Laserfiche WebLink
SWRCB,January 2002 M%e3�C1J�� <br /> 4. TANK ANNULAR TESTING r <br /> Test Method Developed By: Tank Manufacturer X Industry Standard ❑Professiorial Engirieer <br /> Other(Specify) <br /> Test Method Used: Pressure X Vacuum ❑Hydrostatic <br /> u Other(Spec) <br /> Test Equipment Used: Gast Vacuum Pump/Vacuum Gauges in Hg. Equipment Resolution: - %,"x-30"Hg. <br /> Tank#1 Tank#2&3 Tank# Tank# <br /> Is Tank Exempt From Testing?' No No <br /> Tank Capacity: 12K IOK Split 6/4 <br /> Tank Material: Jacketed Double Jacketed Double <br /> Wall Steel Wall Steel <br /> Tank Manufacturer: Joor Joor <br /> Product Stored: Diesel Regular 87/Super 91 <br /> Wait time between applying 10 Minutes 10 Minutes <br /> vacuum and starting test: <br /> Test Start Time: 9:35 9:45 <br /> Initial Reading(Ri): -6 Hg. -6 Hg. <br /> Test End Time: 10:35 10:45 <br /> Final Reading(RF): -6 Hg. -6 Hg. <br /> Test Duration: 1 Hour 1 Hour <br /> Change in Reading(RF-Rj): 0 Hg. 0 Hg. <br /> Pass/Fail Threshold or Criteria: No Loss in Hg. No Loss in Hg. <br /> Test Result: Pass Pass <br /> Was sensor removed for testing? Yes Yes <br /> Was sensor properly replaced and Yes Yes <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up forfailed tests) <br /> ' Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary <br /> containment,such as systems that are hydrostatically monitored or under constant vacuum,are exempt from periodic containment <br /> testing. {California Code of Regulations,Title 23,Section 2637(a)(6)) <br />