My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
368
>
2300 - Underground Storage Tank Program
>
PR0522385
>
REMOVAL_2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:50 AM
Creation date
11/4/2018 4:40:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2004
RECORD_ID
PR0522385
PE
2381
FACILITY_ID
FA0015248
FACILITY_NAME
FORMER TRACY QUICK FREEZE
STREET_NUMBER
368
Direction
E
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
368 E ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS\E\ELEVENTH\368\PR0522385\REMOVAL 2004.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
As such, the Project Manager, Jeff Downs, is responsible for ensuring the following items are adequately <br /> addressed: <br /> Safety Supplies& Equipment Inventory <br /> • Training Programs/Hazard Communication <br /> • Accidentlincident Reporting Procedures <br /> Decontamination/Contamination Reduction Procedures <br /> The Project Manager, Project Superintendent and the Site Safety Officer have the authority to suspend work <br /> anytime they determine that the provisions of the plan are inadequate to ensure worker safety. The Project <br /> Site Safety Officer shall also inform the Project Manager of individuals whose conduct is not consistent with <br /> the requirements of the plan. <br /> The following is a list of safety officer and supervisor responsibilities: <br /> Identify emergency officials; <br /> Identify chemicals and their toxicities; <br /> Provide for first aid; <br /> Perform site safety meeting; <br /> Ensure proper protective gear is available and utilized-instruct employees in use and maintenance; <br /> Evaluate potential hazards, both old and new, physical contact - lacerations,sprains, bums, inhalation <br /> and absorption through skin, nose; <br /> electrical; <br /> Layout contaminated and clean zones; <br /> Note and communicate locations of emergency equipment; <br /> Promote use of the buddy system and immediate notification of toxic effects; <br /> Note possible explosion or fire hazards. <br /> Records of the above items will be documented as they are defined and implemented in the site safety <br /> meeting. <br /> SECTION 3.0 JOB HAZARD ANALYSIS <br /> 3.1 GENERAL BACKGROUND <br /> The possible contaminant present on site is organics and lead from gasoline. <br /> 3.2 WASTE DESCRIPTION <br /> Gasoline <br /> Gasoline can pose a significant health hazard as lead is a toxic metal. The organic lead compounds, <br /> tetraethyllead (TEL)and tetramethyllead (TML)are constituents of gasoline as antiknock compounds. <br /> Health problems associated with lead are headache, anxiety, insomnia, nervous excitation and minor <br />
The URL can be used to link to this page
Your browser does not support the video tag.