COMPLIANCE NOTES EQUIPMENT LIST N W
<br /> aQ ! W W
<br /> 1. ARCHITECTURAL AND CIVIL DRAWINGS SHALL TAKE PRECEDENCE ON ALL
<br /> DIMENSIONS, PROPERTY LINES, ELEVATIONS AND EQUIPMENT LOCATIONS.
<br /> I
<br /> 2. ALL DIMENSIONS AND CONDITIONS SHALL BE CHECKED AND VERIFIED IN
<br /> THE FIELD BEFORE STARTING ANY WORK,ANY DISCREPANCY SHALL BE
<br /> CALLED TO THE ATTENTION OF THE OWNER'S ENGINEER FOR HIS DECISION SR. RELOCATED DISPENSER ACCESSORIES:
<br /> PRIOR TO PROCEEDING WITH THE WORK. NO-
<br /> 3. GENERAL CONTRACTOR SHALL OBTAIN NECESSARY PERMIT FROM THE 1 8 PDM 6X84PDM 6"X 84"Square Guard Post.
<br /> DIVISION OF INDUSTRIAL SAFETY(STATE OF CALIFORNIA)FOR
<br /> EXCAVATIONS OF TRENCHES 5'-0"OR MORE IN DEPTH INTO WHICH A 2 1 Bravo 89000-F2L-8 Single Wall Fiberglass Dispenser Sump
<br /> N PERSON IS REQUIRED TO DESCEND.
<br /> - - 4. GENERAL CONTRACTOR SHALL PROVIDE 72 HOUR NOTIFICATION TO 3 1 Bravo B9000-F3L-6 Single Wall Fiberglass Dispenser Sump
<br /> GOVERNING AGENCY PRIOR TO TANK INSTALLATION.
<br /> a
<br /> -__....._.. --____ - _._ 5. PROVISION OF NEW TANK IS NOT ANTICIPATED IN THE DESIGN.HOWEVER 4 2 BRAVO EO FRM Electrical Offset y
<br /> ___._____......_.. ` IF A NEW TANK IS TO BE INCLUDED IN THIS SYSTEM,IT WILL BE INSPECTED
<br /> BY OWNER'S ENGINEER AND GOVERNING AGENCY AT FOUR(4)SEPARATE 5 2 BRAVO SRKT-1132 Vapor Shear Valve Bracket
<br /> _ CONSTRUCTION PHASES AS REQUIRED,
<br /> N89 4$ �7 E 20.43 ' ~� 5.1. TANK AND PRIMARY PIPING HYDROSTATICALLY OR PNEUMATICALLY g 5 OPW 10BWMP-5$30 Double
<br /> o " _. _ Poppet Shear Valve-Male i W
<br /> � i — � � � � r.. � � TESTED FOR 30 MINUTES.MAXIMUM PNEUMATIC TEST PRESSURE
<br /> ------ r FOR PRIMARY PIPING IS 50 PSI.
<br /> /J 5.2. INSPECTION OF ALL SECONDARY CONTAINMENT,INCLUDING TESTING, 7 2 OPW 60VSP-1001 1"x 11/2"Poppeted Vapor Shear Valve °
<br /> ---- ---- - � ` IN ACCORDANCE WITH MANUFACTURER'S GUIDELINES.
<br /> ` 5.3. FINAL.INSPECTION INCLUDING ALL PORTIONS OF THE LEAK 8 7 UNISOURCE FG1 SO-QFQG90-12 1 112"F x 2"Q-Fit Glue Flex Connector with
<br /> DETECTION SYSTEM. 90 Degree Elbow
<br /> 6. ALL TANK SUMPS AND UNDER DISPENSER CONTAINMENT SUMPS SHALL BE
<br /> &3,-) 4"S o J ` HYDROSTATICALLY TESTED(LAKE TEST)WITH STANDING WATER FOR A 9 7 Smith FRP 1203-626-0 3"A82481 Sump PenetrationlTermination Fitting.
<br /> a C' R M JD 4 1 PERIOD OF 24 HOURS TO INSURE THAT THE SUMPS ARE WARERTIGHT.
<br /> 9.32 I1 \ 7. TANK SYSTEM, LEAK DETECTORS AND MONITORING SYSTEM INTEGRITY
<br /> l
<br /> TESTS SHALL BE FORWARDED TO AND APPROVED BY GOVERNING AGENCY 10 7 Smith FRP 1204-238-3 4"x3"Concentric Reducer
<br /> REMOVE PRODUCT \ PRIOR TO TANK SYSTEM BEING PLACED IN OPERATION,THE CONTRACTOR
<br /> PIPING 1 SHALL BE RESPONSIBLE FOR CONTATING THE RESPECTIVE 11 2 VEEDER-ROOT 794380-208 Sump Sensors
<br /> -- --- - - 1 1 ENVIRONMENTAL HEALTH AGENCY AND AIR POLLUTION CONTROL
<br /> ° I DISTRICTS IN ADVANCE OF SYSTEM TESTS.PASSING TEST RESULTS ARE VAPOR SYSTEM-HOSES&NOZZLES
<br /> 11 REQUIRED TO BE SUBMITTED TO THE AGENCIES WITHIN 30 DAYS OF co
<br /> _ START-UP.SECONDARY CONTAINMENT TESTS ARE REQUIRED 6 MONTHS 12 4 Healy VP1000A"Universal"Vapor Kit
<br /> I �i LATER AND EVERY THREE(3)YEARS THEREAFTER,PURSUANT TO HEALTH Includes Q w
<br /> Illi - P VP1000-5 vacuum pump, 1360A interface module and 1404 universal U v
<br /> Ii AND SAFETY CODE SECTION 25281.1 (a)(4)(B).
<br /> 8.
<br /> I AN UNAUTHORIZED RELEASE RESPONSE PLAN MUST BE SUBMITTED TO, hardwarelmounting kit.
<br /> AND APPROVED BY,GOVERNING AGENCY PRIOR TO TANK OPERATIONS.
<br /> -- 9. EVIDENCE OF FINALCIAL RESPONSIBILITY SHALL BE SUBMITTED TO 13 4 HEALY 2071 V Single Vapor Piping Installation Kit
<br /> oGOVERNING AGENCY.00 0 �d a
<br /> w w Al 41 q, � � IJ 10. ALL MATERIALS SHALL BE COMPATIBLE WITH USE FOR THE INTENDED 14 4 HEALY Z070E Electrical Installation Kit
<br /> ZZZZ
<br /> �+ y w y y J l PURPOSE AS PER NATIONALLY RECOGNIZED CODES,LOCAL CODES AND
<br /> - EXISTING l GOVERNING AUTHORITIES. o
<br /> - W 15 8 HEALY 76B-010-S4F212"Whip Hose wlBalance Threads One End oLU
<br /> FUEL CANOPY L PETROL=U PIP E I 11. THE UNDERGROUND STORAGE TANKS SYSTEM SHALL BE COMPATIBLE
<br /> WITH THE PRODUCT STORED. 16 8 HEALY 75B-090-S2S2 9' Hose 2 �; �' M.
<br /> I�� c NO. 1D ERIU':N Y T �N 12. ALL EXPOSED METAL ANCHORING STRAPS/CABLES,PIPE AND/,OR TANK 0 z 1 CO
<br /> 0 00 Og R J N E! y y I FITTINGS AND APPUTERANCES SHALL BE TREATED WITH AN APPROPRIATE 17 8 HEALY 8701-VV Break-a-way ° ° W
<br /> REMOVE TEES REPLACE EXISTING PIPING ASPHALT COATING OR OTHER PROTECTIVE COATING PURSUANT TO 18 8 HEALY 900 O.R.V.R. EVR Nozzle
<br /> HEALTH AND SAFETY CODE,25281.5;CALIFORNIA CODE REGULATIONS,
<br /> C, WITH ELBOWS TO REMAIN 19 1 HEALY 9961 Bladder Tank-Clean Air Separator
<br /> W TITLE 23,2636,SUBd(b).
<br /> i U EL ISLANDS DC 13. CONTRACTOR MUST BE CERTIFIED BY MANUFACTURER TO INSTALL VEEDER ROOT IN-STATION DIAGNOSTICS ISD q__
<br /> EQUIPMENTS. 20 4 VEEDER-ROOT 330020.445 Vapor Flow Sensor
<br /> TANK/PIPING GENERAL NOTES
<br /> 21 1 VEEDER-ROOT 330160-004 SEM Software Enhancement Module y
<br /> w v 1 DISPENSER START UP BY MANUFACTURER'S REPRESENTATIVE, 22 1 VEEDER-ROOT 330020-615 ISD Manuals&Vapor Pressure Sensor-1 per site 11
<br /> w CONTRACTOR TO PURGE LINES WITH 200 GALLONS PER HOSE MINIMUM, 23 1 VEEDER-ROOT 330280-401 G-Site Dispenser Interface Module(DIM) a
<br /> y ANY AIR POCKETS OR START UP PROBLEMS DUE TO IMPROPER
<br /> 7 w INSTALLATION OR INCORRECT WIRING THAT DESTROYS ELECTRONICS 24 1 VEEDER-ROOT 331063-100 G-Site cable to TLS35OR&Installation Manual
<br /> WILL BE BILLED BACK TO THE CONTRACTOR,
<br /> 1G KS TO BE INSTALLED PER MANUFACTURER'S 25 8 HEALY 756-090S2S2 9' Hose
<br /> 2 ALL NEW PIPING AND TANKS
<br /> wRECOMMENDATIONS AND INSTALLATION INSTRUCTIONS.CONTRACTOR 26 8 HEALY 8701-VV/Break-a-way w
<br /> 4 SHALL USE FLEXIBLE CONNECTORS FROM THE TANK SUMP TO THE E•1
<br /> BEFORE A CHANGE IN DE AT 28 1 e
<br /> L I R
<br /> VAPOR RECOVERY MANIFOLD, MAIN PRODUCT LINES SHALL PROVIDE 27 8 HEALY 900 RVR EV Nozzle
<br /> �
<br /> LEAST 4 FEET OF STRAIGHT FRP PIPE RUN HEALY 9961 Bladder Tank-Clean Air Separator
<br /> DIRECTION OF MORE THAN 30 DEGREES. VEEDER ROOT IN-STATION DIAGNOSTICS ISD V�
<br /> 0 W 3 PRODUCT,VAPOR AND VENT PIPING IS TO SLOPE TOWARD TANK 118"
<br /> C12 PER FOOT MINIMUM. 29 4 VEEDER-ROOT 330020-445 Vapor Flow Sensor I�
<br /> C) 1 4 SECONDARY CONTAINMENT PIPING IS SHOWN BY NOTE ONLY,NOT W
<br /> Z CAR WASHP R ` y I GRAPHICALLY.ALL PRODUCT,VAPOR RECOVERY AND VENT PIPING 30 1 VEEDER-ROOT 330160-004 SEM Software Enhancement Module
<br /> SHALL BE DOUBLE CONTAINMENT PIPE.
<br /> O _. w
<br /> R 5 SEE SHEET PET2 FOR GENERAL TANK NOTES AND SPECIFICATIONS. 31 1 VEEDER-ROOT 330020-515 15D Manuals&Vapor I?ressure Sensor-1
<br /> per site o �iTy
<br /> \ { `- — 132 1 VEEDER-ROOT 330280-401 G-Site Dispenser Interface Module(DIM)
<br /> CD
<br /> EXISTING N j
<br /> U _ 33 1 VEEDER-ROOT 331063.100 G-Site cable to TLS35OR&Installation Manual
<br /> Q
<br /> CONVENIENCE
<br /> I �
<br /> r- 1 VEEDER-ROOT 330586.001 Dual RS-232 interface Module Ir
<br /> �
<br /> W N l p CONTACT INFORMATION
<br /> 34
<br /> �'I \ STORE 8 O I+ W 35 1 VEEDER-ROOT 329356-004 8 Input Smart Sensor Module. O LL
<br /> cl�;ASS II F1\I CJ I OWNERIOPERATORS 36 1 VEEDER-ROOT 331500 358 ECPU2 W Q
<br /> EV 1ST.EVERGREEN CORP/ MISCELLANOUS U
<br /> y SERVICE STATION
<br /> EJECT — _ jam.. l 1612 W.HAMMER LN., 37 3 RED JACKET 880.047-1 Isotrol Isolation Control Box With Relay j 0 !
<br /> O f 1 n ICALIFORNIA
<br /> \ A^Tf �V UL I,L a c r^ CD STOCKTON,
<br /> 3B 2 PDM 6X64PDM 6"X 84"Square Guard Post f
<br /> " p CIVIL ENGINEER I "quantity Subject to Healy Tank Location" � Z Y
<br /> I w (V MA DESIGN-BUILD,INC. O O
<br /> M
<br /> E L_C] 2696_ _ ► 2696 SCREECH OWL WAY
<br /> - - - - -- P N E_I_ SACRAMENTO,CA 95834 0 ~ {�
<br /> j
<br /> — - -
<br /> V NTS PHONE:(916)690-0509 z F¢..
<br /> SURVEYOR -. ---J (n Z
<br /> ` g DUSTY WILTON W
<br /> !i / T I
<br /> LODID.B.WILTON LAND SURVEYING Q
<br /> l
<br /> ::::::::::: :: - P.O.BOX 435 O
<br /> J Q W !
<br /> 1513 W A�41AIN0 AVE x
<br /> 2 I , CA 95241-0435 E
<br /> . "
<br /> �- j ( ) 1) w Rtr� r k, �. 1� W
<br /> PH: 209 747-0169 .e FX: (209)334-3736 *� " Q
<br /> 4
<br /> ARCHITECT,ELECTRICAL/
<br /> p,MECHANICALlPLUMBING ENGINEERS Sha° l
<br /> ILU N
<br /> IRQLMAR i 2009 0DAVID,MFOR �
<br /> 690174
<br /> SOC 0 ON,CA 95269
<br /> i ! SAN
<br /> 4F'ON ENCOUNTY
<br /> PH:(209)470-031 BEN �
<br /> I: HEALTH DE RTMENT I
<br /> r
<br /> I� L J
<br /> N.E.C. HAZARDOUS AREA NOTES Co o 00
<br /> ,II
<br /> 0 CO
<br /> N.E.C.ARTICLE 514 CLASS 1, LOCATION (TYPICAL) Q 05 ~
<br /> 5 j l 0 10 20 o - N
<br /> 5 = 0(000
<br /> w l I FOR UNDERGROUND TANK -VENT DISCHARGE UPWARD: W Z 0) (.0
<br /> EXTENT OF CLASS 1, GROUP"D'; &DIVISION 1 LOCATION: N W W c4
<br /> A _ SCALE IN FEET . .
<br /> WITHIN 3-FOOT OF OPEN END OF VENT, EXTENDING IN ALL DIRECTIONS.
<br /> EXTENT OF CLASS 1, GROUP"D", &DIVISION 2 LOCATION: (0 Z
<br /> SPACE BETWEEN 3-FOOT AND 5-FOOT OF OPEN END OF VENT, EXTENDING IN ALL DIRECTIONS. U¢ O
<br /> � � � � cV cA-cl, IL
<br /> TRASH
<br /> SCOPE OF WORK KEY DESIGNATIONS LEGEND
<br /> 12K GAL, WALL UST(REGULAR)TO REMAIN. o p
<br /> N89052'05"E 150.37' 1. RELOCATE EXISTING TWO DISPENSERS(N.MOST) Q 8K GAL, WALL UST(REGULAR)TO REMAIN . DIESEL GAS PIPING
<br /> ASSOCIATED PRODUCT PIPING. d n
<br /> P P
<br /> G 2.INSTALL CANOPY(#2)MEASURING 24'x32'ON EAST Q3 4K GAL, WALL UST(DIESEL)TO REMAIN. PREMIUM GAS PIPING m
<br /> v OF CONVENIENCE STORE. ® INSTALL 2"FIBER GLASS REINF.WALL PIPING.SEE DETAIL 1 ON SHEET 3. z
<br /> A I 3.INSTALL TWO DISPENSERS(3+0&3+1) "Q NOT USED REGULAR GAS PIPING R 0. . O 0
<br /> ON EAST OF CONVENIENCE STORE. {/y n
<br /> 4.INSTALL PRODUCT PIPING FOR NEW DISPENSERS,
<br /> ® INSTALL CLEAN AIR SEPERATOR SEE PET-4 FOR DETAILS. VAPOR RECOVERY PIPING-VR VP VR
<br /> 5.INSTALL EVR SYSTEM(HEALY). C�7 INSTALL(E)EMERGENCY SHUTT OFF AND SIGNAGE LOCATION (EXTERIOR WALL OF Z
<br /> FUEL SYSTEM PIPING PLAN BUILDING. FACING TO PUMP SWITCH LOCATED 60"ABOVE GROUND), VENT PIPING v v v
<br /> SCALE = 1"=10'-0'- eQ INSTALL OVER FELL ALARM LOCATION SEE DETAIL 5 ON SHEET 3.
<br /> lip ® INSTALL 4"DIA STEEL BOLLARD SEE DETAIL 4 ON SHEET 3.
<br /> Q INSTALL 4'x6'CONCRETE SLAB FOR VENT BOX/CLEAN AIR SEPERATION.
<br /> Q INSTALL 2A40 BC FIRE EXTINGUISHER LOCATION(TOP OF EXTINGUISHER IS 48"ABOVE GROUND). Q
<br /> ® INSTALL NO"SMOKING"&"TURN OF MOTOR"SIGNAGES ON CANOPY COLUMNS. 0000
<br /> Q3 RELOCATE EXISTING TWO DISPENCERS FROM NORTH TO NEW LOCATION AT EAST
<br /> OF CONVENIENCE STORE. o
<br /> ® EXISTING CANOPY TO BE REMOVED.
<br /> ® EXISTING 2"&3"FRP RETURN LINES TO BE REMOVED. Q
<br />
|