Laserfiche WebLink
TASK POTENTIAL HAZARD PRECAIITIONAnY MEASIIRES <br /> 5. Backfill a.Slips, trips & • Prevent soil from becoming too <br /> falls wet if possible <br /> • Wear non-skid boots <br /> • Kee site free of excess debris <br /> b.Injury from Train all employees in site <br /> equipment & tools safety <br /> *Electrical injury Train employees in the use of <br /> *Mechanical injury all tools and equipment <br /> Maintain equipment and tools in <br /> proper condition according to <br /> manufacturers specifications <br /> • All electrical equipment shall <br /> be GFCI <br /> c.Injury from heavy • Train heavy equipment operators <br /> equipment in site safety & health procedures <br /> • Maintain a spotter during heavy <br /> euipment operations to maintain <br /> visual & radio communications <br /> between workers and equipment <br /> operator <br /> d• Cave-in or • Prevent all entry into pits <br /> engulfment <br /> • Provide temporary shoring where <br /> required for safety <br /> • Shelf or slope pit areas to <br /> minimize Potential for cave-ins. <br /> Site Safety 6 Health Plan Rev./1. 0 28 <br /> October 20, 1997 <br />