My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2013-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
COMPLIANCE INFO 2013-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 9:30:46 AM
Creation date
11/5/2018 11:18:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2015
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HAMMER\1630\PR0518624\COMPLIANCE INFO 2013-2015.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
216
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FMS COSTCO BIR INSTRUCTIONS: <br /> Costco Is Installing BIR at about 350 locations. Many of which will require a cold start. We will need to dial in, <br /> verify communications and also the setup programming before the ASC leaves the site. <br /> �— - <br /> 1. No change in communications number is required, Dial the location and verify that you are able to get data back <br /> 2. Run a startup script MAKE SURE YOU ARE TYPING IN THE CORRECT GVR ID <br /> 3. Let the startup script.finish COMPLETELY. It Is important that It updates the setup Information at the end. <br /> 4, Perform a 3 minute call back <br /> 5. Verify you get the call back <br /> B. Now-go:to-the setup:monitoring screen.. . . <br /> a. Change the Current Display to ALL <br /> b. Change the Dispiaymatches-to non-Matches <br /> c. Push Load <br /> 7. Review the non-matching Items with the ASC to determine why they are different than the approved value. <br /> Obviously,the-new-BIR-data-dommands.may-not-match aince,BIR-was-not Installed previously these values can be _ <br /> accepted but the other non-matching values should be confirmed with the ASC. <br /> 8. If changes are required either you or the ASC will need to make them. If the ASC makes them you will have to <br /> update the setup screen. <br /> a.__Procomm -bring_up.the_setup_command_GUI_and.type.1n.the-corresponding_command.with,_art.-Example _.. <br /> 160200 (update tank labels) <br /> Ti."Bevcom--ClFc The Store response In DW oheck6oz on fFe_6offbmrt59R, Ype fhel coir ma'rid_lfi Fe - <br /> command list and push enter <br /> 9. You are complete when your setup monitoring screen shows that there are no longer any Items that do not match <br /> and you received a 3 minute call back from the locations, <br /> i <br /> i <br /> i <br /> I <br /> i <br /> _ 1. <br />
The URL can be used to link to this page
Your browser does not support the video tag.