My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
368
>
2300 - Underground Storage Tank Program
>
PR0522385
>
REMOVAL_2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:50 AM
Creation date
11/4/2018 4:40:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2004
RECORD_ID
PR0522385
PE
2381
FACILITY_ID
FA0015248
FACILITY_NAME
FORMER TRACY QUICK FREEZE
STREET_NUMBER
368
Direction
E
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
368 E ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS\E\ELEVENTH\368\PR0522385\REMOVAL 2004.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 1.0 INTRODUCTION <br /> The health and safety of all project personnel involved at the location of City of Tracy, 368 E. 11t' St, Tracy, <br /> CA 95376 removal of one underground storage tank is of primary importance. Therefore, this Health and <br /> Safety Plan was developed and is intended to be followed by all project personnel. It is the responsibility of <br /> the Project Manager to implement and enforce the plan and any subsequent revisions, during the course of all <br /> operations at the site. <br /> 1.1 OVERVIEW <br /> Wright Environmental Services, Inc. (WES) shall remove (1) underground storage tanks (UST) at the <br /> location 368 E. 11`" St, Tracy CA . The typical steps involved with tank removal are: <br /> 1. Draining/cleaning of all liquid from the tanks and all associated lines. <br /> 2. Capping or removing associated lines. <br /> 3. Excavation and removing the tank from the ground. <br /> 4. Freeing the tank of toxic vapors <br /> 5. Disposing of the tank <br /> 6. Backfilling the excavation hole. <br /> The chemical hazards expected to be encountered at the site may be organics and metals from gasoline or <br /> diesel fuel. The other hazards expected to be encountered during the project are exposure to physical <br /> hazards such as slipping, tripping, cuts, strains bruises, smashing limbs from working around heavy <br /> equipment (pinch points), excessive noise, broken bones and heat stress. The tank capacity and contents <br /> are listed below: <br /> CAPACITY tuallong) CONTENTS <br /> 1 300 gallon Gasoline <br /> SECTION 2.0 PROJECT SAFETY AUTHORITY <br /> Personnel responsible for the on site project safety are the Project Manager, Jeff Downs. <br /> The Company Safety Officer, John Lynch is responsible for the dissemination of the information contained in <br /> the plan to the Project Manager. <br />
The URL can be used to link to this page
Your browser does not support the video tag.