Laserfiche WebLink
0 <br /> F. In-Tank Gauging/SIR Equipment: N Check this box if tank gauging is used only for inventory control. - ) <br /> ❑ Check this box if no tank gauging or SIR eq�ipmentis installed, ,1 <br /> L t_ <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: h� r) 9 ?n15 <br /> N Yes ❑ No` Has all input wiring been inspected for proper entry and termination,including testing for ground faults? /� <br /> ® Yes El No' Were all tank gauging probes visually inspected for damage and residue buildup? &'�Vi('('��ViYiLI A!. <br /> N Yes ❑ No' Was accuracy of system product level readings tested? f J <br /> N Yes ❑ No' Was accuracy of system water level readings tested? <br /> N Yes ❑ No' Were all probes reinstalled properly? <br /> N Yes ❑ No` Were all items on the equipment manufacture's maintenance checklist completed? <br /> `In Section H,below,describe how and when these deficiencies were or will be corrected. <br /> Line Leak Detectors(LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> N Yes ❑ No' For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? (Check all that apply) <br /> ❑ N/A Simulated leak rate: N 3 gp.h.; ❑0.1 g.p.h; [10.2 g.p.h. <br /> N Yes ❑ NW Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> N Yes ❑ No' Was the testing apparatus properly calibrated? <br /> N Yes ❑ NW For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No' For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> N N/A <br /> ❑ Yes ❑ No' For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br /> N N/A <br /> ❑ Yes ❑ No` For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br /> N N/A <br /> ❑ Yes ❑ No' For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> N N/A <br /> N Yes ❑ No' Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> 87 120 3 25 13 PASS <br /> 89 130 5 27 13 PASS <br /> 91 110 5 25 16 PASS <br /> DSL 100 3 27 21 PASS <br /> Monitoring System Certification Page 3 of 4 2/21/07 <br />