Laserfiche WebLink
AUG 3 0 2016 <br /> SWRCB,January 2002 / 7 p+ '-;Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer ❑Industry Standard ❑Professional Engineer <br /> ❑Other(Sped) <br /> Test Method Used: X Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Pressure Gauges in Psi/Nitrogen Equipment Resolution: 1/10-15 Psi <br /> Piping Run#1 Piping Run#2 Piping Run#3 Piping Run# <br /> Piping Material: Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith <br /> Piping Diameter: 3" 3" 3' <br /> Length of Piping Run: Approx. 85' Approx. 15' Approx.30' <br /> Product Stored: Diesel I Regular 87 Super 91 <br /> Method and location of Test boot at STP Test boot at STP Test boot at STP <br /> piping-run isolation: Pi in Sum #1 Piping Sump#2 Pi in Sum #3 <br /> Wait time between applying 10 Minutes 10 Minutes 10 Minutes <br /> pressure and starting test: <br /> Test Start Time: 9:25 9:30 9:40 <br /> Initial Reading(Rj): 5 Psi 5 Psi 5 Psi <br /> Test End Time: 10:25 10:30 10:40 <br /> Final Reading(RF): 5 Psi 5 Psi 5 Psi <br /> Test Duration: 1 Hour 1 Hour 1 Hour <br /> Change in Reading(RF-Rr): 0 Psi 0 Psi 0 Psi <br /> Pass/Fail Threshold or No Loss in Psi No Loss in Psi No Loss in Psi <br /> Criteria: <br /> Test Result: Pass Pass Pass <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up forfailed tests) <br />