My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
10
>
2300 - Underground Storage Tank Program
>
PR0504834
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2021 11:42:29 AM
Creation date
11/5/2018 8:52:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0504834
PE
2381
FACILITY_ID
FA0006359
FACILITY_NAME
TRACY, CITY OF
STREET_NUMBER
10
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
10 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\10\PR0504834\COMPLIANCE INFO PRE 2016.PDF
QuestysFileName
COMPLIANCE INFO PRE 2016
QuestysRecordDate
5/6/2013 8:00:00 AM
QuestysRecordID
154809
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESNA Industncs Inc. <br /> Quality Assurance/Quality Control Plan <br /> Rented November 199^- <br /> If the aquifer is slow to recharge, development will continue until recharge is too slow to <br /> practically continue. The volume of water produced versus time will be recorded. <br /> All withdrawn groundwater will be stored on-site in 55-gallon waste drums unless permission <br /> is granted by the appropriate regulatory agency to discharge the water to the ground surface or <br /> sanitary sewer. Drummed water will be labeled with the source of the water to help ensure <br /> appropriate disposal based on contamination levels. <br /> 11.0 SOIL SAMPLING PROTOCOL <br /> 11.1 Sample Collection During Drilling Activities <br /> A proposal will be submitted to the lead regulatory authority with proposed <br /> boring/sampling locations. The exact location and number of borings at each site will <br /> be determined in the field by the Project Geologist/Engineer. <br /> Prior to arriving at the sample site, the drill rig/augers will be steam cleaned and all <br /> sample equipment will be cleaned. Cleaning will be conducted on-site on all sampling <br /> equipment between each sample interval. <br /> Soil samples will be obtained using a California modified split-spoon sampler containing <br /> three 6-inch long, 2-inch diameter brass tubes. The sampler will be driven 18-inches <br /> ahead of the hollow stem auger by a 140-pound hammer with a 30-inch drop in <br /> accordance with American Society for Testing and Materials (ASTM) Methods D 1586- <br /> 84 for split barrel sampling of soil and D 1587-83 for thin-walled tube sampling of soils. <br /> The blows required to drive the sampler each 6-inch interval will be recorded on the <br /> boring log. The sampler will be removed from the boring and opened to reveal the brass <br /> QAQCIM.FNL 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.