My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
153
>
2300 - Underground Storage Tank Program
>
PR0231389
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:22 AM
Creation date
11/4/2018 4:35:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231389
PE
2361
FACILITY_ID
FA0003709
FACILITY_NAME
VALERO #3698
STREET_NUMBER
153
Direction
E
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23336607
CURRENT_STATUS
01
SITE_LOCATION
153 E ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\ELEVENTH\153\PR0231389\BILLING 2012-2015.PDF
QuestysFileName
BILLING 2012-2015
QuestysRecordDate
5/19/2017 9:44:43 PM
QuestysRecordID
3390673
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNIFIED PROGRAM CONSOLIDATED FORM <br /> • UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-(Pae 1 of 2) <br /> 4eo-1 <br /> TYPE OF ACTION ❑ 1.NEW PLAN ® 2.CHANGE OF INFORMATION <br /> 4910 <br /> PLAN TYPE ® 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S) <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(abe,l�y Use oldy) _ _ I <br /> 3. <br /> BUSINESS NAME(Same as FACILITY NAME)Valero#3698 <br /> 1u3. Ina. <br /> BUSINESS SITE ADDRESS 153 E. 11 Street CITY Tracy <br /> II.EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> 23 CCR§2632.2634,2638,2641) ___ _____________---------------------------------------------___________________________________________________________. <br /> MONITORING EQUIPMENT IS SERVICED ® 1.ANNUALLY ❑ 99.OTHER(Specify): 4911ab <br /> III.MONITORING LOCATIONS <br /> 10 1.NEW SITE PLOT PLAN MAP SUBMITTED WITH THIS PLAN. X❑2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)490-t <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br /> ® L CONTINUOUS ELECTRONIC TANK MONTTORING OF ANNULAR(INTERSTITIAL)SPACES)OR SECONDARY CONTAINMENT 49n-5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM 490-6 <br /> __________._-___________________-___----__._______-_.--______.____________________ _____________-_______.490-8 <br /> PANEL MANUFACTURER: Gilbarco d90-0' I MODEL#: EMC <br /> ----_________._______________..________-.___ 490-9. t___________________.._._______.-____-_-_______._--490-IO <br /> LEAK SENSOR MANUFACTURER: Gilbarco MODEL#(S): 420 <br /> 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).(23 CCR§2643) 490-11 <br /> PANEL MANUFACTURER: <br /> a90-12. MODEL#: 490-13 <br /> _ <br /> 490-14' 490-15 <br /> IN-TANK FROM <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILYINIGHTLY ❑ c.WEEKLY 490-16 <br /> _______...-_ _d_MONTHLY-.__________.._________...__________._0_e_OTHER(Specify)___.______- <br /> __________-______ _____a9an_ <br /> _________________________...__________._. - 490-18 <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h. ❑ c.OTHER(Specify): 490-19 <br /> El3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 490.20 <br /> 490-2t <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 490-22 <br /> 490-23 <br /> ❑ 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 490-24 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): 490-25 <br /> 490 26 <br /> ®99.OTHER (Specify): 36 month secondary containment testing 490-27 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> ® 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 490-28 <br /> VISUAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS: ®a.DRY ❑b.LIQUID FILLED [1c.PRESSURIZED ❑d.UNDER VACUUM °90-29 <br /> -------_--------_----_-----____--------------------_----------_----_----_------------..-_-----._______._-_______-____- .______._______.________._________-_______._ 490-31 <br /> _ PANEL MANUFACTURER:Gilbarco 49°-J0 I MODEL#: EMC <br /> --______-._._____-___-____________________________.____________.________.________..-_______.l _______...________.______._-._____.._______._..__. 490-33 <br /> -_________.________-._ 490-32 -_ <br /> LEAK <br /> SENSOR MANUFACTURER: Gilbarco _ _______ 1 MODEL#(S): 208 <br /> _____ _ _ _ _ ______._.-._________-________-.--____-._-_._____.._________.__ 490-34 <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. 19 a.YES ❑b.NO <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ®a.YES ❑b.NO 490-35 <br /> ® 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> _ P_R_O_DUCT FLOW WHEN A LEAK3 CCR IS DETECTED 2 490-M <br /> -_------- --- -----------------------�-----§2636)-------------- 490----------------------------------------------------------------'------' 490-38 <br /> -- - -- --- -3] MODEL#(S): FX-1 V <br /> MLLD MANUFACTURER(S):Red JaCke[ <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR§2636) - -_ -490-39_ <br /> ___..._______ _._________ __,___.____-_._______._______..__-_ _ 490-4I <br /> ELLD MANUFACTURER(S) _____...-___________________.______._ <br /> - <br /> _ - __ __ __ __ 490.42 <br /> PROGRAMMED W LWE LEAK TEST: ❑ 1.MWIMUM MONTHLY 0.2 g.p.h. ❑ 2.MINIMUM ANNUAL 0.1 g.p.h. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. Ela.YES El b.NO 49°-a3 <br /> ELLD FAI.UREIDISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 490-d6 <br /> 4.PIPE INTEGRITY TESTING 490-45 <br /> TEST FREQUENCY ® a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) 490-46490-4] <br /> ❑ 5.VISUAL PIPE MONITORING. 490-49 <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED' 480-49 <br /> •Allowed for monitorm of unburied emerpncy genemior fuel piping onlX •r HSC 425281.5(b)(3) <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR§2636(a)(3)]. 490-50 <br /> ❑ 7.NONREGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 490.51 490-52 <br /> ❑ 99.OTHER(Specify) 490-53 <br /> UPCF UST-D(12/2007)1/4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.