Laserfiche WebLink
1. H. KLEINFELDER & ASSc,c:IATES <br /> File: PW86-1017 <br /> May 15, 1986 <br /> Page 3 <br /> We recommend submittal of our proposal or presentation of <br /> our scope of work to the local/State agencies for their review <br /> and approval . We feel our proposal is technically sound and <br /> appropriate for receiving final clearance from the agencies. <br /> COST ESTIMATE <br /> We propose that our costs be compensated on a time and <br /> materials basis according to our enclosed fee schedule. Below we <br /> have provided a cost estimate based on the scone of work <br /> outlined. We would not exceed this cost estimate without orooer <br /> cause and Drior written notification. <br /> TASK <br /> 1 Project Development and Administration $ 500 .00 <br /> 2 Field Investigation 3 , 500. 00 <br /> 3 Laboratory Analysis 1 , 200 .00 <br /> 4 Summary Report 1 , 800 . 00 <br /> Total Projected Cost $ 7 , 000 . 00 <br /> To perform this investigation we will require the following: <br /> o Location of all underground utilities and other <br /> subsurface structures which could interfere with drilling <br /> operations or be damaged during drilling. Failure to <br /> locate such lines or structures and responsibility for <br /> any necessary corrective action or resulting damage will <br /> be the responsibility of Union Carbide Company. <br /> underaround Service Alert (USA) provides this service <br /> free of charge for major utility lines . JHK&A will make <br /> contact with USA for a site visit . However , Union <br /> Carbide Company staff at the site must assist USA in <br /> ^.e=r site inspection and supply their report to iHK&A <br /> before site mobilization. <br />