My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
10
>
2300 - Underground Storage Tank Program
>
PR0504834
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2021 11:42:29 AM
Creation date
11/5/2018 8:52:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0504834
PE
2381
FACILITY_ID
FA0006359
FACILITY_NAME
TRACY, CITY OF
STREET_NUMBER
10
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
10 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\10\PR0504834\COMPLIANCE INFO PRE 2016.PDF
QuestysFileName
COMPLIANCE INFO PRE 2016
QuestysRecordDate
5/6/2013 8:00:00 AM
QuestysRecordID
154809
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,RESNA SITE SAFETY PLAN <br /> Job Name: City of Tracy <br /> Job Location: 11th Street (from Corral Hollow Road to MacArthur <br /> Drive) <br /> Client Contact: Mr. Paul Verma <br /> Project Number: W0509.04 <br /> General Work Description: Non-hazardous Hydrocarbon Impacted Soil Excavation <br /> SSP Prepared by: Marcie R. McCabe <br /> Site Safety Officer: Lois Frantz <br /> Project Safety Officer: Sharon Young <br /> This site safety and health plan (SSP) must be kept on-site and accessible to all on-site <br /> employees during all phases of site operations. The SSP must be reviewed and signed by <br /> all on-site employees, subcontractors, and visitors prior to entering the site. General safe <br /> work practices are identified in the RESNA Injury and Illness Prevention Manual and <br /> apply to all RESNA work sites. <br /> The provisions set-forth in this SSP shall apply to RESNA Industries Inc. (RESNA) <br /> employees and any subcontractors working for RESNA at the job site. All personnel <br /> working for RESNA at the job site must read this SSP, and sign the attached Compliance <br /> Agreement before entering the work area. Feld personnel may deviate from the safety <br /> provisions set-forth in this SSP, but only to upgrade or increase the safety requirements. <br /> RESNA personnel may suspend work if unsafe working conditions are identified or <br /> observed, or unauthorized modifications to the safety provisions set-forth in this SSP are <br /> made. If changes in site or working conditions require changes in safety procedures, <br /> appropriate amendments to this SSP will be provided by the RESNA project manager or <br /> supervisor, with the written approval of a RESNA branch safety officer or the RESNA <br /> Health and Safety Director. <br /> PAGE <br />
The URL can be used to link to this page
Your browser does not support the video tag.