My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
10
>
2300 - Underground Storage Tank Program
>
PR0504834
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2021 11:42:29 AM
Creation date
11/5/2018 8:52:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0504834
PE
2381
FACILITY_ID
FA0006359
FACILITY_NAME
TRACY, CITY OF
STREET_NUMBER
10
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
10 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\10\PR0504834\COMPLIANCE INFO PRE 2016.PDF
QuestysFileName
COMPLIANCE INFO PRE 2016
QuestysRecordDate
5/6/2013 8:00:00 AM
QuestysRecordID
154809
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� v <br /> _ RFSNA Industn Inc. <br /> Quality Assurance/Quality Conttvl Plan <br /> Revved November 1992 <br /> To reduce the potential for cross contamination between wells, the monitorings will take place <br /> in order from the least to most contaminated, if known. Wells containing free product will be <br /> monitored last. Between each well monitoring the equipment will be decontaminated. <br /> Water level data collected from the wells will be used to develop a groundwater contour map <br /> for the project site. Groundwater flow will be estimated to be perpendicular'to equipotential <br /> lines drawn on the map. <br /> 10.0 WELL DEVELOPMENT PROTOCOL <br /> Groundwater monitoring wells will be surged and developed prior to setting the surface seal. <br /> Approximately 10 times the volume of water in the casing will be withdrawn if possible. Casing <br /> volumes will be calculated in the following manner: <br /> VOLUME OF.-SCHEDULE 40 PVC PIPE <br /> Diameter (inches) I.D. (inches) Volume . <br /> Gal/linear feet <br /> 2 2.067 0.17 <br /> 4 4.026 0.66 <br /> VOLUME OF OPEN BOREHOLE AND ANNULAR SPACE BETWEEN CASING:AND HOLE;; <br /> Nominal Volume/Linear-Feet•.oi <br /> Hole Volume/Linear Feet of Hole Casing Annular Space` .; <br /> Diameter <br /> Diameter <br /> Gallons <br /> Gallons Cubic Feet (inches) Gallons Cubic Feet '. <br /> 7.25 2.14 0.29 2 1.91 0.26 <br /> 8.25 2.78 0.37 2 2.55 0.34 <br /> 10.25 4.29 0.57 2 4.06 0.54 <br /> 10.25 4.29 0.57 4 3.46 0.46 <br /> 12.25 6.13 0.82 4 5.30 0.71 <br /> ' Annular volumes will be multiplied by 30% to account for porosity of filter pack. <br /> QAQCIM.FNL 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.