My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
3250
>
2300 - Underground Storage Tank Program
>
PR0518288
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2021 3:29:25 PM
Creation date
11/5/2018 9:26:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0518288
PE
2361
FACILITY_ID
FA0013810
FACILITY_NAME
COSTCO WHOLESALE #658
STREET_NUMBER
3250
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
3250 W GRANT LINE RD
P_LOCATION
03
QC Status
Approved
Scanner
WNg
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\3250\PR0518288\BILLING 2013-2015.PDF
QuestysFileName
BILLING 2013-2015
QuestysRecordDate
7/5/2017 11:33:39 PM
QuestysRecordID
3483654
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-TNIFIED PROGRAM CONSOLIDATED FOR? <br /> �../ UNDERGROUND STORAGE TANK E� <br /> MONITORING PLAN- P REC <br /> e 1 of 2) a ,Cly <br /> TYPE OF ACTION ❑ 1.NEW PLAN ® 2.CHANGE OF INFORMATION APR 2 7 2012 490.1 <br /> PLAN TYPE ® 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2 <br /> (Check one item only) [112.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): -1 A - w ' <br /> 1. FACELITY INFORMATION <br /> FACILITY ID#(Agency Use Only) 1 <br /> BUSINESS NAME(Same as FACILITY NAME)COSTCO WHOLESALE GAS STATION#658 Fi 2012 3 <br /> BUSINESS SITE ADDRESS 3250 W GRANT LINE ROAD 103 crry TRACY 104 <br /> IL EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE 11iI MENTAL, <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors, probes, line leak detectors,etc.)must be perforific6d Wff9-ft4k4W <br /> specified by the equipment manufacturers' instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> 23 CCR 2632,2634,2638,2641 <br /> MONITORING EQUIPMENT IS SERVICED ® 1.ANNUALLY ❑ 99.OTHER(Specify): 49.3. <br /> 490-3b <br /> III. MONITORING LOCATIONS <br /> 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. 2,SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)4W' <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br /> 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 490-5 <br /> YAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§202,2634) <br /> SECONDARY CONTAINMENT IS: ❑ a.DRY ® b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM 496 <br /> PANEL MANUFACTURER: VEEDER ROOT _ 490'' MODEL#: TLS-350 490.8 <br /> LEAK SENSOR MANUFACTURER: VEEDER ROOT 41 MODEL#(S): 794380-301 490-10 <br /> 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S),(23 CCR§2643) 490-13 <br /> PANEL MANUFACTURER: 49.12. MODEL#: 490-13 <br /> IN-TANK PROBE MANUFACTURER: 49x14- MODEL#(S): 490-15 <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAB Y/NIGHTLY ❑ c.WEEKLY 49.16 <br /> ❑ it.MONTHLY ❑ e.OTHER(Specify): 49.17 <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h. ❑ c.OTHER(Specify): 490-1e <br /> 490-t9 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 490.20 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 490-21 <br /> 490-22 <br /> 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 490-23 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): 490-3° <br /> x9.25 <br /> ❑99.OTHER (Specify): 49.26 <br /> 49.27 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 49.28 <br /> VISUAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS:On.DRY ❑b.LIQUID FILLED ❑c.PRESSURIZED ❑d.UNDER VACUUM 490-29 <br /> PANEL MANUFACTURER:VEEDER ROOT 490-30 MODEL* TLS-350 49.31 <br /> LEAK SENSOR MANUFACTURER: VEEDER ROOT 490-32 MODEL#(S): 794380-352; 490-33 <br /> 793380-208 91 FILL) <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ®a.YES ❑b.NO 490-34 <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ®a.YES ❑b.NO 49.35 <br /> El 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED CM CCR 12636) 49.36 <br /> MLLD MANUFACTURER(S): 490,37 MODEL#(S): 490.38 <br /> ® 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR§2636) 490-39 <br /> ELLD MANUFACTURERS)VEEDER ROOT 490.40. MODEL#(S): PLLD 49 11 <br /> PROGRAMMED IN LINE LEAK TEST: ❑ 1.MINIMUM MONTHLY 0.2 g.p.h. ❑ 2.MINIMUM ANNUAL 0.1 g.p.h. 49042 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑b.NO 49043 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. 0 &YES ❑b.NO 49.44 <br /> 4.PIPE INTEGRITY TESTING 49045 <br /> TEST FRE UENCY ❑ &ANNUALLY ❑ b.EVERY3 YEARS ❑ c.OTHER(Specify) 49°-4649°47 <br /> 5.VISUAL PIPE MONITORING. 49048 <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY. ❑c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED- - 49049 <br /> •"0-9 formonbo,in ofimb,vied em ,um fuel pipi.R.Wy pn HSC 25281.5 b 3 <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA[23 CCR§2636(a)(3)1. 49.50 <br /> 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 49.51 <br /> ❑ 99.OTHER(Specify) 490-52 <br /> 490-53 <br /> Belshire Environmental Services,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.