Laserfiche WebLink
SITE SAFETY" & UNDERGROUND FUEL TANK CLOSURE PLAN <br /> PAGE 3 <br /> E) The local agencies have been notified of the removal date and will be present <br /> when the tank(s) are removed to make a visual inspection and determine what <br /> soil samples will be taken. <br /> F) Placer Tractor Service will arrange to have Alpha Analytical Laboratory take <br /> the required soil samples unless arrangements have been previously made by <br /> the owners. Alpha Analytical is State Certified (#124) for Hazardous Waste <br /> samples and results are usually received within five to seven working days, <br /> unless contract requires 24 - 48 hour results. <br /> G! Onsite Personnel: <br /> 1 ) The following personnel are designated to carry out job functions as needed <br /> onsite. They all have been certified in Hazardous Waste and Safety Training <br /> and CPR. <br /> Rodger Thomas Cathy Thomas Albert Oesterling <br /> Ken Noel Mac McConnell Bill Teal <br /> Lori Thomas Danny Inman Roger Brett <br /> Ken Bolton Lynn Selzer <br /> H) Local Agencies: <br /> 4 +s��H� <br /> SAN JOAQUIN Lam`' ' ' r ' . T,. T i`TRICT AND CITY FIRE PREVENTION <br /> ATTN; UNDERGROUND TANK PROGRAM (209) 944-8271 <br /> P.O. BOX 2009 <br /> STOCKTON, CA, 95202 <br /> SECTION II; RISK ANALYSIS & SAFETY AND HEALTH PLAN <br /> 1. Tasks Planned: <br /> A. Underground Tank Removal - Excavation <br /> B. Rinsing fuel tanks and inerting with dry ice <br /> C. Soil Sampling <br /> D. Fill in excavation and resurface <br /> CONTINUED ON PAGE 4 <br />