Laserfiche WebLink
go <br /> EQUIPMENT LIST z <br /> COMPLIANCE NOTES — Q � r LU <br /> 1. ARCHITECTURAL_AND CIVIL DRAWINGS SHALL TAKE PRECEDENCE ON Ai_L <br /> o N <br /> DIMENSIONS, PROPERTY LINES, ELEVATIONS AND EQUIPMENT LOCATIONS. <br /> 2. ALL DIMENSIONS AND CONDITIONS SHALL BE CHECKED AND VERIFIED It J <br /> THE FIELD BEFORE STARTING ANY WORK. ANY DISCREPANCY SHALL BE <br /> CALLED TO THE ATTENTION OF THE OWNER'S ENGINEER FOR HIS DECISION SR. I <br /> I <br /> ff� <br /> PRIOR TO PROCEEDING WITH-THE WORK. NO, RELOCATED DISPENSER ACCESSORIES:I11 ,•3` 3. GENERAL CONTRACTOR SHALL OBTAIN NECESSARY PERMIT FROM THE 1 8 I PDM 6X84PDM 6 X 84" Square Guard Post. <br /> DIVISION OF INDUSTRIAL SAFETY(STATE:OF CALIFORNIA)FOR <br /> f EXCAVATIONS OF TRENCHES 5`-0"OR MORE IN DEPTH INTO WHICH A 2 1 Bravo 89000-F2L-8 Single Wali Fiberglass Dispenser Sump <br /> ---- I I <br /> PERSON 1S REQUIRED TO DESCEND. <br /> -- <br /> - 4. GENERAL CONTRACTOR SHALL PROVIDE 72 HOUR NOTIFICATION TO 3 1 Bravo B9000-F3L-B Single Wall Fiberglass Dispenser Sump <br /> GOVERNING AGENCY PRIOR TO TANK-- <br /> INSTALLATION. <br /> - ; - -___ - _- - 5. 4 2 i BRAVO EO-FRM Electrical Offset <br /> PROVISION OF NEW TANK 15 NOT ANTICIPATED IN THE DESIGN HOWEVER <br /> NEW TANK IS TOB NC THIS SYSTEM IT WILL BE INSPECT ED <br /> IFA N A E INCLUDED IN I �m <br /> I BY OWNER'S ENGINEER AND GOVERNING AGENCY AT FOUR(4)SEPARA J'E 5 2 BRAVO BRKT-B2 Vapor Shear Valve Bracket <br /> CONSTRUCTION PHASES AS REQUIRED <br /> �. < ;\ 5.9. TANK AND PRIMARY PIPING HYDROSTATICALLY OR PNEUMATICALLYN89°48'09"E '120.43' �.; TESTED FOR 30 MINUTES. MAXIMUM PNEUMATIC TEST PRESSURE 6 5 DPW 10BHMP 5830 Double Poppet Shear Valve Male <br /> FOR ECTION OFALL SECONDARY 5.2. <br /> CONTAINMENT, INCLUDING TESTING, 7 2 DPW 60VSP-1001 1" x 1 1I2" Poppeted Vapor Shear Valve <br /> r <br /> -- - —_- IN ACCORDANCE WITH MANUFACTURER'S GUIDELINES. ri <br /> 5.3. FINAL INSPECTION INCLUDING ALL PORTIONS OF THE LEAKZI <br /> 8 7 UNISOURCE FG150-QFQG90-12 1 112"F x 2"Q-Fit Glue Flex Connector with <br /> DETECTION SYSTEM. <br /> 90 Degree Elbow <br /> ` (} 9 I' 6. ALL TANK SUMPS AND UNDER DISPENSER CONTAINMENT SUMPS SHALL BE <br /> X3.35 � 5 / 1' \ er <br /> HYDROSTATICALLY TESTED (LAKE TEST)WITH STANDING WATER FOR A <br /> e PERIOD OF 24 HOURS TO INSURE THAT THE SUMPS ARE WARER FIGHT, 9 7 Smith FRP 1203-626-0 3" A62481 Sijmp Pen etrationlTermination Fitting. <br /> � l � 4 � <br /> \ l \\ 7 TANK SYSTEM, LEAK DETECTORS AND MONITORING SYSTEM INTEGRITY <br /> �......1 TESTS SHALL BE FORWARDED TO AND APPROVED BY GOVERNING AGENCY 10 7 Smith FRP 1204-238-3 4"x3" Concentric Reducer <br /> PRIOR TO TANK SYSTEM BEkNG PLACED IN OPERATION. THE CONTRACTOR <br /> REMOVE PRODUCT <br /> 1 1 SHALL BE RESPONSIBLE FOR CONTATING THE RESPECTIVE 11 2 VEEDER-ROOT 794380-208 Sump Sensors <br /> 1A _ _ - _ - - ° PIPING \\ 11 1 ENVIRONMENTAL HEALTH AGENCY AND AIR POLLUTION CONTROL <br /> 1, <br /> DISTRICTS IN ADVANCE OF SYSTEM TESTS. PASSING TEST RESULTS ARE <br /> REQUIRED TO BE SUBMITTED TO THE AGENCIES WITHIN 30 DAYS OF VAPOR SYSTEM HOSES & NOZZLES m <br /> START-UP. SECONDARY CONTAINMENT TESTS ARE REQUIRED 6 MONTHS 12 4 Healy VP f000A "Universal" Vapor Kit U, n <br /> l l LATER AND EVERY THREE (3)YEARS THEREAFTER, PURSUANT TO HEALTH Includes z <br /> h I <br /> AND SAFETY CODE SECTION 25281.1 (a)(4)(B). VP1000-5 vacuum pump, 1360A interface module and 1404 universal <br /> _ _ _ _, } !!I 8. AN UNAUTHORIZED RELEASE RESPONSE PLAN MUST BE SUBMITTED TO, hardwarelmounting kit. <br /> �•� - AND APPROVED BY, GOVERNING AGENCY PRIOR TO TANK OPERATIONS <br /> " 9. EVIDENCE OF FINALCIAL RESPONSIBILITY SHALL BE SUBMITTED TO <br /> 13 4 HEALY 2071V Single Vapor Piping Installation Kit <br /> / II GOVERNING AGENCY. < a <br /> - --- -- - 1v I I 10. ALL MATERIALS SHALL BE COMPATIBLE WITH USE FOR THE INTENDED <br /> - - -_� <br /> I.i <br /> 00 <br /> PURPOSE AS PER NATIONALLY RECOGNIZED CODES, LOCAL CODES AND 14 4 HEALY Z070E Electrical Installation Kit <br /> EXISTING <br /> ---- GOVERNING AUTHORITIES. ei <br /> a II 15 8 HEALY 758-010-54F2 12" WhipHose wlBalance Threads One End aI <br /> FI rCl CANOPY CUT $ CAP PIPING 11. THE UNDERGROUND STORAGE TANKS SYSTEM SHALL_BE COMPATIBLE <br /> V E L Pf �: ) �liv f' F�1= L z s 3 Y <br /> 11- wlrH THE PRODUCT STORED, 16 8 HEALY 75B-090-5252 9' Hose c� c, <br /> -o NO. '� )_ _1 1 111 IL Y L `J 12. ALL EXPOSED METAL ANCHORING STRAPSICABLES, PIPE ANDLOR TANK w' 71 <br /> 17 8 HEALY 8701-VV Break-a-wa T` <br /> � I I Ft�fT4NGS AND APPUTERANGES SHALL BE TREATED WITH AN APPROPRIATE I Y ❑ ! cz �j � <br /> XISTING PIPING _ ASPHALT COATING OR OTHER PROTECTIVE COATING PURSUANT TO <br /> u I A 18 8 HEALY 900 O.R.V.R. EVR Nozzle <br /> HEALTH AND SAFETY CODE, 25281.5; CALIFORNIA CODE REGULATIONS, <br /> o - 19 1 HEALY 9961 Bladder Tank -Clean Air Separator <br /> - _- <br /> TILE 23, 2636, SUED(b). p <br /> _ I Ui:..l ISI A\l.;S Ix1 y 13, CONTRACTOR MUST BE CERTIFIED BY MANUFACTURER TO INSTALL <br /> i <br /> -o <br /> EQUIPMENTS. 20 <br /> ROOT IN-STATION DIAGNOSTICS ISD <br /> �---.� <br /> � H ` \ 'I <br /> 20 4 VEEDER-ROOT 330020-445 Vapor Flaw Sensor TANK/PIPING GENERAL NOTEv- <br /> 21 1 VEEDER-ROOT 330160-004 SEM Software Enhancement Module (� <br /> s L i DISPENSER START UP BY MANUFACTURER'S REPRESENTATIVE, 22 1 VEEDER-ROOT 330020-515 ISD Manuals & Vapor Pressure Sensor-1 per site <br /> CONTRACTOR TO PURGE LINES WITH 200 GALLONS PER HOSE MINIMUM. 23 1 VEEDER-ROOT 330280-401 G-Site Dispenser Interface Module (DIM) <br /> ANY AIR POCKETS OR START UP PROBLEMS DUE TO IMPROPER <br /> INSTALLATION OR INCORRECT WIRING THAT DESTROYS ELECTRONICS 24 1 VEEDER-ROOT 331063-1.00 G-Site cable to TLS35OR & installation Manual <br /> WILL BE BILLED BACK TO THE CONTRACTOR. <br /> 2 ALL NEW PIPING AND TANKS TO BE INSTALLED PER MANUFACTURER'S 25 8 HEALY 758-090-5252 9' Hose <br /> ' - RECOMMENDATIONS AND INSTALLATION INSTRUCTIONS CONTRACTOR ! W <br /> 28 8 HEALY 8701-VV Break-a-way <br /> - i - - - <br /> SHALL USE FLEXIBLE CONNECTORS FROM THE TANK SUMP TO THE <br /> VAPOR RECOVERY MANIFOLD. MAIN PRODUCT LINES SHALL PROVIDE AT 27 8 i HEALY 900 O.R.V.R. EVR Nozzle <br /> LEAST 4 FEET OF STRAIGHT FRP PIPE RUN BEFORE A CHANGE IN <br /> 28 1 HEALY 9961 Bladder Tank Clean Air Separator <br /> DIRECTION OF MORE THAN 30 DEGREES. <br /> CD 3 PRODUCT, VAPOR AND VENT PIPING IS TO SLOPE TOWARD TANK 118" VEEDrrR ROOT iN STATION DIAGNOSTICS ISD <br /> C12 - j I PER FOOT MINIMUM. 29 4 1 VEEDER-ROOT 330020-445 Vapor Flow Sensor }..� <br /> O 4I I j 4 SECONDARY CONTAINMENT PIPING IS SHOWN BY NOTE ONLY, NOT I ►� W <br /> .._,r ! GRAPHICALLY. ALL PRODUCT VAPOR RECOVERY AND VENT PIPING Software nt3 nc r 1 nt Module ~ <br /> Z A WASH ' R 30 1 VEEDER-ROOT 330160-004 SEM Soft a e E a e, e <br /> TALL BE DOUBLE CONTAINMENT PIPE. <br /> O I ® I 51 31 1 , VEEDER-ROOT 330020-516 ISD Manuals & Vapor Pressure Sensor-1 per site <br /> , . H 5 SEE SHEET PET2 FOR GENERAL TANK NOTES ANIS SPECIFICATIONS. I p 3 <br /> =` <br /> 1 <br /> c VEEDER-ROOT 330280-401 G SrieDIspenser Interface Mod{ e ( f )32 10 <br /> CT) EXISTING <br /> r. <br /> 33 1 VEEDER-ROOT 331063-100 G-Site cable to TLS35OR 8 Installation Manual Q <br /> At ~ CONVENIENCE d !� z <br /> W K'I, I c E CONTACT INFORMATION <br /> 34 1 VEEDER-ROOT 330586.001 Dual RS-232 Interface Module Ir <br /> STORE $ I 1 p <br /> I ` �- © 1 35 1 VEEDER-ROOT 329355-004 8 input Smart Sensor Module. � <br /> 15 <br /> Z OWNERIOPERATORS 36 1 VEEDER-ROOT 331500-358 ECPU2 7j <br /> F ... .. Z .... IQ <br /> I <br /> w I j 1ST. EVERGREEN CORP( MiSCELLANOUS W U <br /> SERVICE STATION <br /> 1 O E 1612 W. HAMMER LN., 37 3 RE[]JACKET 880-047-1 lsotrai Isolation Control Box With Relay Z <br /> � <br /> I LLC. (. IQ <br /> LL.( VAJL .L LL o 1, STOCKTON, CALIFORNIA > Q O <br /> _. 1, - c; (..i I j CIVIL. ENGINEER 38 z Quant$pSl7 eci toBHeat l an L{ocat oust LL Z <br /> I I I WWI DESIGN-BUILD, INC. <br /> -- EL C 7. C ' I. -_-- - J 2696 SCREECH OWL WAY O Q <br /> SCRAMET , CA <br /> --... --- I PHON E(916)690 -05094 Z Q <br /> SURVEYOR <br /> DUSTY WILTON W -A <br /> I I D.B. WILTON LAND SURVEYING 6 <br /> P <br /> ` `) \ 1 E I .O. BOX 435 <br /> t ; 1 , W <br /> I LODI, CA 95241-0435 <br /> - . -- I <br /> PH: (:209)747-0169 <br /> J <br /> FX: (209)334-3736 , ¢ <br /> 1 _ <br /> ARCHITECT,ELECTRICALI ,,...� '�. ;I ' <br /> > >:. <br /> I{ j MECHANICALlPLUIV113iNG ENGINEERS <br /> [V <br /> LINE 2 DESIGN: . <br /> r <br /> - - <br /> RD FL <br /> I II C4 1 RO <br /> DAVID, <br /> BOXi690174 R <br /> --- - STOCKTON CA 95269 <br /> I I i �I <br /> - PH: (209)470-0318 <br /> o sooa q� a <br /> N.E.C. HAZARDOUS AREA NOTES d 00 in <br /> rn Ci Co <br /> j No.C 64568 m CO <br /> _ ILII N.E.C. ARTICLE 514 CLASS 1, LOCATION (TYPICAL) 4� EXT"? rn <br /> co 10 20O O <br /> s UOw m <br /> i 0R [JNLJERGRCCaI_11V17 TANK._=VEiVT.._DISGFiARGE.UP�UARD_ �r ���G� W Z o <br /> r II EXTENT OF CLASS 1, GROUP "D'; & DIVISION 1 LOCATION: OF CAt ' N W " <br /> ^: <br /> --- I I W4TFillV 3 FOOT OF OPEN ENQ OF VENT, EXTENDING iN ALL DIRECTIONS. SCALE IN FEET U co <br /> I EXTENT OF CLASS 1, GROUP 'D", & DIVISION 2 LOCATION: Q Z <br /> I SPACE BETWEEN 3-FOOT AND 5-FOOT OF OPEN END OF VENT, EXTENDING IN I'LL DIRECTIONS. cp U O <br /> TRASH 1 N cQn a <br /> SCOPE OF WORK KEY DESIGNATIONS LEGEND -Ol---C) <br /> a III <br /> ..,n„.. ....��—.K�..i......n.��-a.--��...- -,... ...ru.,.� � .,..r-n.u.��•-u..-.�-- .w-��-�wwr�� ..........._ .r._ .. ,asv, -1 <br /> `---- Q GAL_, kVALL UST(REGULAR)TO REMAIN . r� <br /> I <br /> 12K rr rw�{ <br /> I? N89°52'05"E 1 5'50.37' I j I 1. RELOCATE EXISTING TWO DISPENSERS (N MOST) Q) 8K GAL, WALL UST (REGULAR)TO REMAIN . DIESEL GAS PIPING <br /> III I ASSOCIATED PRODUCT PIPING. a a <br /> 9 � 1 2 .INSTALL CANOPY(#2)MEASURING 24'x32'ON EAST Q3 4K GAL, WALL UST (DIESEL)TO REMAIN - PREMIUM GAS PIPING v P I 5 <br /> OF CONVENIENCE STORE Q INSTALL.2" FIBER GLASS REINF_WALL PIPING. SEE DETAIL 1 ON SHEET 3. I' m <br /> 1 I I 3 .INSTALL TWO DISPENSERS(3+0 5 3+1) REGULAR GAS PIPING a a �� Z c9 <br /> d � I Q INSTALi_VENT RACK E/BRAVO BOX SEE DETAIL 2 ON SHEET 3 & SHEET 4. 1� •r4 in <br /> ! ON EAST OF CONVENIENCE STORE. E uj ru <br /> I 1 I ® INSTALi-CLEAN AIR SEPERATOR SEE PET-4 FOR DETAILS. VAPOR RECOVERY PIPING-,x- <br /> 4 a <br /> .INSTALL PRODUCT PIPING FOR NEW DISPENSERS. lr a <br /> MAR 2 200 r�T �+ �+ �T�i 7 T II li E 5 .INSTALL EVR SYSTEM(HEALY), 07 INSTALL(E) Etv1ERGENCY SHUTT OFF AND SIGNAGE LOCATION(EXTERIOR WALL OF <br /> i' U EL SYSTEM PIPING PIAN � i I BUILDIIJG. FACING TO PUMP SWITCH LOCATED 60"ABOVE GROUND). VENT PIPING _, „ �-�_ _ z <br /> ENVIR()NNIE-Ni <br /> , H ALW + � — <br /> INSTALL OVER FILL ALARM LOCATION SEE DETAIL 5 ON SHEET 3. <br /> PERMITISERVICES = 1 "=10'_0 <br /> j ® INSTALL 4" DIA STEEL BOLLARD SEE DETAIL 4 ON SHEET 3. <br /> INSTALL 4'x6'CONCRETE SLAB FOR VENT BOX(CLEAN AIR SEPERATION. . <br /> CA <br /> r i <br /> ! 11 INSTALL 2A40 BC FIRE EXTINGUISHER LOCATION (TOP OF EXTINGUISHER IS 48"ABOVE GROUND). <br /> j © INSTALL NO"SMOKING"&"TURN OF MOTOR"SIGNAGES ON CANOPY COLUMNS. 0 <br /> RELOCATE EXISTING TWO DISPENCERS FROM NORTH TO NEW LOCATION AT EAST <br /> OF CONVENIENCE STORE. <br /> 0 <br /> ® EXISTING CANOPY TO BE REMOVED. Z <br /> EXISTING 2" & 3" FRP RETURN LINES TO BE REMOVED. CI <br /> Q <br />