Laserfiche WebLink
Page S of 3 <br /> SWRCB,January 2002 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer X Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: X Pressure ❑Vacuum . ❑Hydrostatic <br /> 0 Other(Specify) <br /> Test Equipment Used: See attached testing procedures Equipment Resolution 3 <br /> piping Run# rJ Piping Piping Run GY?Ia Piping Run <br /> Piping Material: <br /> Piping Manufacturer: VIA9 OA/ *' M S/`Z/nr <br /> Piping Diameter: <br /> Length of Piping Run: T— <br /> Product Stored: ( /��3L/••� �/ - ✓-- <br /> Method and location of <br /> piping-run isolation: <br /> Wait time between applying 30 minutes 30 minutes 30 minutes 30 minutes <br /> pressure/vacuum/water and <br /> starting test <br /> Test Start Time: <br /> Initial Reading(R): S/ <br /> Test End Time: ` /S 2 U Iola? <br /> Final Reading(RF): S /S / Pf <br /> Test Duration: 1 hour 1 hour 1 hour 1 hour <br /> Change in Reading(RF &): fid_ - -4&-- <br /> Pass/Fail Threshold or 0.00 0.00 0.00 0.00 <br /> Criteria: <br /> Test Result: I A Pass ❑Fail .?�Pass l7 Fail XPass ❑Fail ❑ Pass 0all <br /> Comments— (include information on r�Eirs made prior to testing and recommended follow-up for failed tests) <br /> IlAodg& 51-'C'o'u 'g ;;07cC21-, 5 CO AJOw9te Yy/,�� �'.r'�iAee7� FYr 22/-C <br /> SB 989 3-Year Compliance Testing <br /> WO#060310-045 <br /> COSTCO#200737 <br /> 3250 W Grant Line/Hwy 205 <br /> Tracy,CA 95304 <br />