My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2000
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRENCH CAMP
>
4201
>
2300 - Underground Storage Tank Program
>
PR0516300
>
REMOVAL_2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2021 2:39:35 PM
Creation date
11/5/2018 10:12:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2000
RECORD_ID
PR0516300
PE
2381
FACILITY_ID
FA0001198
FACILITY_NAME
TURNER STATION
STREET_NUMBER
4201
Direction
E
STREET_NAME
FRENCH CAMP
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20103019
CURRENT_STATUS
02
SITE_LOCATION
4201 E FRENCH CAMP RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\F\FRENCH CAMP\4201\PR0516300\REMOVAL 2000.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SITE SAFETY 6 HEALTH PLAN REQUIREMENTS FOR PERSONAL PROTECTIVE <br /> ' EQUIPMENT (SSHP PPE Requirements) : <br /> GENERAL: <br /> 1 . The following requirements apply to all operations and <br /> personnel who might be exposed during any hazardous <br /> tasks: <br /> 2 . The contractor shall provide respirators and other PPE <br /> necessary to protect the health of all employees . <br /> 3. The contractor shall provide PPE for three government <br /> personnel on a daily basis. <br /> 4 . The SHM shall determine the degree of exposure through <br /> industrial hygiene environmental surveillance and select <br /> PPE based on the results of the monitoring, site <br /> observations and professional judgment. <br /> 5. The contractor shall establish and maintain a <br /> respiratory protection program per 29 CFR 1910.134. <br /> 6. The contractor shall use only NIOSH/MSHA approved <br /> respirators. <br /> 7. Each person wearing respiratory protection shall have a <br /> physician's certification of fitness prior to being <br /> issued a respirator. <br /> 8. All persons wearing respirators shall have been fit <br /> tested prior to commencing hazardous operations. <br /> 9. Each person wearing a respirator shall have been briefed <br /> in proper procedures of donning and removing, <br /> decontamination, maintenance and storage of the <br /> respirator or other personal protective devices. <br /> 10. All persons wearing a respirator shall have annual <br /> training in the proper use and care of the respirator. <br /> 11 . Each employee shall have their own individual <br /> respirator. No person shall wear the respirator of <br /> another employee. <br /> Only respirators approved by NIOSH shall be used. Onsite personnel shall <br /> be provided with appropriate personal protective equipment. Protective <br /> equipment and clothing shall be kept clean and well maintained. The PPE <br /> section of the SSHP shall include site-specific procedures to determine <br /> PPE program effectiveness and for onsite fit-testing of respirators, <br /> cleaning, maintenance, inspection, and storage of PPE. The SHM shall <br /> assess each work zone area to determine if hazards are present which <br /> necessitate the use of PPE. <br /> 48 <br /> Site Safety 6 Health Plan Rev./1.0 <br /> October 20, 1997 <br />
The URL can be used to link to this page
Your browser does not support the video tag.