Laserfiche WebLink
TASK POTENTIAL HAZARD PRECAUTIONARY MEASURES <br /> 3 .Excavation- <br /> continued <br /> d. Exposure to Provide proper protective <br /> toxic substances clothing and equipment to all <br /> employees and require use at all <br /> times <br /> • Provide monitoring of personnel <br /> and area to measure toxic <br /> substances in ambient environment <br /> e. Cave-in or • Prevent all entry into pits <br /> engulfment <br /> • Provide temporary shoring where <br /> required for safety <br /> Shelf or slope pit areas to <br /> minimize Potential for cave-ins . <br /> 4 .Open Tank a.Slips, trips & • Prevent soil from becoming too <br /> #2 falls wet if possible <br /> • Wear non-skid boots <br /> • KeeP site free of excess debris <br /> b. Injury from • Train all employees in site <br /> equipment & tools safety <br /> *Electrical injury • Train employees in the use of <br /> •Mechanical injury all tools and equipment <br /> • Maintain equipment and tools in <br /> proper condition according to <br /> manufacturers specifications <br /> All electrical equipment shall <br /> be GFCI ecruioped. <br /> c.Injury from heavy • Train heavy equipment operators <br /> equipment in site safety & health procedures <br /> • Maintain communications between <br /> workers and e i 111211 o erator <br /> d. Cave-in or • Prevent all entry into pits <br /> engulfment <br /> • Provide temporary shoring where <br /> required for safety <br /> • Shelf or slope pit areas to <br /> minimize Potential for cave-ins. <br /> e. Explosion • Inert tank to appropriate levels <br /> • Maintain safe distance, fire <br /> watch and fire extin ishers <br /> 27 <br /> Site Safety 6 Health Plan Rev./1.0 <br /> October 20, 1997 <br />