<br /> »z °
<br /> i 1, 0 General The foundation for. the tanks shall be fire soil suitably Vent Imes must slope up continuously
<br /> uz The contractor accepts full responsibility for proper handling graded, level , and have 6" of clean sand. The tanks shall from tanks at a minimum of 1/8" per foot and shall be
<br /> and installation of the underground storage tank and piping, be encompassed by' clean sand, rree of traps and sags , All lines must be installed on
<br /> and shall insure that good workmanship is followed during all a minimum of 3" of sand bedding and between pipe and side
<br /> WE
<br /> construction, if the ground is not of fire soil and/or there is a high jr trench, Test piping before backfilling trenches,
<br /> water table, the tanks shall be installed with a concrete ,upon completion of test, backfill trenches to subgrade
<br /> The contractor Is responsible for inspecting the tanks for damage deadmen and hold down straps. nith sand, hand tamp and water puddle for 90% relative
<br /> and insuring proper holiday testing is performed on tanks before . ompaction . ,
<br /> installation into tank hole. The backfill material must be capable of being 95% compacted,
<br /> [tie material shall then be placed in 6" layers and tamped ane,i testing piping, all lines must be tested . Notify COM13A
<br /> TINY i
<br /> The Presence of a company representative at the job site does Jown. Cradles , saddles, or shocking blocks should not be used cr.ner' s representative 24 hours in advance of testing ,
<br /> not relieve the contractor of the reponsibility for the proper as they may cause tank failure due to stress concentrations: ise air test Procedures, Provide any other test( s) that
<br /> handling and testing of the storage tanks : Idy be required by local codes. AINCHITECTS
<br /> temuve all threadlor flange protectors from the unused
<br /> 2, 0 Storage Tanks Jaenings, Then , close Off these Openings with Steel pipe _,, ,� "ete Work
<br /> The Customer Company will purchase and provide, to the Contractor, J.119S or gaskets using proper joining seal . Luncrete work must be of the highest standards, MediumING
<br /> the storage tanks . The contractor is to arrange the delivery time broom finish, concrete to be of black finish using 8 lbs.
<br /> for the storage tanks at the job site, The Customer Company will Ne, tanks are to have a 1% slope The fill or yard.
<br /> also provide tank straps , if needed, and will be delivered with -,yid to be lower than turbine end ,
<br /> the tanks, _ , ..actor is responsible for any damaged concrete or
<br /> ;, J Jouole Containment Tank Monitor .,Phatt that may be done during the installation of the tanks
<br /> Tang manufacturer and contact: Modern Welding Co. . Inc, Ine contractor must provide a riser and 12" cover box on the any other work that is associated with the job, The 940 TYLER SFREE SFUD10 23
<br /> 4141 N . Browlev Ave. fill end of the tank. _ntractor is to repair or replace any damaged concrete or IIENICIA, CALIFORNIA 94510
<br /> Fresno, CA 93711 �Phalt before job is considered complete.
<br /> (209)275-9353 eak-X monitor or similar electronic monitoring device will 1 t (415)682-0502
<br /> used and suppi!ied by The Customer Company , _ n up
<br /> Tanks being used are: Double Containment, Fiberglass coated, A ea to be cleaned up when work complete. This includes all
<br /> J�e, fill Protection equipment and materials. Job site is to be swept up and left
<br /> Waste Oil tanks will be 520 gallons Ine Customer Company will provide to the contractor, overfill a condition acceptable to The Customer Company ,
<br /> SPP cas olan for details protection boxes , : The contractor will be responsible for
<br /> installing the ov�ierfill boxes as specified in plans and ,ullt Plans
<br /> manufacturer , The overfill boxes supplied will be: contractor to provide as-built plans at time of completion.
<br /> 'dinecb 111-V container with manual drain valve. The job will not be considered complete until as-built plans
<br /> EOUIPMENi TU 3c 'NSIALLED BY CUNTRACTOR: e at The Customer Company main office , Plans are to include
<br /> I efify all dimensions measurements
<br /> " Underground waste oil tanks by Modern Welding, Glasteel urate underground piping layout of all piping done by and data at the site. Report aRv
<br /> A errors discrepancies or questions to
<br /> Leak Detectors - Red Jacket #116-017 _ntractor ,
<br /> the project manager These drou Ings,
<br /> " Pit Boxes - Pameco 30" 0are InsIfflineWS of sen ice prepared
<br /> D. J rp.'ig ru, k tor contract construction nork,and
<br /> Fill Boxes - Pameco #113-U A: 1 vapor, and vent undergorund lines are to be best grade
<br /> Fill Adaptor & Cap - OPW 4636- 1I fiberglass Piping using either Civa Blegy Duraloy 3000 permissit m.
<br /> " Fill Drop Tubes, Coaxial - EW#A88-001 A,O . Smith Red Thread , Job to be exclusively of one
<br /> ° Vent Vapor Extractor Valve - Universal #V-420, 4"x4"x2" i, and of pipe ,
<br /> Access Boxes, .12" - EW#A717-022
<br /> no ;ustomer Company will provide a vent extractor valve
<br /> 3, 0 Regulations or vent to be installed by the Contractor , The Customer 7
<br /> The contractor is to secure all permits required by the Fire umpany will run the electrical conduit in vent ditches FOOD & LIQUOR 37
<br /> Department, City, County, State agencies, and all air pollution -or The Customer Company , Contractor to notify The Customer —-- _—_
<br /> control permits from local districts , Also, the contractor is -umpany in a reasonable time as to when ditches will be 15 West G rantllne
<br /> to provide the electrical permit required,
<br /> oadv for conduit i Tracy, Ca
<br /> All pork is to conform to the present regulations as set �, . �tp.ng Specificat}ons
<br /> forth by these government agencies, All inspections are hutting - fiberglass piping shall be cut using a fine tooth
<br /> the responsibility of the contractor, hacksaw blade . Ends should be cut as square as possible to
<br /> iisure proper tapering. The Customer Co
<br /> 4. 0 New tanks are to be installed in accordance with manufacturers
<br /> specifications, These specificat-ions are as. follows: duoring - of fiberglass pipe shall be accomplished by the PO. BOX 886 Benicia , Ca
<br /> aye of a tapering toot as supplied pY the manufacturer,
<br /> auks installed In areas that will be subjected to vehicular -finish taper shall be smooth, cleanand free from any surface
<br /> traffic shall be protected by either 18" of compacted soil jefects,
<br /> )4us 6" of reinforced concrete, or 8" of asphalt paving extend-
<br /> :ng at least one foot from the tank in all directions, or, -roorglass piping shall be connected to galvanized piping
<br /> Dy a minimum of 3 feet of soil , nith threaded endladapters. Threaded end adapters , when used
<br /> .rt Vent riser locations, under pump Islands, at remote pump SHEET FIFLE
<br /> ine excavation of underground tanks that will be subjected tojild tank connections, etc, ,, shall be threaded onto galvanized
<br /> oehicular traffic shall be one to provide a minimum cover of 21 SPECIFICATIONS
<br /> if soil , or one foot of soil under a reinforced concrete pad ).Ping or fittings before bonding on fiberglass piping,
<br /> SCOPE OF WORK
<br /> of not less than 4" thick. The excavation shall also be free surfaces to be bonded shall be cleaned with solvent as
<br /> if any water or liquid during the installation procedures, ,applied by the p�pe manufacturer , Apply adhesive to both REVISIONS DALE
<br /> ;urfaces and Insert the spigot into the bell using a slight
<br /> _urning motion while pushing, Apply pressure until mechanical
<br /> uck Is achieved.
<br /> I)ate Drawn By
<br /> Job No. Checked By
<br /> SHEET
<br /> OI' SHEETS
<br />
|