Laserfiche WebLink
t, IED PROGRAM CONSOLIDATED FOR <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN - (Pae 2 of 2) <br /> (Check all <br /> VI. UNDER DISPENSER CONTAINMENT (UDC) MONITORING thata l <br /> UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) 490-54a. <br /> ❑ <br /> I.CONTINUOUS ELECTRONIC MONITORING ® 2.FLOAT AND CHAIN ASSEMBLY [13.ELECTRONIC STAN D-A[ANE 4�54b. <br /> ❑ <br /> 4.-NO DISPENSERS _ [I99_OTHER(Specify) 490.56. <br /> q90-ss. MODEL#:TLS-350 <br /> LEAK MONITOR MANUFACTURER:Veeder-Root ago-s,. 490-59. <br /> MODEL#(S):Float&Chain <br /> LEAK SENSOR MANUFACTURER: OPW 490-59.a.YES ® b.NO <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑El49a6o. <br /> a.YES ® b.NO <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN. 490-61. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. [I a.YES ® b.NO® C149042 <br /> a.YES b.NO <br /> UDC MONITORING STOPS THE.FLOW OF PRODUCT AT THE DISPENSER. _.__-.___ 490.63 <br /> 1.SINGLE WALL ❑ 2.DOUBLE WALL <br /> 49"4.UDC CONSTRUCTION IS: ® <br /> IF DOUBLE WAI L: <br /> c.VACUUM <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: ❑ a.LIQUID ❑ b.PRESSURE 490446 <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a.YES ❑ b.NO <br /> VII. PERIODIC SYSTEM TESTING 49045 <br /> 1.ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED <br /> L DETE TI N(ELD)MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS RE UIRED. 23 CCR 426x4.1 q90-66. <br /> ® 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 49x47 <br /> ® 3.SPILL BUCKETS ARE TESTED ANNUALLY. VIII. RECORD KEEPING <br /> 490-68. <br /> The following monitoring/maintenance records are kept for this facility: <br /> ® a ALARM LOGS [Ib.VISUAL INSPECTION RECORDS ❑ o TANK INTEGRITY TESTING RESULTS <br /> [Id.SIR TESTING RESULTS(and supporting documentation records) Ele.TANK GAUGING RESULTS(and supporting documentation records) <br /> ❑ f.ATG TESTING RESULTS(and supporting documentation records) ❑ g.CORROSION PROTECTION 60-DAY LOGS <br /> ® h.E UIPMENT MAINTENANCE AND CALIBRATION RECORDS <br /> IX. TRAINING 49069a <br /> ® Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties: <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) 49049b. <br /> ® THIS UNDERGROUND STORAGE TANK MONITORING PIAN(Required) 49o49e. <br /> ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) 49049& <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 4904%. <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW <br /> C] STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND 49o-�9- <br /> STATISTICAL INVENTORY RECONCILIATIOM' <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" 49a69h <br /> 490.691. <br /> ❑ <br /> OTHER(Specify): y 490-,0. <br /> This facility has a"Designated UST Operator"who has passed the es in the UST System Operator Ezam administered b the International Code Council <br /> (ICC). The "Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 <br /> days of hire.This training will include,but is not limited to,the following: <br /> • Operation of the UST systems in a manner consistent with the facility's best management Practices. <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan. <br /> ➢ The facility employee's role with regard to spills and ovehlls as specified in the facility's UST Response Plan. <br /> ➢ Name(s)of contact person(s)for emergencies and monitoring alarms. <br /> X. COMMENTS/ADDITIONAL INFORMATION 490-]i. <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan. <br /> XI. PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that 1.)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered <br /> this Dlan occurs;2)a11 conditions that indicate a _ssible release are investigated;and 3.Za11 monitoring recmds are maintained ProDerlY <br /> THE FOLLOWING PERSON(S)ARE RESPONSIBLE FOR PERFORMING THE MONITORING AND EQUIPMENT MAINTENANCE: 49x73. <br /> x90-72. TITLE:Store Manager <br /> NAME: Mohammad Afzal 490-75. <br /> NAME: George Sisson 49o-74. TITLE:Zone Manager <br /> The Designated UST Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> .XII. OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certif that the information rov' ed herein is true and accurate to the DATE,best of my knowled e. 490-77. <br /> APPLICANT SIGNATURE 04/09/10 <br /> REPRESENTMG:®1.Tank purer/ or N2.F.90 Owverl aror❑3.AuthorizedR reswtativeofOwve 490.]8. 490-]9. <br /> APPLICANT TITLE: <br /> APPLICANT NAME(print): Maintenance Manager <br /> Paul Chevalier <br /> UPCF UST-D(12/2007).314 www.unidocs.org <br />