go
<br /> EQUIPMENT LIST z
<br /> COMPLIANCE NOTES — Q � r LU
<br /> 1. ARCHITECTURAL_AND CIVIL DRAWINGS SHALL TAKE PRECEDENCE ON Ai_L
<br /> o N
<br /> DIMENSIONS, PROPERTY LINES, ELEVATIONS AND EQUIPMENT LOCATIONS.
<br /> 2. ALL DIMENSIONS AND CONDITIONS SHALL BE CHECKED AND VERIFIED It J
<br /> THE FIELD BEFORE STARTING ANY WORK. ANY DISCREPANCY SHALL BE
<br /> CALLED TO THE ATTENTION OF THE OWNER'S ENGINEER FOR HIS DECISION SR. I
<br /> I
<br /> ff�
<br /> PRIOR TO PROCEEDING WITH-THE WORK. NO, RELOCATED DISPENSER ACCESSORIES:I11 ,•3` 3. GENERAL CONTRACTOR SHALL OBTAIN NECESSARY PERMIT FROM THE 1 8 I PDM 6X84PDM 6 X 84" Square Guard Post.
<br /> DIVISION OF INDUSTRIAL SAFETY(STATE:OF CALIFORNIA)FOR
<br /> f EXCAVATIONS OF TRENCHES 5`-0"OR MORE IN DEPTH INTO WHICH A 2 1 Bravo 89000-F2L-8 Single Wali Fiberglass Dispenser Sump
<br /> ---- I I
<br /> PERSON 1S REQUIRED TO DESCEND.
<br /> --
<br /> - 4. GENERAL CONTRACTOR SHALL PROVIDE 72 HOUR NOTIFICATION TO 3 1 Bravo B9000-F3L-B Single Wall Fiberglass Dispenser Sump
<br /> GOVERNING AGENCY PRIOR TO TANK--
<br /> INSTALLATION.
<br /> - ; - -___ - _- - 5. 4 2 i BRAVO EO-FRM Electrical Offset
<br /> PROVISION OF NEW TANK 15 NOT ANTICIPATED IN THE DESIGN HOWEVER
<br /> NEW TANK IS TOB NC THIS SYSTEM IT WILL BE INSPECT ED
<br /> IFA N A E INCLUDED IN I �m
<br /> I BY OWNER'S ENGINEER AND GOVERNING AGENCY AT FOUR(4)SEPARA J'E 5 2 BRAVO BRKT-B2 Vapor Shear Valve Bracket
<br /> CONSTRUCTION PHASES AS REQUIRED
<br /> �. < ;\ 5.9. TANK AND PRIMARY PIPING HYDROSTATICALLY OR PNEUMATICALLYN89°48'09"E '120.43' �.; TESTED FOR 30 MINUTES. MAXIMUM PNEUMATIC TEST PRESSURE 6 5 DPW 10BHMP 5830 Double Poppet Shear Valve Male
<br /> FOR ECTION OFALL SECONDARY 5.2.
<br /> CONTAINMENT, INCLUDING TESTING, 7 2 DPW 60VSP-1001 1" x 1 1I2" Poppeted Vapor Shear Valve
<br /> r
<br /> -- - —_- IN ACCORDANCE WITH MANUFACTURER'S GUIDELINES. ri
<br /> 5.3. FINAL INSPECTION INCLUDING ALL PORTIONS OF THE LEAKZI
<br /> 8 7 UNISOURCE FG150-QFQG90-12 1 112"F x 2"Q-Fit Glue Flex Connector with
<br /> DETECTION SYSTEM.
<br /> 90 Degree Elbow
<br /> ` (} 9 I' 6. ALL TANK SUMPS AND UNDER DISPENSER CONTAINMENT SUMPS SHALL BE
<br /> X3.35 � 5 / 1' \ er
<br /> HYDROSTATICALLY TESTED (LAKE TEST)WITH STANDING WATER FOR A
<br /> e PERIOD OF 24 HOURS TO INSURE THAT THE SUMPS ARE WARER FIGHT, 9 7 Smith FRP 1203-626-0 3" A62481 Sijmp Pen etrationlTermination Fitting.
<br /> � l � 4 �
<br /> \ l \\ 7 TANK SYSTEM, LEAK DETECTORS AND MONITORING SYSTEM INTEGRITY
<br /> �......1 TESTS SHALL BE FORWARDED TO AND APPROVED BY GOVERNING AGENCY 10 7 Smith FRP 1204-238-3 4"x3" Concentric Reducer
<br /> PRIOR TO TANK SYSTEM BEkNG PLACED IN OPERATION. THE CONTRACTOR
<br /> REMOVE PRODUCT
<br /> 1 1 SHALL BE RESPONSIBLE FOR CONTATING THE RESPECTIVE 11 2 VEEDER-ROOT 794380-208 Sump Sensors
<br /> 1A _ _ - _ - - ° PIPING \\ 11 1 ENVIRONMENTAL HEALTH AGENCY AND AIR POLLUTION CONTROL
<br /> 1,
<br /> DISTRICTS IN ADVANCE OF SYSTEM TESTS. PASSING TEST RESULTS ARE
<br /> REQUIRED TO BE SUBMITTED TO THE AGENCIES WITHIN 30 DAYS OF VAPOR SYSTEM HOSES & NOZZLES m
<br /> START-UP. SECONDARY CONTAINMENT TESTS ARE REQUIRED 6 MONTHS 12 4 Healy VP f000A "Universal" Vapor Kit U, n
<br /> l l LATER AND EVERY THREE (3)YEARS THEREAFTER, PURSUANT TO HEALTH Includes z
<br /> h I
<br /> AND SAFETY CODE SECTION 25281.1 (a)(4)(B). VP1000-5 vacuum pump, 1360A interface module and 1404 universal
<br /> _ _ _ _, } !!I 8. AN UNAUTHORIZED RELEASE RESPONSE PLAN MUST BE SUBMITTED TO, hardwarelmounting kit.
<br /> �•� - AND APPROVED BY, GOVERNING AGENCY PRIOR TO TANK OPERATIONS
<br /> " 9. EVIDENCE OF FINALCIAL RESPONSIBILITY SHALL BE SUBMITTED TO
<br /> 13 4 HEALY 2071V Single Vapor Piping Installation Kit
<br /> / II GOVERNING AGENCY. < a
<br /> - --- -- - 1v I I 10. ALL MATERIALS SHALL BE COMPATIBLE WITH USE FOR THE INTENDED
<br /> - - -_�
<br /> I.i
<br /> 00
<br /> PURPOSE AS PER NATIONALLY RECOGNIZED CODES, LOCAL CODES AND 14 4 HEALY Z070E Electrical Installation Kit
<br /> EXISTING
<br /> ---- GOVERNING AUTHORITIES. ei
<br /> a II 15 8 HEALY 758-010-54F2 12" WhipHose wlBalance Threads One End aI
<br /> FI rCl CANOPY CUT $ CAP PIPING 11. THE UNDERGROUND STORAGE TANKS SYSTEM SHALL_BE COMPATIBLE
<br /> V E L Pf �: ) �liv f' F�1= L z s 3 Y
<br /> 11- wlrH THE PRODUCT STORED, 16 8 HEALY 75B-090-5252 9' Hose c� c,
<br /> -o NO. '� )_ _1 1 111 IL Y L `J 12. ALL EXPOSED METAL ANCHORING STRAPSICABLES, PIPE ANDLOR TANK w' 71
<br /> 17 8 HEALY 8701-VV Break-a-wa T`
<br /> � I I Ft�fT4NGS AND APPUTERANGES SHALL BE TREATED WITH AN APPROPRIATE I Y ❑ ! cz �j �
<br /> XISTING PIPING _ ASPHALT COATING OR OTHER PROTECTIVE COATING PURSUANT TO
<br /> u I A 18 8 HEALY 900 O.R.V.R. EVR Nozzle
<br /> HEALTH AND SAFETY CODE, 25281.5; CALIFORNIA CODE REGULATIONS,
<br /> o - 19 1 HEALY 9961 Bladder Tank -Clean Air Separator
<br /> - _-
<br /> TILE 23, 2636, SUED(b). p
<br /> _ I Ui:..l ISI A\l.;S Ix1 y 13, CONTRACTOR MUST BE CERTIFIED BY MANUFACTURER TO INSTALL
<br /> i
<br /> -o
<br /> EQUIPMENTS. 20
<br /> ROOT IN-STATION DIAGNOSTICS ISD
<br /> �---.�
<br /> � H ` \ 'I
<br /> 20 4 VEEDER-ROOT 330020-445 Vapor Flaw Sensor TANK/PIPING GENERAL NOTEv-
<br /> 21 1 VEEDER-ROOT 330160-004 SEM Software Enhancement Module (�
<br /> s L i DISPENSER START UP BY MANUFACTURER'S REPRESENTATIVE, 22 1 VEEDER-ROOT 330020-515 ISD Manuals & Vapor Pressure Sensor-1 per site
<br /> CONTRACTOR TO PURGE LINES WITH 200 GALLONS PER HOSE MINIMUM. 23 1 VEEDER-ROOT 330280-401 G-Site Dispenser Interface Module (DIM)
<br /> ANY AIR POCKETS OR START UP PROBLEMS DUE TO IMPROPER
<br /> INSTALLATION OR INCORRECT WIRING THAT DESTROYS ELECTRONICS 24 1 VEEDER-ROOT 331063-1.00 G-Site cable to TLS35OR & installation Manual
<br /> WILL BE BILLED BACK TO THE CONTRACTOR.
<br /> 2 ALL NEW PIPING AND TANKS TO BE INSTALLED PER MANUFACTURER'S 25 8 HEALY 758-090-5252 9' Hose
<br /> ' - RECOMMENDATIONS AND INSTALLATION INSTRUCTIONS CONTRACTOR ! W
<br /> 28 8 HEALY 8701-VV Break-a-way
<br /> - i - - -
<br /> SHALL USE FLEXIBLE CONNECTORS FROM THE TANK SUMP TO THE
<br /> VAPOR RECOVERY MANIFOLD. MAIN PRODUCT LINES SHALL PROVIDE AT 27 8 i HEALY 900 O.R.V.R. EVR Nozzle
<br /> LEAST 4 FEET OF STRAIGHT FRP PIPE RUN BEFORE A CHANGE IN
<br /> 28 1 HEALY 9961 Bladder Tank Clean Air Separator
<br /> DIRECTION OF MORE THAN 30 DEGREES.
<br /> CD 3 PRODUCT, VAPOR AND VENT PIPING IS TO SLOPE TOWARD TANK 118" VEEDrrR ROOT iN STATION DIAGNOSTICS ISD
<br /> C12 - j I PER FOOT MINIMUM. 29 4 1 VEEDER-ROOT 330020-445 Vapor Flow Sensor }..�
<br /> O 4I I j 4 SECONDARY CONTAINMENT PIPING IS SHOWN BY NOTE ONLY, NOT I ►� W
<br /> .._,r ! GRAPHICALLY. ALL PRODUCT VAPOR RECOVERY AND VENT PIPING Software nt3 nc r 1 nt Module ~
<br /> Z A WASH ' R 30 1 VEEDER-ROOT 330160-004 SEM Soft a e E a e, e
<br /> TALL BE DOUBLE CONTAINMENT PIPE.
<br /> O I ® I 51 31 1 , VEEDER-ROOT 330020-516 ISD Manuals & Vapor Pressure Sensor-1 per site
<br /> , . H 5 SEE SHEET PET2 FOR GENERAL TANK NOTES ANIS SPECIFICATIONS. I p 3
<br /> =`
<br /> 1
<br /> c VEEDER-ROOT 330280-401 G SrieDIspenser Interface Mod{ e ( f )32 10
<br /> CT) EXISTING
<br /> r.
<br /> 33 1 VEEDER-ROOT 331063-100 G-Site cable to TLS35OR 8 Installation Manual Q
<br /> At ~ CONVENIENCE d !� z
<br /> W K'I, I c E CONTACT INFORMATION
<br /> 34 1 VEEDER-ROOT 330586.001 Dual RS-232 Interface Module Ir
<br /> STORE $ I 1 p
<br /> I ` �- © 1 35 1 VEEDER-ROOT 329355-004 8 input Smart Sensor Module. �
<br /> 15
<br /> Z OWNERIOPERATORS 36 1 VEEDER-ROOT 331500-358 ECPU2 7j
<br /> F ... .. Z .... IQ
<br /> I
<br /> w I j 1ST. EVERGREEN CORP( MiSCELLANOUS W U
<br /> SERVICE STATION
<br /> 1 O E 1612 W. HAMMER LN., 37 3 RE[]JACKET 880-047-1 lsotrai Isolation Control Box With Relay Z
<br /> �
<br /> I LLC. (. IQ
<br /> LL.( VAJL .L LL o 1, STOCKTON, CALIFORNIA > Q O
<br /> _. 1, - c; (..i I j CIVIL. ENGINEER 38 z Quant$pSl7 eci toBHeat l an L{ocat oust LL Z
<br /> I I I WWI DESIGN-BUILD, INC.
<br /> -- EL C 7. C ' I. -_-- - J 2696 SCREECH OWL WAY O Q
<br /> SCRAMET , CA
<br /> --... --- I PHON E(916)690 -05094 Z Q
<br /> SURVEYOR
<br /> DUSTY WILTON W -A
<br /> I I D.B. WILTON LAND SURVEYING 6
<br /> P
<br /> ` `) \ 1 E I .O. BOX 435
<br /> t ; 1 , W
<br /> I LODI, CA 95241-0435
<br /> - . -- I
<br /> PH: (:209)747-0169
<br /> J
<br /> FX: (209)334-3736 , ¢
<br /> 1 _
<br /> ARCHITECT,ELECTRICALI ,,...� '�. ;I '
<br /> > >:.
<br /> I{ j MECHANICALlPLUIV113iNG ENGINEERS
<br /> [V
<br /> LINE 2 DESIGN: .
<br /> r
<br /> - -
<br /> RD FL
<br /> I II C4 1 RO
<br /> DAVID,
<br /> BOXi690174 R
<br /> --- - STOCKTON CA 95269
<br /> I I i �I
<br /> - PH: (209)470-0318
<br /> o sooa q� a
<br /> N.E.C. HAZARDOUS AREA NOTES d 00 in
<br /> rn Ci Co
<br /> j No.C 64568 m CO
<br /> _ ILII N.E.C. ARTICLE 514 CLASS 1, LOCATION (TYPICAL) 4� EXT"? rn
<br /> co 10 20O O
<br /> s UOw m
<br /> i 0R [JNLJERGRCCaI_11V17 TANK._=VEiVT.._DISGFiARGE.UP�UARD_ �r ���G� W Z o
<br /> r II EXTENT OF CLASS 1, GROUP "D'; & DIVISION 1 LOCATION: OF CAt ' N W "
<br /> ^:
<br /> --- I I W4TFillV 3 FOOT OF OPEN ENQ OF VENT, EXTENDING iN ALL DIRECTIONS. SCALE IN FEET U co
<br /> I EXTENT OF CLASS 1, GROUP 'D", & DIVISION 2 LOCATION: Q Z
<br /> I SPACE BETWEEN 3-FOOT AND 5-FOOT OF OPEN END OF VENT, EXTENDING IN I'LL DIRECTIONS. cp U O
<br /> TRASH 1 N cQn a
<br /> SCOPE OF WORK KEY DESIGNATIONS LEGEND -Ol---C)
<br /> a III
<br /> ..,n„.. ....��—.K�..i......n.��-a.--��...- -,... ...ru.,.� � .,..r-n.u.��•-u..-.�-- .w-��-�wwr�� ..........._ .r._ .. ,asv, -1
<br /> `---- Q GAL_, kVALL UST(REGULAR)TO REMAIN . r�
<br /> I
<br /> 12K rr rw�{
<br /> I? N89°52'05"E 1 5'50.37' I j I 1. RELOCATE EXISTING TWO DISPENSERS (N MOST) Q) 8K GAL, WALL UST (REGULAR)TO REMAIN . DIESEL GAS PIPING
<br /> III I ASSOCIATED PRODUCT PIPING. a a
<br /> 9 � 1 2 .INSTALL CANOPY(#2)MEASURING 24'x32'ON EAST Q3 4K GAL, WALL UST (DIESEL)TO REMAIN - PREMIUM GAS PIPING v P I 5
<br /> OF CONVENIENCE STORE Q INSTALL.2" FIBER GLASS REINF_WALL PIPING. SEE DETAIL 1 ON SHEET 3. I' m
<br /> 1 I I 3 .INSTALL TWO DISPENSERS(3+0 5 3+1) REGULAR GAS PIPING a a �� Z c9
<br /> d � I Q INSTALi_VENT RACK E/BRAVO BOX SEE DETAIL 2 ON SHEET 3 & SHEET 4. 1� •r4 in
<br /> ! ON EAST OF CONVENIENCE STORE. E uj ru
<br /> I 1 I ® INSTALi-CLEAN AIR SEPERATOR SEE PET-4 FOR DETAILS. VAPOR RECOVERY PIPING-,x-
<br /> 4 a
<br /> .INSTALL PRODUCT PIPING FOR NEW DISPENSERS. lr a
<br /> MAR 2 200 r�T �+ �+ �T�i 7 T II li E 5 .INSTALL EVR SYSTEM(HEALY), 07 INSTALL(E) Etv1ERGENCY SHUTT OFF AND SIGNAGE LOCATION(EXTERIOR WALL OF
<br /> i' U EL SYSTEM PIPING PIAN � i I BUILDIIJG. FACING TO PUMP SWITCH LOCATED 60"ABOVE GROUND). VENT PIPING _, „ �-�_ _ z
<br /> ENVIR()NNIE-Ni
<br /> , H ALW + � —
<br /> INSTALL OVER FILL ALARM LOCATION SEE DETAIL 5 ON SHEET 3.
<br /> PERMITISERVICES = 1 "=10'_0
<br /> j ® INSTALL 4" DIA STEEL BOLLARD SEE DETAIL 4 ON SHEET 3.
<br /> INSTALL 4'x6'CONCRETE SLAB FOR VENT BOX(CLEAN AIR SEPERATION. .
<br /> CA
<br /> r i
<br /> ! 11 INSTALL 2A40 BC FIRE EXTINGUISHER LOCATION (TOP OF EXTINGUISHER IS 48"ABOVE GROUND).
<br /> j © INSTALL NO"SMOKING"&"TURN OF MOTOR"SIGNAGES ON CANOPY COLUMNS. 0
<br /> RELOCATE EXISTING TWO DISPENCERS FROM NORTH TO NEW LOCATION AT EAST
<br /> OF CONVENIENCE STORE.
<br /> 0
<br /> ® EXISTING CANOPY TO BE REMOVED. Z
<br /> EXISTING 2" & 3" FRP RETURN LINES TO BE REMOVED. CI
<br /> Q
<br />
|