Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM - <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 of 2) <br /> VI.UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> I. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 4W54 <br /> Oso s <br /> ❑ 1.CONTINUOUS ELECTRONIC MONITORING ❑2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE <br /> 4.NO DISPENSERS 1199.OTHER S eci ): <br /> PANEL MANUFACTURER: a9o-5s MODEL#: 490.56. <br /> LEAK SENSOR MANUFACTURER: 490.57 1 MODEL#(S): 4W58 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑ a.YES ❑b.NO 490-59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN ❑ a.YES ❑b.NO 490-60. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑b.NO 490.61 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER ❑ a.YES ❑b.NO 49x62 <br /> 2.UDC CONSTRUCTION IS 111.SINGLE-WALLED 112 DOUBLE-WALLED 490.65 <br /> IF DOUBLE WALLED: 4908 <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: 1.LIQUID ❑2.PRESSURE El 3.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑a.YES ❑b.NO 49x641 <br /> VII.PERIODIC SYSTEM TESTING <br /> ❑ 1.ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490.65. <br /> L ETECT1034(E D MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED. 23 CCR 2644.1 <br /> [12.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 490-66 <br /> 0 3.SPILL BUCKETS ARE TESTED ANNUALLY. 49067 <br /> VIII.RECORDKEEPING <br /> The following monitoring/maintenance records we kept for this facility: <br /> Alarm logs 49068a K Visual Inspection Records 490-6x75 ❑Tank integrity testing results 490.680 <br /> ❑SIR testing results(and supporting documentation records). 4904sd ❑ Tank gauging results(and supporting documentation records). 490-68e <br /> ❑ATG Testing results(and supporting documentation records).490-6sf ❑ Coaosion Protection 60-day logs 490-6eg <br /> X Equipment maintenance and calibration records. 49MM <br /> IX.TRAINING <br /> bl Personnel with UST monitoring responsibilities are familiar with all of the following documents mIevantto their jab duties. 4W69a <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> N THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)490-6% <br /> N OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)49049c <br /> ❑ CALIFORNIAUNDERGROUND STORAGE TANK REGULATIONS 4W69d <br /> ❑ CALIFORNIAUNDERGROUND STORAGE TANK LAW 49"9. <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION'49069f <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"490.699 <br /> ❑ OTHER(Specify):M69h,t.669i <br /> ❑1 This facility has a'Designated UST Operator"who bas passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> The"Designated UST Operator'will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of him.This <br /> training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices <br /> D The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> D Names of contact person(s)for emergencies and monitoring slams.490.7o <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information an specific monitoring procedures we attached to this plan.490-71 <br /> Audible and visual overfill alarm set at 90%of tank capacity for overfill protection.See additional attachment. <br /> XI.PERSONNEL RESPONSIBILITIES <br /> The UST OwncdOpergtor is responsible for ensuring that:l)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The following person(s)we responsible for performing the monitoring and equipment maintenance: <br /> NAME Tim Hurlocker 490.72 TITLE Director of Gasoline Operations I9a73 <br /> NAME Dennis Bock 49x74 TITLE Environmental Compliance Manager 490-75 <br /> The Designated Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and inform the owns/operator of any <br /> conditions that need follow-up action. <br /> XII.OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:T certify Atit momationXovided herein is true and accurate to the best ofmy knowledge. <br /> APPLICANT Ssrel ❑ saa[ixofO,.4,9�n0-76 DATE:�`I I I <br /> 490-77 <br /> s- G� ` <br /> APPLICANT NAME(print) <br /> 490-78 APPLICANT TITLE: 490-79 <br /> David H Rogers Director of Real Estate Development <br /> UPCF UST-D(12/2007)3/4P'�'' G <br /> vv� V <br />