<br /> DIVISIONi - General Rq uirements 041 Project Coordination G. Contract Documents at the Jobsite
<br /> I . The Contractor shall keep one copy of all contract documents,
<br /> SUMMARY OF WORK A. Cooperation including all approved drawings, shop and setting drawings, speclfi-
<br /> 1. The Contractor and each of his subcontractors shall particularly cations, addenda, and change orders, complete and In good order, at
<br /> A. General cooperate as follows: the jobsite and available to representatives of the Owner, the .
<br /> This section sets forth general project scope and Information for a. Consult with those doing work not in contract or under other Architect, and Public Agencies having Jurisdiction,
<br /> the installation of the Gasoline Pump Islands, underground tanks, divisions to ascertain the locations of their various materials
<br /> concrete slab, canopy, vents and other related items, and to familiarize them with his own material locations, making H. Right of Entry To and Protection of Adjacent Premises
<br /> •
<br /> such changes as may be required to obtain the best results in I. When use of adjacent properties is necessary for accomplishing the
<br /> S. Applicable Building Codes the opinion of the Architect. whose decision shall be final . work, it shall be the obligation of the Contractor to make arrange-
<br /> Building construction shall comply with the Uniform Building Code 1982 b. Schedule work and cooperate wlzh those doing work under other ments with the Owners of such properties for such use, Otherwise,
<br /> Edition. Installation and materials shall comply with provisions of divisions so as to avoid delays, interferences and unnecessary the Contractor shall avoid any encroachment on adjacent properties.
<br /> applicable Building Codes and with other rules, regulations and ordinances work, conforming to the schedule of operations, making the
<br /> governing construction. Building Code requirements take precedence over installation when and where directed. 1 . Perml [s and Licenses
<br /> drawings, and it shall be the responsibility of anyone supplying labor or c. Make all necessary changes, Including removal and reinstalling 1. Contractor shall secure and pay for the building permit. r
<br /> materials, or both, to install his work In conformance with the codes of materials at no cost to the Owner, occasioned under other The Owner will pay the plan checking fees.
<br /> and to bring to attention of the Architect any discrepancies or conflict divisions whose installed work may be later found to Interfere 2• Any and all other permits and licenses required for this project
<br /> ' between requirements of codes and drawing documents. In conflicts between with work of other divisions. shall be secured and fees paid for by the Contractor.
<br /> U.B.C. and Local Codes, the Local Code shall take precedence. 2. inspection of Materials and Work: The Contractor shall make a
<br /> close Inspection of all materials as delivered and all work in pro- J. F111ng and Recording
<br /> press and shag ! promptly reject and return all defective materials 1 . The Contractor shall file with the County Recorder the complete
<br /> C. Catwllance with Ail Building Laws and Codes and replace any substandard work without waiting for their rejection Contract, consisting of the signed Agreement of Contract, the Surety
<br /> Contractor shall conform to and abide by all local . city, county, and state by the Architect. Bonds, and the signed Drawings and Specifications. Contractor shall
<br /> building and sanitary laws, rules and regulations, and Industrial safety laws. Pay the recording fee and send the Recorder's receipt to the
<br /> Such laws shall be considered as an essential Dart of these Specifications and. 1 . Contractor shall employ a capable superintendent who shall be in B. Supervision Architect before commencing any work.
<br /> �
<br /> In the absence of definite requirements herein, the provisions of such rules full charge of operations under the contract, including all 2, The Owner will file and pay fee for the Notice of Completion.
<br /> and regulations shall be observed by the Contractor. if the Drawings and/or sub-contractors. He shall be on the Job at all times when
<br /> Specifications are at variance therewith, Contractor shall so notify Architectcontract operations are !n progress and shall be in charge of this K. Conferences
<br /> promptly. Should the Contractor perform any work contrary to such laws, contract only. 1. At any time durL-ig the progress of the work, the Architect or
<br /> ordinances, rules and regulations, he shall bear all costs arising therefrom. Owner shall have authority to require the Contractor and his
<br /> Where these Specifications, however, call for or describe materials, workman- 2. fromSupethe Archindenttect,
<br /> shall be authorized to receive and execute orders Subcontractors to attend a conference of any or all of the contract-
<br /> ship or construction of a better quality. higher standard, or larger size than from the Architect, and shall not be removed unless the Architect urs engaged on the work, and any notice of such conference shall be
<br /> is required by said rules and regulations. the provisions of these Specifica-
<br /> Is notified and approves the proposed replacement. duly observed and complied with by the Contractor and his Sub-
<br /> tions shall take Precedence over said rules and regulations. Contractor shall C. Project Responsibility contractors.
<br /> furnish, without any extra charge, all additional labor or materials, or both, I. Architect assumes no responsibility for observation of construction, L. Other Contracts
<br /> when required for compliance with these rules and regulations. Any changes or Proper execution of work shown on drawings. Architect is not 1 . Construction operations for work other than the work under this
<br /> which must be made because of compliance with these rules and regulations must
<br /> responsible for acts or omissions of contractor, and subcontractor, contract may be conducted on the job site and premises. The
<br /> be submitted to and be approved by the Architect before making such changes.
<br /> their agents or employees. or any other Person performing any work Contractor shall cooperate with the Owner and other contractors in
<br /> on this project. all matters relating to work and use of facilities at the site M ,
<br /> D. Scope of Work2. The Contractor shall assume the risk of possible delays to his work
<br /> Shall consist of all labor, materials, equipment, tools, transportation, 2. Contractor shall indemnify and hold harmless Owner, and Architect
<br /> services and operations necessary to furnish and install the work under this and their agents. and employees from and against all claims, due to other work, not Included be this contract, at the site and
<br /> Contract, Including all major, auxiliaryfur and incidental Work and materials no additional compensation shall be made therefor.
<br /> damages, losses and expenses Including attorney' s tee arising out
<br /> necessary to achieve complete, compatible and incidental
<br /> installation er shown of or resulting from performance of work provided that any such j• If due to other work at the site the Contractor sustains a delay
<br /> claim, damage, loss or expense is attributable to bodily Injury, which could not have been avoided by the judicious handling of
<br /> or soeclfied. sickness, disease or death, or to injury to or destruction of forces, equipment and material , and provided the Contractor notifies p p
<br /> tangible property (other than the work itself) including loss of the Owner , in writing, of the delay, (with substantiating evidence) FOOD & LIQUOR 37
<br /> E. Material Deliverywithin 15 calendar days of the beginning of the delay, consideration
<br /> Material deliveries to site shall Include unloading, When Intermediate storage use resulting therefrom, or is caused In whole or in part by any
<br /> is required, placement at storage areas, Protection and moving shall be pro- negligent act or omission of the contractor, any subcontractor, or the
<br /> a time extension Will made. If a time extension igranted, 15 West G ra n Cline
<br /> anyone directly Of indirectly emp l0yed by any Of them or anyone the Cpntrattdr shall be relieved Of any Claim by the Owner for
<br /> vided as necessary. g me extension.for whose acts any of them my be liable, regardless of Whether or liquidated damages or Penaltyduring such titiTracy, CQ
<br /> F . tlanufacturers' Specifications and Instructions not it is caused in Dart by a party indemnified hereunder, Documents
<br /> 3. Architect not responsible for methods used (n how field work is M. Intent of Accuracy:Unless otherwise noted, all manufactured materials, products, processes, equip- 1 . Data Accuiracv :
<br /> ment or the like shall be Installed or applied In accordance with manufactur- Performed; safety in , on, or about the job site; or methods of
<br /> er's Instructions.- directions or. specifications. Said application or Install- performance or timeliness in performance of work. a Pipinngg,,Thedrawings loocava indicate the general arrangement and location of
<br /> tions of apparatus and equipment. Should It be The Customer Co
<br /> ation shall be In strict accordance with printed Instructions furnished by the necessary to deviate from arrangement or location shown in order
<br /> manufacturer of the material concerned for use under conditions similar to U. Construction Safety, sanitation mePO. Box 886 Benicia, 'Ca
<br /> [hose at the lob site. Two copies of such instructions shall be furnished to 1 . Contractor shall be entirely responsible for construction to et structural or architectural conditions or because of Any safety and compliance with O.S.H.A. , State, and applicable Local interference with other work, such deviations shall be made
<br /> the Architect and his approval thereof obtained before work is begun. h
<br /> wlthowt expense to the Owner, and after first notifying the
<br /> deviation from the manufacturer' s printed recommendations shall be explained safety regulation. and provide temporary sanitary facilities as
<br /> required by governing regulationsProject clean-up shall be per- Archittect.
<br /> .
<br /> and acknowledged as correct for the circumstances, to writing by the partitular D. txtrerne accuracy of the data given In the specifications and on
<br /> manufacturer. Contractor will be held responsible for all Installations formed by Contractor as required to assure safety, and reasonable
<br /> contrary to the manufacturer' s recommendations. If any item of equipment or working environment, tae drawings is not guaranteed. The drawings and the ctff-
<br /> cations are for the assistance and guidance of the Contractor,
<br /> material Is found to be installed not In accordance with the manufacturer's
<br /> E. Site Investigation and exact locations, distances and levels will be governed by SHEET TITLE
<br /> recommendations, Contractor shall make all changes necesssary to achieve such the building site and actual building conditions.
<br /> 1 . Contractor shall visit the site and satisfy himself as to the nature SPECIFICATIONS
<br /> compliance, and location of the Contract. the general and location conditions, c. Architects Project Coordinator shall be immediately notified
<br /> and all other matters that in any way effect the work. Fallure of in wriiting by contractor should any discrepancy or other
<br /> G. worlmtanshtp
<br /> Shop and field work shall be Performed by mechanics skilled and experienced in the Contractor to acquaint himself with all available Information question arise pertaining to working drawing documents.
<br /> the fabrication and Installation of the work Involved. All Work on this concerning conditions will not relieve him from responslbllity for
<br /> d. In the event that certain features are not fully shown on the REVISIONS �— DATE
<br /> Project shall be done In accordance with the best practices of the various estimating the difficulty or the cost of the work. urawings, their construction shall be of the same character as
<br /> trades Involved and In strict accordance with the Drawings, approved Shop 2 . The Contractor and all Sub-Contractors shall verify all for similar conditions that are shown.
<br /> Drawings, and these Specifications. All work shall be erected and instai ;ed existing conditions, dimensions, and recipient surfaces to determine e. Any detail which is unclear or ambiguous shall be referred to
<br /> Pltmtb, level . square and true, and In proper alignment and relationship to the their suitability to receive any required additional construction or the Architect for clarification or interpretation.
<br /> work of other trades. All finished work shall be free from defects. Architect finishes, Any discrepancy shall be reported to the Architect. r . General notes are complementary to drawings and considered as
<br /> reserves the right to reject any materials and workmanship which are not con- Commencing work indicates acceptance of conditions and surfaces. Part of drawing documentation. Drawings take precedence over
<br /> sidered to be up to the highest standards of the various trades Involved. Such specifications in case of dispute, and denoted dimensions on DateDrawn By
<br /> inferior material or workmanship shall be replaced at no additional cost to the F. Drawing and Site Coordination drawings take precedence over scaled drawings ,
<br /> Owner. 1 , Dimensions and conditions at job site shall be verified by all
<br /> g. Any part of the work not mentioned In the Specifications but Job No. Checked By
<br /> contractors before commencing fabrication or Installation work, shown on the Drawings, or any part not shown on the Drawings
<br /> H. work on Adjacent Prooertles Discrepancies on drawings or between drawings and actual field but described in the Specifications, shall be constructed by SKEET
<br /> Properties,elther public or private and outside of Project Property lines conditions shall be Immediately reported to Architect and General the Contractor as If fully described in the Specifications and PR ' NI E "�
<br /> Indicated, shall be Included and provided as work under the Contract If part!- P
<br /> shown on the Drawings, Items of materials or work specified SEP I (;
<br /> 1987
<br /> cularly shown. Contractor. Corrected drawings or Instructions shall be issued or noted on the Drawings, which are in conflict with these
<br /> prior to continuation of work. Specifications, shall take precedence over these Specifications.
<br /> 2. Dimensions take precedence over scale. Dimensions shown are marked
<br /> to Face of Concrete (F.O.C. ) , or Face of Studs (F.O.S. ) , or Face pp siIEETS
<br /> of Masoovy (F.O.M. ) , or Center Line of Studs unless otherwise
<br /> indlcat*4:
<br />
|