Laserfiche WebLink
IED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 of 2) <br /> VI. UNDERDISPENSER CONTAINMENT(UDC) MONITORING <br /> 1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490-s4a <br /> 490-546 <br /> ❑ I.CONTINUOUS ELECTRONIC MONITORING E 2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE <br /> ❑ <br /> 4.NO DISPENSERS [199_OTHER(Specify)___...__...... <br /> ,-_-._-_--_- <br /> ---- <br /> PANEL MANUFACTURER: 490ss MODEL#: 49056. <br /> _ ___-_-.._.._-_._—___._.._.___________________.__._--._.._--_--__-_-_-_�-- _ ...___.--____-____..___-_____- 490-38 <br /> _____-_-_.__--_-__—_---- 490-57 <br /> LEAK SENSOR MANUFACTURER: MODEL#(S): <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS a YES b.NO 49039 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN a.YES b.NO 490 60� <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. 'a,YES Pf b.NO 490.61 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. a.YES ❑b.NO 49 2 <br /> 2.UDC CONSTRUCTION IS ❑I.SINGLE-WALLED ❑2.DOUBLE-WALLED 490-63 <br /> IF DOUBLE WALLED: 446: a <br /> UDCINTERSTITIALSPACE IS MONITORED BY: [)_LIQUID _❑2.PRESSURE El 33.VACUUM <br /> A LEAK WITHIN THE SECONDARY,CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ,R.YES ❑b.NO 490-641, <br /> VII.PERIODIC SYSTEM TESTING <br /> I. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490.65. <br /> _LEAK DETECTION(ELD�MUST BE PERFORMED_PERIODIC_ELD IS PERFORMED EVERY 36 MONTHS AS REQU]RED_(23 CCR X2644_1)___.-- <br /> E 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. <br /> _ — ----.___--__ --------------------__T-------------------______---__.. __------- _-_-----_4 <br /> 3.SPILL BUCKETS ARE TESTED ANNUALLY. 490fi7 <br /> VIII.RECORDKEEPING <br /> The following monaming/maxttenance records are kept for this facility. <br /> E Alarm logs 49 8. {��75+,Visual Inspection Records 490681, ".Tank integrity testing results 49 8L <br /> ❑SIR testing results(and supporting documentation records). 49o-b8d ❑ Tank gauging results(and supporting documentation records). 49aaae <br /> ❑ATG Testing results(and supporting documentation records).4906af ❑ Corrosion Protection 60-day logs 490.6ag <br /> ® Equipment maintenance and calibration records. 490.68h <br /> IX.TRAINING <br /> E Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to theirjob duties. 49069. <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) . <br /> E THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)49669b <br /> E OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)490b9c <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-69d <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 49 % <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"490-69f <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"490-690 <br /> ❑ OTHER(Specify):m694 moi <br /> This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council HCC). <br /> The"Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> Operation of the UST systems in a manner consistent with the facility's best management practices <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> ➢ Names of contact person(s)for emergencies and monitoring alarms.490-70 <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan.490-71 <br /> oft it rev¢aI�'� oT rnaeAadtA4� Fja rd Set at- �Sa <br /> XI.PERSONNEL RE NSIBMITIES <br /> The UST Owner/Operator is responsible for ensuring that t)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)'.all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The following person(s)are responsible for performing the monitoring and equipment maintenance: <br /> NAME ALEX JABBARI 490.72 TITLE DESIGNATED UST OPERATOR <br /> 490-73 <br /> NAME 490-74 TITLE 490-75 <br /> The Designated Operator shall perform a monthly visual inspection of the facility, provide a report to the owner/operator, and inform the owner/operator of any <br /> conditions that need fol)ft-up action. <br /> XII.OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION: certify that the i formlition provided herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGN E 490-76 DATE: 490.77 <br /> Fa i1i d <br /> APPLICANT NAME(print): 490-78 APPLICANT TITLE: 90079 <br /> Rupinder Padda SEC. <br />