Laserfiche WebLink
Ar- <br /> bl <br /> ED PROGRAM CONSOLIDATED FORM Si'•w <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- Pae I of 2) <br /> TYPE OF ACTION ® L NEW PLAN [12.CHANGE OF INFORMATION - 49x1 <br /> PLAN TYPE ® 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490.2 <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S) <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) <br /> BUSINESS NAME(Same as FACILITY NAME) 3, <br /> George's Mini Mart _ <br /> BUSINESS SITE ADDRESS 101 CITY 101 <br /> 18662 N HWY 88 Lockeford,CA 95237 <br /> H.EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes, line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers' instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> (23 CCEj2632,26L4,2638, -------`---_.--------------------------_- ----------- ------------------------------------------------------------ <br /> MONITORING EQUIPMENT IS SERVICED ® I.ANNUALLY El 99.OTHER(Specify): 4W3b <br /> III.MONITORING LOCATIONS <br /> ❑ 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)4904 <br /> IV,TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br /> I.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 490.5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: ❑ a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM 490'6 <br /> _-_._._ .___.,-___-__---_________.______ .__--.__ _r <br /> PANEL MANUFACTURER: Gilbareo 490- MODEL# EMC °gas <br /> '-'-'-----------------`--'--------- <br /> LEAK SENSOR MANUFACTURER: VEEDER ROOT 490-9 MODEL# S : 420 °solo <br /> 2.AUTOMATIC TANK GAUGING(ATC)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).(23 CCR§2643) 49x11 <br /> PANEL MANUFACTURER: -----M-12 -_MODEL#:---- -'----------------- 49x13 <br /> IN-TANK PROBE MANUFACTURER: 490-14 MODEL#(S): 49x15 <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ I.DAILYNIGHTLY ❑ c.WEEKLY 49x16 <br /> d.MONTHLY � e.OTHER(Specify):________________-___._.___-___-. 490-17490.16 <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h. ❑ c.OTHER(Specify): 490-19 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 49x20 <br /> F] 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: E] a.36 HOURS ❑ b.60 HOURS 4 22 <br /> El 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 49°23 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHEReci 490-24 <br /> (S p �') 490-25 <br /> El99.OTHER (Specify): 49x26 <br /> 49az2 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) (Check all that apply) <br /> 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 49x213 <br /> VISUAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS: At.DRY ❑b.LIQUID FILLED []c.PRESSURIZED ❑d. UNDER VACUUM 490-29 <br /> _ _______-_490-00 49x31 <br /> LEAK SENSOR MAN0 <br /> 1_ }_.__________.:.__.._ <br /> PANEL MANUFACTURER: MODEL# 5W1L__-_----------- <br /> _-_--_-__-__-- <br /> UFACTURER: °9°-32 I MODEL#(S)__�S_ _ 490.3) <br /> PIPING LEAK ALARM TRRIN <br /> IGGERS AUTOMATIC PUMP i.e.,TUBE)SHUTDOWN. ®a.YES ❑b.NO 490.34 <br /> FAILUREIDISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. I§a.YES ❑b.NO 490-35 <br /> 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK_IS DETECTED(23 CCR 1§2T636) 49x36 <br /> MLLD MANUFACTURER(S):VMI,RED JACKET �i�4.iV 490-77 MODEL#(S): 99LD2000 )w{� 490-3s <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR§2636) 490.39 <br /> _ ______________.__.-_-______._.__.------------- <br /> ELLD <br /> __a��_ <br /> _-_-_ _-_.______.490-40 i MODEL#(S): 07051023 <br /> ____ELLD MANUFACTURER(S) _ _ ______ __ _ _ <br /> PROGRAMMED IN LINE LEAK TEST: ❑ I,MINIMUM MONTHLY 0.2 g.p.h. ❑ 2.MINIMUM ANNUAL 0.1 g.p.h. 49042 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑b.NO 49x°3 <br /> ELLD FAILUREIDISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑b.NO 490"g4 <br /> ❑ 4.PIPE INTEGRITY TESTING 49045 <br /> TEST FREQUENCY ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS. ❑ c.OTHER(Specify) 490-1649042 <br /> ❑ 5.VISUAL PIPE MONITORING. 4�8 <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED- 490-49 <br /> 'Allowed for monitoring ofunburied emnerIey gcneraor fuel piping only HSC 252131.5 l <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR§2636(a)(3)1. 49050 <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 49x51 <br /> 490-52 <br /> ❑ <br /> 99.OTHER(Specify) 490-53 <br />