Laserfiche WebLink
• • PAO <br /> SWRCB,January 2002 age�of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer X Industry Standard 0 Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: X Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec!) <br /> Test Equipment Used: See attached testing procedures Equipment Resolution <br /> Piping Run#`' !ping Run fir ,Piping Run# Piping Run# <br /> Piping Material: A'161=72 640* N <br /> Piping Manufacturer: W • )-4 s <br /> Piping Diameter: y <br /> Length of Piping Run: -- '— <br /> Product Stored: (�,91�it• "L <br /> Method and location of _ <br /> piping-run isolation: <br /> Wait time between applying 30 minutes 30 minutes 30 minutes 30 minutes <br /> pressure/vacuum/water and <br /> jTest <br /> in test: <br /> m <br /> Stest End m /•*OS <br /> Initial Reading(RO: S(2 . /Oal Reading(RF): <br /> est i$ <br /> 1' <br /> � <br /> Duration: 1 hour 1 hour I hour 1 hour <br /> Change in Reading(RF-Rj): <br /> Pass/Fail Threshold or 0.00 0.00 0.00 0.00 <br /> Criteria: <br /> Test Result: bcpass ❑Fail &Pass D Fail ❑ Pass ❑Fail ❑ Pass ❑Fail <br /> Comments—(include information on repairs made prior to 1esling and recommended follow-up for failed lesis) <br /> SB 989 6 mo test <br /> WO#: 040920-117 <br /> Costco#38 <br /> 1616 E. Hammer Lane &West <br /> Stockton, CA 95210 <br />