My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2002
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
3250
>
2300 - Underground Storage Tank Program
>
PR0518288
>
INSTALL_2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2023 1:00:14 PM
Creation date
11/5/2018 9:19:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2002
RECORD_ID
PR0518288
PE
2361
FACILITY_ID
FA0013810
FACILITY_NAME
COSTCO WHOLESALE #658
STREET_NUMBER
3250
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
3250 W GRANT LINE RD
P_LOCATION
03
QC Status
Approved
Scanner
WNg
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\3250\PR0518288\INSTALL 2002.PDF
QuestysFileName
INSTALL 2002
QuestysRecordDate
7/5/2017 9:39:11 PM
QuestysRecordID
3482255
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
250
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
09'26.2002 11:19 FAX 125 251 8782 BARGHAUSEN 0036 <br /> 091'13/2002 11:18 523 <br /> IPF INC <br /> PAGE 05 <br /> AlItech <br /> 17759 Buttz-r:up circle, Sonora, CA 95370 <br /> Phone: 209-532-7320; FRc_ 209-533-2650 <br /> California Tank Tester: 90-1068 <br /> California Contractor 623b41 A-Hoz <br /> al teel mlode_com <br /> ppipwaSIOm TEST DATA SHEET for PIMG <br /> Facility: Costco 658 Date: Sep. 12, 02 <br /> Address: 3254 Grant Line Rd. <br /> City: Tracy CA <br /> FaC lity contact: W.A. Craig Phone: <br /> L.I.A.: San Joaquin-, Michelle L.I.A. Phone: 209-468-3451 <br /> 14asstech Accu-Rite Pressurized Pip' g Tester <br /> Product Reg 1 Prem <br /> Turbine isolation method * BV BV <br /> Dispenser isolation method Im -Imp <br /> Test pressure, PSI 50 50 <br /> Initial cylinder level 0.0500 0.0500 FEE I <br /> Final under level 0.0490 0.0495 <br /> Time Started 1130 1200 <br /> Time Completed 1200 1230 <br /> Total test time, minutes 30 30 <br /> RP.sult: volume change in GPH 0.002 0.001 <br /> conclul!i0n: 'Pass/Fail PASS Pass <br /> Leak Detector Test: Paas Pass <br /> * Pass/Fail threshold is 0.01.x]0 GPM per Manufacturer's protocol <br /> Remarks: The line from Reg 1 feeds the row of islands closest to the building. <br /> The line from Reg 2 feeds the row of it3lands closest to the taroks_ There is a <br /> crossover line that permits use of either regular turbine to feed all islands in <br /> case of a failure. Testing either line with this crossover open, allows testing of <br /> all the regular lines at once_ The ball valve in the crossover was closed prior to <br /> testing line leak detectors. <br /> Test tech: � � - Mike Dotten, License 98-106S F.c+.3f 6!}003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.