Laserfiche WebLink
✓IFIED PROGRAM CONSOLIDATED FORM� 3/0/ TANK: TA0133(103 <br /> PR#: PRO231330 <br /> UNDERGROUND STORAGE TANKS - TANK PAGE 2 FAC#: FA0003964 <br /> VI.PIPING CONSTRUCTION(ch x w mat apply) Page 3 ors <br /> UNDERGROUND PIPING ABOVEGROUND PIPING <br /> SYSTEM TYPE I.PRESSURE [12.SUCTION ❑3.GRAVFFY 458 ❑ L PRESSURE [:12.SUCTION ❑3.GRAVITY 459 <br /> CON57Rucrlm ❑❑��I SINGLE WALL ❑3.LINED TRENCH El".OTHER W El 1.SINGLE WALL ❑ 95.UNKNOWN 462 <br /> (�2.DOUBLE WALL ❑95.UNKNOWN ❑2.DOUBLE WALL ❑99.OTHER <br /> MANUFACTURER 461 MANUFACTURER 465 <br /> ❑ I.BARE STEEL ❑6.FRP COMPATIBLE wl loo.METHANOL ❑ LBARESTEEL ❑ 6.FRPCOMPATIELEwllo9 WTHANOL <br /> ❑2.STAINLESS STEEL ❑ 7.GALVANIZED STEEL ❑ 2.STAINLESS STEEL ❑ 7.GALVANIZED STEEL <br /> ❑PLASTIC COMPATIBLE W/CONTENTS El 95.UNKNOWN El PLASTIC COMPATIBLE W/CONTENTS El 9s.UNKNOWN <br /> •h-AJI.FIBERGLASS ❑ 8.FLEXIBLE(HDPE) ❑ 99.OTHER ❑4.FIBERGLASS ❑ B.FLEXIBLE(HDPE) ❑ 99.OTHER <br /> ❑5.STEEL W/COATING ❑9.CATHODIC PROTECTION 4M [15.STEEL W/COATING ❑9.CATHODIC PROTECTION 465 <br /> VII.PIPING LEAK DETECTION(cI 4 wn a Jy)U 6m�pEos ormemo,,;�m6, patPm,,,Iwlro.:,.6,,,;udlmtx lo.,l,aaay) <br /> UNDERGROUND PING ABOVEGROUND PIPING <br /> SINGLE WALL PIPING asb SINGLE WALL PIPING 467 <br /> PRESSURIZED PING(Check W that appy): PRESSURIZED PIPING(Check all that apply): <br /> ❑ <br /> I.ELECTRONIC LME LEAK DETECTOR 3.0 GPH TEST WITH AUTO PUMP SHUT OFF ❑ 1.ELECTRONIC LINE LEAK DETECTOR 3.0 GPH TEST WITH AUTO PUMP SHUT OFF <br /> FOR LEAK,SYSTEM FAILURE,AND SYSTEM DISCONNECTION+AUDE3LE AND FOR LEAK,SYSTEM FAILURE,AND SYSTEM DISCONNECTION+AUDIBLE AND <br /> VISUAL ALARMS. VISUAL ALARMS. <br /> ❑2.MONTHLY 01 GPH TEST <br /> ❑3.ANNUAL INTEGRITY TEST(0.1 GPH) ❑ 2.MONTHLY 0.2 GPH TEST ❑ 3.ANNUAL INTEGRITY TEST(0.1 GPH) <br /> ❑4.DAILY VISUAL CHECK <br /> CONVENTIONAL SUCTION SYSTEMS CONVENTIONAL SUCTION SYSTEMS(Check all that apply) <br /> ❑5.DAILY VISUAL MONITORING OF PUMPING SYSTEM+TRIENNIF.AL PIPING ❑ 5.DAILY VISUAL MONITORING OF PIPING AND PUMPING SYSTEM <br /> INTEGRITY TEST(0.1 GPH) ❑ 6.TRIENNIAL INTEGRITY TEST(0.1 GPH) <br /> SAFE SUCTION SYSTEMS(NO VALUES IN BELOW GROUNDPIPING): SAFE SUCTION SYSTEMS(V0 VALUES IN BELOW GROUNDPIPING): <br /> E] 7.SELF MONITORING <br /> GRAVITY FLOW [17.SELF MONITORING <br /> ❑9.B@NNW.INTEGRITY TEST(0.1)GPH GRAVITY FLOW(Check all that apply): <br /> [18.DAILY VISUAL MONITORING <br /> ❑9.BIENNIAL INTEGRITY TEST(0.1)GPH <br /> SECONDARILY CONTAINED PIPING SECONDARILY CONTAINED PIPING <br /> PRESSURIZED PIPING(Check a8 that apply): PRESSURIZED PIPING(Check a8 that apply): <br /> 10.CONTINUOUS TURBINE SUMP SENSOR WITH AUDIBLE AND VISUAL 10.CONTINUOUS TURBINE SUMP SENSOR WITH AUDIBLE AND VISUAL <br /> ALARMSAND(C kws) ALARMS AND(C6eak ms) <br /> ❑a.AUTO PUMP SHUT OFF WHEN A LEAK OCCURS ❑a.AUTO PUMP SHUT OFF WHEN A LEAK OCCURS <br /> ❑ b.AUTO PIMP SHUT OFF FOR LEAKS,SYSTEM FAILURE AND SYSTEM ❑ b.AUTO PUMP SHIFT OFF FOR LEAKS,SYSTEM FAILURE AND SYSTEM <br /> ZfSCONNECT10N DISCONNECTION <br /> NO AUTO PUMP SHUT OFF ❑ C.NO AUTO PUMP SHUT OFF <br /> �1M <br /> AUTOMATIC LE LEAK DETECTOR(3.0 GPH TEST)WITH FLOW SHUT OFF OR <br /> RESTR11.AUTOMATIC LEAK DETECTOR <br /> 12.ANNUAL INTEGRITY TEST(0.1 GPH) ❑ 12.ANNUAL INTEGRITY TEST(0.1 GPH) <br /> SUCTION/GRAVITY SYSTEM SUCTION/GRAVTTY SYSTEM <br /> ❑ 13.CONTINUOUS SUMP SENSOR+AUDIBLE AND VISUAL ALARMS ❑ 13.CONTINUOUS SUMP SENSOR+AUDIBLE AND VISUAL ALARMS <br /> EMERGENCY GENERATORS ONLY(Clark all m t appy) EMERGENCY GENERATORS ONLY(Cha&all mat appy) <br /> ❑ 14.CONTINUOUS SUMP SENSOR WITHOUT AUTO PUMP SHUT OFF" ❑ 14.CONTINUOUS SUMP SENSOR WITHOUT AUTO PUMP SHUT OFF" <br /> AUDIBLE AND VISUAL ALARMS AUDIBLE AND VISUAL ALARMS <br /> El 15.AUTOMATIC LINE LEAK DETECTOR(3.0 GPH TEST)WITHOUT FLOW E] 15.AUTOMATIC LINE LEAK DETECTOR(3.0 GPH TEST)WITHOUT FLOW <br /> SHUT OFF OR RESTRICTION SHUT OFF OR RESTRICTION <br /> ❑ 16.ANNUAL INTEGRITY TEST(0.1 GPH) ❑ 16.ANNUAL INTEGRITY TEST(0.I GPH) <br /> ❑ 17.DAILY VISUAL CHECK ❑ 17.DAILY VISUAL CHECK <br /> Vm.DISPENSER CONTAINMENT <br /> DISPENSER CONTAINMENT ❑ 1,FLOAT MECHANISM THAT SHUTS OFF SHEAR VALVE ❑4.DAILY VISUAL CHECK <br /> DATE INSTALLED <br /> 468 2.CONTINUOUS DISPENSER PAN SENSOR+AUDIBLE AND VISUAL ALARMS ❑f�TRENCH LRJF.R/MONITORING <br /> E]3.CONTINUOUS DISPENSER PAN SENSOR WITH AUTO SHUT OFF FOR 6.NONE <br /> DISPENSER+AUDIBLE AND VISUAL ALARMS 469 <br /> IX.OWNER/OPERATOR SIGNATURE <br /> I w4Fy mat da mF tioopmvidNlvonubuc and to mthe 6®t otmylmowW, <br /> SIGNATURE OF OWNER/OPERATOR DATE no <br /> NAME OF OWNEWOPERATOR(prim) TITLE OF OWNER/OPERATOR <br /> (prim) 471 <br /> Pm,Nw (F-1-1 -y) 473 Pmmt Appmved(Fm bael uac®ly) 474 Pm aEVuatim(Nwffw mcy) 475 <br /> PT0006610 EE0000817 1/1/1993 <br /> UPCF(12/99 revised) <br />