Laserfiche WebLink
SWRCB,January 2002 • Page 3 of e'0 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: D Piping Manufacturer X Industry Standard D Professional Engineer <br /> D Other(Spec) <br /> Test Method Used: X Pressure D Vacuum D Hydrostatic <br /> D Other(Sped) <br /> Test Equipment Used: See attached testing procedures Equipment Resolution: <br /> Piping Run# g 7 r Piping Run# 8r2 Piping Run# J(t Piping Run# 4J Z <br /> -.11 Wwalffill <br /> Piping Material: h G <br /> cC <br /> Piping Manufacturer. t/�/t`/j,7i✓ 1 '-� <br /> Piping Diameter. <br /> Length of Piping Run: <br /> Product Stored: �— <br /> Method and location of _ <br /> piping-run isolation: <br /> Wait time between applying 30 minutes 30 minutes 30 minutes 30 minutes <br /> pressure/vacuum/water and <br /> startingtest: <br /> Test Start Time: ,' 4, 0 g <br /> Initial Reading(RJ: S rs - S � <br /> Test End Time: D ,' �/O Ia. /a., 55 <br /> Final Reading(RF): f 79I 57 75 rj />SZ <br /> Test Duration: 1 hour 1 hour 1 hour 1 hour <br /> Change in Reading(RF-R): <br /> Pass/Fail Threshold or 000 0.00 0.00 0.00 <br /> Criteria: <br /> Test Result: VPass 0 Fail If Pass D Fail Pass 0 FailPass ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> SB 989 6 roo. test <br /> VVO#: 040920-117 <br /> Costco#38 <br /> 1676 E. Hammer Lane &west <br /> Stockton; CA 95210 <br />