\PR0231389\BILLING 2012-2015.PDF
QuestysFileName
BILLING 2012-2015
QuestysRecordDate
5/19/2017 9:44:43 PM
QuestysRecordID
3390673
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUNDSTORAGETANK <br /> MONITORING PLAN (Page 2 or 2) <br /> VI.UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> Jfl-544 <br /> 1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490-54x <br /> ❑ 1.CONTINUOUS ELECTRONIC MONITORING ®2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE <br /> ❑4.NO DISPENSERS ❑99.OTHER - -------- <br /> ---____-- r--_______. 641456. <br /> PANEL MANUFACTURER: °w.ss MODEL#: <br /> _.------_.-------_-- -------_ J911.5] a9P5x <br /> LEAK SENSOR MANUFACTURER:Bravo MODEL#(S):Float&chain <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑ a.YES ®b.NO <br /> w.w <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN ❑ a.YES ®b.NO 4`M-60' <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YFS ®b.NO <br /> dw-61 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. ® a.YES ❑b.NO 4%462 <br /> awafi3 <br /> 2.UDCCONSTRUCTIONIS ®I.SWGLE-WALLED 112.DOUBLE-WALLED <br /> IF DOUBLE WALLED: <br /> UDC INTERSPACE IS MONITORED BY:.❑1.LIQUID ❑2.PRESSURE_❑3.VACUUM __—_ ._--_____—__-_---_- ___-__ <br /> _INTERSTITIAL -- <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑a.YES ❑b.NO 4f061h <br /> VII.PERIODIC SYSTEM TESTING <br /> L ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL ROARD THAT EMiANM 49a6b. <br /> LEAK DETF-CTION(ELDI MUST BE PERFORMED_PERIODIC ED IS PERFORMED EVERY 36 MONTHS AS REQUIRE (23D. CCR¢2644p_ _________ <br /> _- J90-M <br /> ®2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS., __--- _____ ______— _--_-__----_ <br /> 3.SPILL BUCICEIS ARE TESTED ARr ALLY. 4fa6] <br /> VIII.RECORDKEEPING <br /> The following monitoring/maintenance records are kept for this facility: <br /> ®Alarm logs cw.ma ❑Visual Inspection Records 4wi-mb ❑Tank integrity testing results 49(a6xc <br /> ❑SIR testing results(and supporting documentation records). 4vt and ❑ Tank gauging results(and supporting documentation records). Jw-bw< <br /> ®ATG Testing mulls(and supporting documentation records).awifisr ❑ Corrosion Protection 60-day logs Jwrxg <br /> ®Equipment maintenance and calibration records. 4vo-mb <br /> IX.TRAINING <br /> ®Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to theirjob duties. 4f % <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)Jf1-69 <br /> ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)swlmn <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490a69d <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW Nfa6* <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"4fa69r <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"490 69g <br /> ❑ OTHER(Specify):M691a M6% <br /> This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> The"Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> D Operation of the UST systems in a manner consistent with the facility's best management practices <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> • The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> ➢ Names of contact person(s)for emergencies and monitoring alarms.4911-70 <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan.490-71 <br /> ntc(iilhemo waiks He ddvcr a1 vin of lank capacay with M CXLCMl Lam aid Hgk. <br /> XL PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that:1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs.2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The following person(s)are responsible for performing the monitoring and equipment maintenance: aw-D <br /> NAME Ja mr Gill aw-n TITLE Manager <br /> NAME Don Marceiti 490.74 TITLE Area Manager 49()-75 <br /> The Designated Operator shall perform a monthly visual inspection of the facility, provide a report to the owner/operator,and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XII.OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:1 certify information that the infoation provided herein is true and accurate to the best of m 7 <br /> knowled e. J9n <br /> APPLICANT SIGNATURE I ' 4wa76 DATE. <br /> a9n.]s afan9 <br /> APPLICANT NAME(print): APPLICANT TITLE: <br /> Sandy Huff Compliance Coordinator <br /> UPCF UST-D(122007)3/4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.