Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK APR 2 , 2012 <br /> MONITORING PLAN (Page 2 of 2) <br /> VI.UNDER DISPENSER CONTAINMENT(UDC)MONITO <br /> I. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD f NCYSER�lp�90. <br /> ® 1.CONTINUOUS ELECTRONIC MONITORING [12.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE <br /> ❑4.NO DISPENSERS ❑99.OTHER(Specify): <br /> PANEL MANUFACTURER:VEEDER ROOT 690.39 MODEL#:TLS-350 490-56. <br /> LEAK SENSOR MANUFACTURER:VEEDER ROOT 4905' MODEL#(S):794380.208 490.58 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ® a.YES ❑b.NO 40-59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN ® a.YES ❑b.NO 490-60. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑b.NO 49P61 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. ® a YES ❑b.NO 49062 <br /> 2.UDC CONSTRUCTION IS ®l.SINGLE-WALLED ❑2.DOUBLE-WALLED 490-63 <br /> IF DOUBLE WALLED: 4o44e <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: ❑ 1.LIQUID ❑2.PRESSURE ❑3.VACUUM __ <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑a.YES ❑b.NO 4W-64b- <br /> VII.PERIODIC SYSTEM TESTING <br /> ❑ 1. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 49065_ <br /> LEAK DETECTION(ELD)MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED.(23 CCR§2644.1) <br /> ®2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 49066 <br /> ®3.SPELL BUCKETS ARE TESTED ANNUALLY.----------- --- ------ 490-67 <br /> VIII.RECORDKEEPING <br /> The following monitoring/maintenance records are kept for this facility: <br /> ®Alarm logs 4W68a ❑Visual Inspection Records 490.686 ❑Tank integrity testing results 406k <br /> ❑SIR testing results(and supporting documentation records). 4WW ❑ Tank gauging results(and supporting documentation records). 49o-a8 <br /> ❑ATG Testing results(and supporting documentation records).49068f ❑ Corrosion Protection 60-day logs 4o-68g <br /> N Equipment maintenance and calibration records. 49068h <br /> LX.TRAINING <br /> N Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to theirjob duties. 49a69e <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY=(Check all that apply) <br /> ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)490696 <br /> ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)40-6% <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 40-6w <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 49P69e <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"49o-69r <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"490-698 <br /> ❑ OII ER(Specify):M694 m69i <br /> This facility has a"Designated UST Operator"who has passed the California USE System Operator Exam administered by the International Code Council(ICC). The <br /> "Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This training <br /> will include,but is not limited to,the following: <br /> ➢ Operation of the USE systems in a manner consistent with the facility's best management practices <br /> ➢ The facility employee's role with regard in the monitoring equipment as specified in this UST Monitoring Plan <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> ➢ Names of contact person(s)for emergencies and monitoring alarms.49a7o <br /> X. COMMENTSIADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan.49071 <br /> THE OVERFILL PREVENTION METHOD IS EXTERNAL AUDIOVISUAL ALARM SET AT 90% OF TANK CAPACITY. <br /> XI.PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that: l)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The following persons)are responsible for performing the monitoring and equipment maintenance: <br /> NAME DENNIS BOCK 490-72 TITLE COMPLIANCE MANAGER 49x73 <br /> NAME TIM HURLOCKER TITLE DIRECTOR OF GASOLINE OPERATIONS <br /> The Designated Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and inform the owner/operator of any conditions <br /> that need follow-up action. <br /> XII.OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGNATURE . 49076 DATE: �f 490-77 <br /> ❑ or 02.Fac'lir H -ed Re resentaiv of Ow <br /> APPLICANT NAME(print): 19678 APPLICANT TITLE: 490-79 <br /> DENNIS BOCK COMPLIANCE MANAGER <br /> Belshire Environmental Services,Inc. <br />