Laserfiche WebLink
ECEf10050 <br /> 4.0 <br /> UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- age 1 of 2) <br /> TYPE OF ACTION ❑I.NEW PLAN Q 2.CHANGE OF INFORMATION Ova <br /> PLAN TYPE ❑ 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490'2 <br /> (Check one item only) ® 2.TIES PIAN COVERS ONLY THE FOLLOWING UST SYSTEM •Tank#4-LUBRIZOL <br /> I. FACH rrY INFORMATION <br /> FACUM ID#(Agency Use Only) - - 1 <br /> BUSINESS NAME(Same s0-FACILITY NAME) Costco Gasoline(Loc.No.658) 3. <br /> BUSINESS SITE ADDRESS 3250 West Grant Line Road Im. CITY Tracy IN. <br /> H.EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent.and that such work must be performed by qualified personnel. <br /> 23 CCR 2632,2634 2638 2641 <br /> MONITORING EQUIPMENT IS SERVICED 1.ANNUALLY [] 99.OTHER(Specify): 4�3p <br /> III.MONITORING LOCATIONS <br /> ❑� 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. E 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 263/)49o-4 <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S); <br /> ❑� 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 490-5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENTIS: ❑ a.DRY b.LIQUID FILLED ❑ c.PRESSURIZED E d.UNDER VACUUM 4904 <br /> PANEL MANUFACTURER: Veeder-Root 490-2 MODELP TLS-1450R 492 <br /> LEAK SENSOR MANUFACTURER: Veeder-Rout 490-9. MODEL#(S): 794380-303 49010 <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALI�TANWSI.(23 CCR§2643) 490-11 <br /> PANEL MANUFACTURER 490"12' MODEL q: 490'13 <br /> IN-TANK PROBE MANUFACTURER: 490'14' MODEL#(S): - 490'15 <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILYINIGHTLY ❑ a WEEKLY 49016 <br /> ❑ d.MONTHLY ❑ c.OTHER(Specify): 490'17 <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h. ❑ e.OTHER(Specify): 490-18 <br /> 49019 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 49020 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(ATG)(23 CCR§2645). TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 4921 <br /> 490,22 <br /> S.TANK INTEGRITY TESTING(23 CCR§2643.1): 490-23 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY E c.OTHER(Specify): 49U25 <br /> ❑ <br /> 99.OTHER (Specify): 49026 <br /> 490,27 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check aR that apply) <br /> 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 4928 <br /> VISUAL ALARMS. (23CCR§2636) <br /> SECONDARY CONTAINMENT IS:[Ea.DRY Eb.LTQUID FILLED [1c.PRESSURIZED Wd.UNDER VACUUM 490¢9 <br /> PANEL MANUFACTURER: Veeder-Rom 490-30 MODEL#: TIS-35oR 49x1 <br /> LEAK SENSOR MANUFACTURER Veeder-Root 490-32 MODEL#(S): 794380-323,794360-3D4.657280-100 490-33 <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. N a.YES ❑b.NO 490'34 <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ®a.YES ❑b.NO 49x35 <br /> 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 gp.b.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED(23 CCR§2636) _ _ 490-36 <br /> MLLD MANUFACTURER(S): FE Petro 490.17 MODEL#(S): STP-MLD-D 490'18 <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR§2636) 49039 <br /> ELLD MANUFACTURER(S) 490-40. MODEL#(S): 49041 <br /> PROGRAMMED IN LINE LEAK TEST: ❑ 1.MINIMUM MONTHLY 0.2 g.pb. ❑ 2.MINIMUM ANNUAL 0.1 g.p.h. 49042 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 45043 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 49044 <br /> ❑ 4.PIPE INTEGRITY TESTING 49o4s <br /> TEST FRE UENCY ❑ &ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) 4904649047 <br /> 5.VISUAL PIPE MONITORING. 49040- <br /> FREQUENCY ❑ a DAILY ❑ b.WEEKLY ❑a MIN.MONTHLY&EACH TDa SYSTEM OPERATED* 49049 <br /> •AlloaW formoui o[uvbudad oma w¢a[m reel I19C 2528L5 <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR§2636(a)(3)]. 490-50 <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7]IS CONNECTED TO THE TANK SYSTEM <br /> 490-51 <br /> ❑ <br /> 99.OTHER(Specify) 49asz <br /> 49053 <br /> UPCF UST-D(12/2007)1/4 <br />