Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
NNW \w <br /> Discussion <br /> N%W During the removal of the diesel tank, Ms. Linda Turkatte of PHS-EHD advised <br /> THS that further site investigation and remediation work to determine the extent of <br /> the petroleum hydrocarbon contamination to the surrounding soil and the <br /> groundwater in the vicinity of the former diesel and gasoline tanks may be required. <br /> THS has retained Wright to perform a Records Review and prepare a Work Plan based <br /> on upon the records review, and to provide a preliminary budget to accomplish the <br /> specified work. Upon completion of the review, THS and PHS-EHD will receive a <br /> summary report along with a description of the requirements THS must comply with. <br /> Should you have any questions, please contact us at ( 209) 833-0758. <br /> Sincerely, <br /> Wri/ght/Environmental Services, Inc. <br /> Lester Messina <br /> Project Manager <br /> L <br /> attachments: <br /> Drawings 1 <br /> Appendix A, Permits <br /> Appendix B, Hazardous Waste Manifest <br /> Appendix C, Tank Tracking Record <br /> Appendix D, Backfill Weigh Tickets <br /> cc: San Joaquin County PHS-EHD <br /> 445 N. San Joaquin Street <br /> P. O. Box 2009 <br /> Stockton, Ca 95201 <br /> Attn: Mr. Bill Snavely <br /> 2 <br />