Laserfiche WebLink
COMPLIANCE NOTES EQUIPMENT LIST N W <br /> aQ ! W W <br /> 1. ARCHITECTURAL AND CIVIL DRAWINGS SHALL TAKE PRECEDENCE ON ALL <br /> DIMENSIONS, PROPERTY LINES, ELEVATIONS AND EQUIPMENT LOCATIONS. <br /> I <br /> 2. ALL DIMENSIONS AND CONDITIONS SHALL BE CHECKED AND VERIFIED IN <br /> THE FIELD BEFORE STARTING ANY WORK,ANY DISCREPANCY SHALL BE <br /> CALLED TO THE ATTENTION OF THE OWNER'S ENGINEER FOR HIS DECISION SR. RELOCATED DISPENSER ACCESSORIES: <br /> PRIOR TO PROCEEDING WITH THE WORK. NO- <br /> 3. GENERAL CONTRACTOR SHALL OBTAIN NECESSARY PERMIT FROM THE 1 8 PDM 6X84PDM 6"X 84"Square Guard Post. <br /> DIVISION OF INDUSTRIAL SAFETY(STATE OF CALIFORNIA)FOR <br /> EXCAVATIONS OF TRENCHES 5'-0"OR MORE IN DEPTH INTO WHICH A 2 1 Bravo 89000-F2L-8 Single Wall Fiberglass Dispenser Sump <br /> N PERSON IS REQUIRED TO DESCEND. <br /> - - 4. GENERAL CONTRACTOR SHALL PROVIDE 72 HOUR NOTIFICATION TO 3 1 Bravo B9000-F3L-6 Single Wall Fiberglass Dispenser Sump <br /> GOVERNING AGENCY PRIOR TO TANK INSTALLATION. <br /> a <br /> -__....._.. --____ - _._ 5. PROVISION OF NEW TANK IS NOT ANTICIPATED IN THE DESIGN.HOWEVER 4 2 BRAVO EO FRM Electrical Offset y <br /> ___._____......_.. ` IF A NEW TANK IS TO BE INCLUDED IN THIS SYSTEM,IT WILL BE INSPECTED <br /> BY OWNER'S ENGINEER AND GOVERNING AGENCY AT FOUR(4)SEPARATE 5 2 BRAVO SRKT-1132 Vapor Shear Valve Bracket <br /> _ CONSTRUCTION PHASES AS REQUIRED, <br /> N89 4$ �7 E 20.43 ' ~� 5.1. TANK AND PRIMARY PIPING HYDROSTATICALLY OR PNEUMATICALLY g 5 OPW 10BWMP-5$30 Double <br /> o " _. _ Poppet Shear Valve-Male i W <br /> � i — � � � � r.. � � TESTED FOR 30 MINUTES.MAXIMUM PNEUMATIC TEST PRESSURE <br /> ------ r FOR PRIMARY PIPING IS 50 PSI. <br /> /J 5.2. INSPECTION OF ALL SECONDARY CONTAINMENT,INCLUDING TESTING, 7 2 OPW 60VSP-1001 1"x 11/2"Poppeted Vapor Shear Valve ° <br /> ---- ---- - � ` IN ACCORDANCE WITH MANUFACTURER'S GUIDELINES. <br /> ` 5.3. FINAL.INSPECTION INCLUDING ALL PORTIONS OF THE LEAK 8 7 UNISOURCE FG1 SO-QFQG90-12 1 112"F x 2"Q-Fit Glue Flex Connector with <br /> DETECTION SYSTEM. 90 Degree Elbow <br /> 6. ALL TANK SUMPS AND UNDER DISPENSER CONTAINMENT SUMPS SHALL BE <br /> &3,-) 4"S o J ` HYDROSTATICALLY TESTED(LAKE TEST)WITH STANDING WATER FOR A 9 7 Smith FRP 1203-626-0 3"A82481 Sump PenetrationlTermination Fitting. <br /> a C' R M JD 4 1 PERIOD OF 24 HOURS TO INSURE THAT THE SUMPS ARE WARERTIGHT. <br /> 9.32 I1 \ 7. TANK SYSTEM, LEAK DETECTORS AND MONITORING SYSTEM INTEGRITY <br /> l <br /> TESTS SHALL BE FORWARDED TO AND APPROVED BY GOVERNING AGENCY 10 7 Smith FRP 1204-238-3 4"x3"Concentric Reducer <br /> REMOVE PRODUCT \ PRIOR TO TANK SYSTEM BEING PLACED IN OPERATION,THE CONTRACTOR <br /> PIPING 1 SHALL BE RESPONSIBLE FOR CONTATING THE RESPECTIVE 11 2 VEEDER-ROOT 794380-208 Sump Sensors <br /> -- --- - - 1 1 ENVIRONMENTAL HEALTH AGENCY AND AIR POLLUTION CONTROL <br /> ° I DISTRICTS IN ADVANCE OF SYSTEM TESTS.PASSING TEST RESULTS ARE VAPOR SYSTEM-HOSES&NOZZLES <br /> 11 REQUIRED TO BE SUBMITTED TO THE AGENCIES WITHIN 30 DAYS OF co <br /> _ START-UP.SECONDARY CONTAINMENT TESTS ARE REQUIRED 6 MONTHS 12 4 Healy VP1000A"Universal"Vapor Kit <br /> I �i LATER AND EVERY THREE(3)YEARS THEREAFTER,PURSUANT TO HEALTH Includes Q w <br /> Illi - P VP1000-5 vacuum pump, 1360A interface module and 1404 universal U v <br /> Ii AND SAFETY CODE SECTION 25281.1 (a)(4)(B). <br /> 8. <br /> I AN UNAUTHORIZED RELEASE RESPONSE PLAN MUST BE SUBMITTED TO, hardwarelmounting kit. <br /> AND APPROVED BY,GOVERNING AGENCY PRIOR TO TANK OPERATIONS. <br /> -- 9. EVIDENCE OF FINALCIAL RESPONSIBILITY SHALL BE SUBMITTED TO 13 4 HEALY 2071 V Single Vapor Piping Installation Kit <br /> oGOVERNING AGENCY.00 0 �d a <br /> w w Al 41 q, � � IJ 10. ALL MATERIALS SHALL BE COMPATIBLE WITH USE FOR THE INTENDED 14 4 HEALY Z070E Electrical Installation Kit <br /> ZZZZ <br /> �+ y w y y J l PURPOSE AS PER NATIONALLY RECOGNIZED CODES,LOCAL CODES AND <br /> - EXISTING l GOVERNING AUTHORITIES. o <br /> - W 15 8 HEALY 76B-010-S4F212"Whip Hose wlBalance Threads One End oLU <br /> FUEL CANOPY L PETROL=U PIP E I 11. THE UNDERGROUND STORAGE TANKS SYSTEM SHALL BE COMPATIBLE <br /> WITH THE PRODUCT STORED. 16 8 HEALY 75B-090-S2S2 9' Hose 2 �; �' M. <br /> I�� c NO. 1D ERIU':N Y T �N 12. ALL EXPOSED METAL ANCHORING STRAPS/CABLES,PIPE AND/,OR TANK 0 z 1 CO <br /> 0 00 Og R J N E! y y I FITTINGS AND APPUTERANCES SHALL BE TREATED WITH AN APPROPRIATE 17 8 HEALY 8701-VV Break-a-way ° ° W <br /> REMOVE TEES REPLACE EXISTING PIPING ASPHALT COATING OR OTHER PROTECTIVE COATING PURSUANT TO 18 8 HEALY 900 O.R.V.R. EVR Nozzle <br /> HEALTH AND SAFETY CODE,25281.5;CALIFORNIA CODE REGULATIONS, <br /> C, WITH ELBOWS TO REMAIN 19 1 HEALY 9961 Bladder Tank-Clean Air Separator <br /> W TITLE 23,2636,SUBd(b). <br /> i U EL ISLANDS DC 13. CONTRACTOR MUST BE CERTIFIED BY MANUFACTURER TO INSTALL VEEDER ROOT IN-STATION DIAGNOSTICS ISD q__ <br /> EQUIPMENTS. 20 4 VEEDER-ROOT 330020.445 Vapor Flow Sensor <br /> TANK/PIPING GENERAL NOTES <br /> 21 1 VEEDER-ROOT 330160-004 SEM Software Enhancement Module y <br /> w v 1 DISPENSER START UP BY MANUFACTURER'S REPRESENTATIVE, 22 1 VEEDER-ROOT 330020-615 ISD Manuals&Vapor Pressure Sensor-1 per site 11 <br /> w CONTRACTOR TO PURGE LINES WITH 200 GALLONS PER HOSE MINIMUM, 23 1 VEEDER-ROOT 330280-401 G-Site Dispenser Interface Module(DIM) a <br /> y ANY AIR POCKETS OR START UP PROBLEMS DUE TO IMPROPER <br /> 7 w INSTALLATION OR INCORRECT WIRING THAT DESTROYS ELECTRONICS 24 1 VEEDER-ROOT 331063-100 G-Site cable to TLS35OR&Installation Manual <br /> WILL BE BILLED BACK TO THE CONTRACTOR, <br /> 1G KS TO BE INSTALLED PER MANUFACTURER'S 25 8 HEALY 756-090S2S2 9' Hose <br /> 2 ALL NEW PIPING AND TANKS <br /> wRECOMMENDATIONS AND INSTALLATION INSTRUCTIONS.CONTRACTOR 26 8 HEALY 8701-VV/Break-a-way w <br /> 4 SHALL USE FLEXIBLE CONNECTORS FROM THE TANK SUMP TO THE E•1 <br /> BEFORE A CHANGE IN DE AT 28 1 e <br /> L I R <br /> VAPOR RECOVERY MANIFOLD, MAIN PRODUCT LINES SHALL PROVIDE 27 8 HEALY 900 RVR EV Nozzle <br /> � <br /> LEAST 4 FEET OF STRAIGHT FRP PIPE RUN HEALY 9961 Bladder Tank-Clean Air Separator <br /> DIRECTION OF MORE THAN 30 DEGREES. VEEDER ROOT IN-STATION DIAGNOSTICS ISD V� <br /> 0 W 3 PRODUCT,VAPOR AND VENT PIPING IS TO SLOPE TOWARD TANK 118" <br /> C12 PER FOOT MINIMUM. 29 4 VEEDER-ROOT 330020-445 Vapor Flow Sensor I� <br /> C) 1 4 SECONDARY CONTAINMENT PIPING IS SHOWN BY NOTE ONLY,NOT W <br /> Z CAR WASHP R ` y I GRAPHICALLY.ALL PRODUCT,VAPOR RECOVERY AND VENT PIPING 30 1 VEEDER-ROOT 330160-004 SEM Software Enhancement Module <br /> SHALL BE DOUBLE CONTAINMENT PIPE. <br /> O _. w <br /> R 5 SEE SHEET PET2 FOR GENERAL TANK NOTES AND SPECIFICATIONS. 31 1 VEEDER-ROOT 330020-515 15D Manuals&Vapor I?ressure Sensor-1 <br /> per site o �iTy <br /> \ { `- — 132 1 VEEDER-ROOT 330280-401 G-Site Dispenser Interface Module(DIM) <br /> CD <br /> EXISTING N j <br /> U _ 33 1 VEEDER-ROOT 331063.100 G-Site cable to TLS35OR&Installation Manual <br /> Q <br /> CONVENIENCE <br /> I � <br /> r- 1 VEEDER-ROOT 330586.001 Dual RS-232 interface Module Ir <br /> � <br /> W N l p CONTACT INFORMATION <br /> 34 <br /> �'I \ STORE 8 O I+ W 35 1 VEEDER-ROOT 329356-004 8 Input Smart Sensor Module. O LL <br /> cl�;ASS II F1\I CJ I OWNERIOPERATORS 36 1 VEEDER-ROOT 331500 358 ECPU2 W Q <br /> EV 1ST.EVERGREEN CORP/ MISCELLANOUS U <br /> y SERVICE STATION <br /> EJECT — _ jam.. l 1612 W.HAMMER LN., 37 3 RED JACKET 880.047-1 Isotrol Isolation Control Box With Relay j 0 ! <br /> O f 1 n ICALIFORNIA <br /> \ A^Tf �V UL I,L a c r^ CD STOCKTON, <br /> 3B 2 PDM 6X64PDM 6"X 84"Square Guard Post f <br /> " p CIVIL ENGINEER I "quantity Subject to Healy Tank Location" � Z Y <br /> I w (V MA DESIGN-BUILD,INC. O O <br /> M <br /> E L_C] 2696_ _ ► 2696 SCREECH OWL WAY <br /> - - - - -- P N E_I_ SACRAMENTO,CA 95834 0 ~ {� <br /> j <br /> — - - <br /> V NTS PHONE:(916)690-0509 z F¢.. <br /> SURVEYOR -. ---J (n Z <br /> ` g DUSTY WILTON W <br /> !i / T I <br /> LODID.B.WILTON LAND SURVEYING Q <br /> l <br /> ::::::::::: :: - P.O.BOX 435 O <br /> J Q W ! <br /> 1513 W A�41AIN0 AVE x <br /> 2 I , CA 95241-0435 E <br /> . " <br /> �- j ( ) 1) w Rtr� r k, �. 1� W <br /> PH: 209 747-0169 .e FX: (209)334-3736 *� " Q <br /> 4 <br /> ARCHITECT,ELECTRICAL/ <br /> p,MECHANICALlPLUMBING ENGINEERS Sha° l <br /> ILU N <br /> IRQLMAR i 2009 0DAVID,MFOR � <br /> 690174 <br /> SOC 0 ON,CA 95269 <br /> i ! SAN <br /> 4F'ON ENCOUNTY <br /> PH:(209)470-031 BEN � <br /> I: HEALTH DE RTMENT I <br /> r <br /> I� L J <br /> N.E.C. HAZARDOUS AREA NOTES Co o 00 <br /> ,II <br /> 0 CO <br /> N.E.C.ARTICLE 514 CLASS 1, LOCATION (TYPICAL) Q 05 ~ <br /> 5 j l 0 10 20 o - N <br /> 5 = 0(000 <br /> w l I FOR UNDERGROUND TANK -VENT DISCHARGE UPWARD: W Z 0) (.0 <br /> EXTENT OF CLASS 1, GROUP"D'; &DIVISION 1 LOCATION: N W W c4 <br /> A _ SCALE IN FEET . . <br /> WITHIN 3-FOOT OF OPEN END OF VENT, EXTENDING IN ALL DIRECTIONS. <br /> EXTENT OF CLASS 1, GROUP"D", &DIVISION 2 LOCATION: (0 Z <br /> SPACE BETWEEN 3-FOOT AND 5-FOOT OF OPEN END OF VENT, EXTENDING IN ALL DIRECTIONS. U¢ O <br /> � � � � cV cA-cl, IL <br /> TRASH <br /> SCOPE OF WORK KEY DESIGNATIONS LEGEND <br /> 12K GAL, WALL UST(REGULAR)TO REMAIN. o p <br /> N89052'05"E 150.37' 1. RELOCATE EXISTING TWO DISPENSERS(N.MOST) Q 8K GAL, WALL UST(REGULAR)TO REMAIN . DIESEL GAS PIPING <br /> ASSOCIATED PRODUCT PIPING. d n <br /> P P <br /> G 2.INSTALL CANOPY(#2)MEASURING 24'x32'ON EAST Q3 4K GAL, WALL UST(DIESEL)TO REMAIN. PREMIUM GAS PIPING m <br /> v OF CONVENIENCE STORE. ® INSTALL 2"FIBER GLASS REINF.WALL PIPING.SEE DETAIL 1 ON SHEET 3. z <br /> A I 3.INSTALL TWO DISPENSERS(3+0&3+1) "Q NOT USED REGULAR GAS PIPING R 0. . O 0 <br /> ON EAST OF CONVENIENCE STORE. {/y n <br /> 4.INSTALL PRODUCT PIPING FOR NEW DISPENSERS, <br /> ® INSTALL CLEAN AIR SEPERATOR SEE PET-4 FOR DETAILS. VAPOR RECOVERY PIPING-VR VP VR <br /> 5.INSTALL EVR SYSTEM(HEALY). C�7 INSTALL(E)EMERGENCY SHUTT OFF AND SIGNAGE LOCATION (EXTERIOR WALL OF Z <br /> FUEL SYSTEM PIPING PLAN BUILDING. FACING TO PUMP SWITCH LOCATED 60"ABOVE GROUND), VENT PIPING v v v <br /> SCALE = 1"=10'-0'- eQ INSTALL OVER FELL ALARM LOCATION SEE DETAIL 5 ON SHEET 3. <br /> lip ® INSTALL 4"DIA STEEL BOLLARD SEE DETAIL 4 ON SHEET 3. <br /> Q INSTALL 4'x6'CONCRETE SLAB FOR VENT BOX/CLEAN AIR SEPERATION. <br /> Q INSTALL 2A40 BC FIRE EXTINGUISHER LOCATION(TOP OF EXTINGUISHER IS 48"ABOVE GROUND). Q <br /> ® INSTALL NO"SMOKING"&"TURN OF MOTOR"SIGNAGES ON CANOPY COLUMNS. 0000 <br /> Q3 RELOCATE EXISTING TWO DISPENCERS FROM NORTH TO NEW LOCATION AT EAST <br /> OF CONVENIENCE STORE. o <br /> ® EXISTING CANOPY TO BE REMOVED. <br /> ® EXISTING 2"&3"FRP RETURN LINES TO BE REMOVED. Q <br />