My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010 - 2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
18662
>
2300 - Underground Storage Tank Program
>
PR0505356
>
COMPLIANCE INFO_2010 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:21:32 AM
Creation date
11/4/2018 5:30:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 - 2015
RECORD_ID
PR0505356
PE
2361
FACILITY_ID
FA0006733
FACILITY_NAME
GEORGES BP MINI MART
STREET_NUMBER
18662
Direction
N
STREET_NAME
STATE ROUTE 88
City
LOCKEFORD
Zip
95237
CURRENT_STATUS
01
SITE_LOCATION
18662 N HWY 88
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\HWY 88\18662\PR0505356\COMPLIANCE INFO 2010 - 2015.PDF
QuestysFileName
COMPLIANCE INFO 2010 - 2015
QuestysRecordDate
2/1/2018 7:40:19 PM
QuestysRecordID
3779163
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Results of Testing/Servicing <br /> Software Version Installed: <br /> 329.01 MAR 0 9 2015 <br /> Complete the following checklist: PKIT 9 <br /> ® Yes ❑ No' is the audible alarm operational? <br /> ® Yes ❑ No' Is the visual alarm operational? <br /> ® Yes ❑ No' Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> ® Yes ❑ No' Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their proper <br /> operation? <br /> ❑ Yes ❑ No' If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.,modem)operational? <br /> ® N/A <br /> ® Yes ❑ No' For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak, <br /> ❑ N/A fails to operate, or is electrically disconnected? If yes: which sensors Initiate positive shut-down? (Check all that apply) ® Sump?rench <br /> Sensors; ®Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? ®Yes; ❑No. <br /> ❑ Yes ❑ No' For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.,no mechanical overfill prevention valve is <br /> ® N/A installed),is the overall warning alarm visible and audible at the tank fill point(')and operating property? If so,at what percent of tank capacity <br /> does the alar trigger? % <br /> ❑ Yes ® No Was any monitoring equipment replaced? If yes,identify speck sensors,probes,or other equipment replaced and list the manufacturer name <br /> and model for all replacement parts in Section E,below. <br /> []Yes* ® No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> ❑Produck ❑Water. If yes,describe causes in Section E,below. <br /> ® Yes ❑ No' Was monitoring system set-up reviewed to ensure proper settings?Attach setup reports,d applicable <br /> ® Yes ❑ No' Is all monitoring equipment operational per manufacturers specifications? <br /> In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: EH ARIS ON SITE ALL PASSED <br /> Monitoring System Certification Page 2 of 4 2/21/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.