My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
14000
>
2300 - Underground Storage Tank Program
>
PR0231631
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:21:27 AM
Creation date
11/4/2018 5:26:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231631
PE
2361
FACILITY_ID
FA0000091
STREET_NUMBER
14000
Direction
E
STREET_NAME
STATE ROUTE 88
City
LOCKEFORD
Zip
95237
CURRENT_STATUS
01
SITE_LOCATION
14000 E HWY 88
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\HWY 88\14000\PR0231631\BILLING 2010- 2015 .PDF
QuestysFileName
BILLING 2010- 2015
QuestysRecordDate
5/18/2017 9:56:03 PM
QuestysRecordID
3388301
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TIED PROGRAM CONSOLIDATED FO <br /> UNDERGROUNDSTORAGETANK <br /> MONITORING PLAN - Pae 1 of 2 <br /> TYPE OF ACTION ❑ 1.NEW PLAN ® 2.CHANGE OF INFORMATION 490-1. <br /> PLAN TYPE ® 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 4962. <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) 1 <br /> BUSINESS NAME(Same as Facility Name or DBA) Tower Mart# 876 3 <br /> BUSINESS SITE ADDRESS 14000 East Hwy 88 143. c' Lockford, CA 95237 104. <br /> H. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency specified <br /> bvtie equipment manufacturers'instructions,or annually,whichever is more frequent.Such work must be armed b3'qualifiojpersoMmel 3 CCR§2632,2634,238.26411 <br /> MONITORING EQUIPMENT IS SERVICED IE I.ANNUALLY [199.OTHER(Specify): 49904b. <br /> III. MONITORING LOCATIONS <br /> ❑ 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN ® 2.SITE PLAT PLAN/MAP PREVIOUSLY SUBMITTED [23 CCR§2632,26341 4904. <br /> IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) appna�eck r <br /> L CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) 4965. <br /> WITH AUDIBLE AND VISUAL ALARMS.[23 CCR§2632.26341 <br /> SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 4966. <br /> PANEL MANUFACTURER: Veeder-Root 490-7' MODEL#: TLS350 4908' <br /> _ LEAK SENSOR MANUFACTURER: Veeder-Root 490-9. MODEL#(S),794390-420 490-10' <br /> _[]_2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TAN r 3.[23 CCR§2643] 49 IL <br /> PANEL MANUFACTURER: 490-12. MODEL#: 49013' <br /> IN-TANK PROBE MANUFACTURER: 490-14' MODEL#(S): 49015' <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490-16' <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490.17. <br /> 490.18. <br /> _ .MON_PROGRAMMED TESTS:_ 0 a.0.1 g.p.h. C1 b.0.2 g_ph. C3 c.OTHER(Specify)_ 490-4919. _- <br /> ❑ 3THLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.11 0:20. <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)[23 CCR§26451 TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS °90-21' <br /> _.__...... ___-.__.-_ ---- _----__ __-__49622_...... <br /> ❑ 5.TANK INTEGRITY TESTING PER[z3 CCR§2643.1] °9623' <br /> TEST FREQUENCY: [:1 a.ANNUALLY _❑ b.BIENNIALLY ❑_c_OTHER(Specify): 49624. <br /> _ 49625_ <br /> ___........._.___._..____..___.__ 490-26. <br /> ❑ 99.OTHER(S ecify): 4967. <br /> V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) uata`k�B <br /> ® 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS. 49621. <br /> t§2 CCR SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 49639. <br /> §2361 <br /> PANEL MANUFACTURER:Veeder-Root 49630' MODEL#: TLS 350 °9031. <br /> LEAK SENSOR MANUFACTURER: Veeder-Root 49032' MODEL# 0794380-208 49031. <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ® a.YES ❑ b.NO 490.14' <br /> FAILURFIDISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 49035' <br /> 2.MECHANICAL LINE LEAK DEFECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF 490-76. <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.(23 CCR§26361 <br /> MLLD MANUFACTURER(S):VMI(Dies.)]/FE Petro(Reps&Prem) 490'3'_ MODEL#(s): LD99-2000 I STP MLD 49638. <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS.[23 CCR§26361 49aA. <br /> ELLD MANUFACTURER(S): 49640. MODEL#(S): 49041. <br /> PROGRAMMED IN LINE LEAK TEST: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANINUALO.I g.p.h. 49642. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ® b.NO 49643. <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ® b.NO 49644. <br /> ❑ 4PIPE IN- --iFY TESTING. ----------�- - - ------ 49645. <br /> TEST FREQUENCY: [I a.ANNUALLY _❑_ b.EVERY 3 YEARS ❑ c.OTH_ER(Specify) - 49"7. _ <br /> C15.VISUAL PIPE MONITORING. 090-08' <br /> FREQUENCY: ❑ a.DAILY [I b.WEEKLY ® c.MRN.MONTHLY&EACH TIME SYSTEM OPERATED- 49649. <br /> •Albxxd far vwn o[unburid anv.rte-grnmior fue1P_�vmg only RSCA 51 5ry�L_____ <br /> ❑ 6.SUCTION PIPING MEEr-S EXEMPTION CRITERIA.123 CCR§2636(.X3)] 49050. <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.715 CONNECTED TO'FIE TANK SYSTEM 49651. <br /> ❑ 490.52. <br /> 99.OTHER(Specify) 490-53. <br /> UPCF UST-D(12/2007)-1/4 www.unidoes.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.