Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORK <br /> UNDERGROUNDSTORAGETANK <br /> MONITORING PLAN (Page 2 of 2) <br /> VI.UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> 490-540- <br /> 1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490-54th <br /> ❑ 1.CONTINUOUS ELECTRONIC MONITORING E 2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE <br /> ❑ 4.NO DISPENSERS ❑99.OTHER(Specify)__—_________.________-_______________ __ __ ________--_________-_______________ 490-56. <br /> PANEL MANUFACTURER: 490--ss MODEL#: <br /> _ _____ 490-58 <br /> LEAK SENSOR MANUFACTURER: 090-n MODEL#(S): <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑ a.YES ®b.NO d90-59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN ❑ a.YES E b.NO 490-60. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES E b.NO 490-61 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. E a.YES ❑b.NO 490-62 <br /> 490-63 <br /> 2.UDC CONSTRUCTION IS El.SINGLE-WALLED ❑2.DOUBLE-WALLED _ <br /> 490-64e <br /> IF DOUBLE WALLED: <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: E]1_LIQUID__[12.PRESSURE-0.3_VACUUM _--_- ----------------------__-_--_--------_-__---___ <br /> ______________ 490-bah <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑a.YES ❑b.NO <br /> VII.PERIODIC SYSTEM TESTING <br /> I. ELD TESTING: THIS FACB.ITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED490-65. <br /> LEAK DETECTION(ELD)MUST BE PERFORMED__PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUB2ED_(23 CCR U2644. <br /> ----------- <br /> --- - - - 490-66 <br /> E 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. _ ------------------------------------------------------- <br /> E 3.SPILL BUCKETS ARE TESTED ANNUALLY. ———--------------- - 490-67 <br /> VIII.RECORDKEEPING <br /> The following monitoring/maintenance records are kept for this facility: <br /> E Alarm logs 490-68a ❑Visual Inspection Records 49a68b ❑Tank integrity testing results 490-6k <br /> ❑SIR testing results(and supporting documentation records). 490-68d ❑ Tank gauging results(and supporting documentation records). 490-68e <br /> E ATG Testing results(and supporting documentation records).4go-68f ❑ Corrosion Protection 60-day logs 490-68g <br /> E Equipment maintenance and calibration records. 490-68h <br /> IX.TRAINING <br /> E Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to theirjob duties. 490.690 <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> E THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)490-69th <br /> E OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)490-69c <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-69d <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490-69e <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"490-69r <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"490-69g <br /> ❑ OTHER(Specify):M69h.M694 <br /> This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> The"Designated UST Operator'will Vain facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> ➢ Names of contact persons)for emergencies and monitoring alarms.490-90 <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan.49[F]1 <br /> The cidbavo notifies the driver at 90%of rank capacity with an extemal horn and light. <br /> XI,PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that 1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The following person(s)are responsible for performing the monitoring and equipment maintenance: <br /> NAME Jaguar Gill 490-72 TITLE Manager 490-73 <br /> NAME Don Mareetti 490-74 TITLE Area Manager 490-75 <br /> The Designated Operator shall perform a monthly visual inspection of the facility, provide a report to the owner/operator, and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XIL OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGNATURE 49076 DATE: 49f1-77 <br /> ' NTI T war Faglily O d0 t ❑3 holy• v• f w <br /> ago-78 APPLICANT TITLE: 49-7 <br /> APPLICANNAME(print): 0 9 <br /> Sandy Huff Compliance Coordinator <br /> UPCF UST-D(12/2007)3/4 <br />