Laserfiche WebLink
UNDERGROUND TANK AND PIP!NG ISOMETRIC <br />SME: NONE <br />I I UNDERGROUND TANKS <br />A RESPONSIBILITY: <br />1, The Cont ortor octal full responalbllty for prow ho 'd'k'gand ImL.Not[Vo of the f1ble,glon. <br />reonl—ed P -No (FRP) or' comp -IRs und.,9­0 t.,11 -j FRP plpl,,q, and shot rmu.­ that <br />geocl workmanship, ;Kocticts and ca­5Fvcj;m aa,fnfurov are followed during the handling brief <br />,Aalratice, .1 The Forks and piping <br />2, The Cwtroci is resporuLue for inspecting the twks for domcge upur, receipt at the Ph site, <br />Any tstao domage IS to be noted on the dell,ery fa.tpt, <br />3. The presence of the Ch"Pa Rep on—,lithe lines not mL,mo the Contractor of The —porsIbIlIty <br />for vVa, funk hicIdlimi, lnuitalletIon and safely mer—I., <br />1.2 REMOVAL OF EXISTING TANKS AND PIPING SYSTEMS <br />A. RESPONSIBILITY, COKINOCtice will furnish Permits, too., old p,ace, equipment, except as noted, to <br />, ­_ axisUng I .,d [­ per the fallowing proceci <br />I Controcto,, a, part of the contract, will ­uh, and comply with the ERmpany'l, "Addendum <br />Tank D;lgraaol C,ffi,.t;aP Agreement". <br />2 All to, k p and piping eholl be removed and dis ..d of in occordoncer with ins Addendum Tank <br />Di,,,neal C�arhficct;crn Ag­e,t and Vfpa,bi�.Aua and ]-.1 regulations. Rem.11 of tanks <br />and I;— "I] comply with AM Recommended P,QAN,o 1504, Removal and R,pasot of Used <br />Undwgrroanal Starege Tork$ — December 1987 and March 1989 supplement <br />3 Contractshall comply with ourro,j NEPA and lmol repo In tions. <br />4� or Che_ is,.v-rEIw for rerl of of roufabil, product from the t.1,1. Product AM be <br />'et—ed to la,mi"I u, other company facility. <br />B. REMOVAL PROCEDURE: <br />I Excavate to the top of onch fork. Core must <br />be token to prevent <br />breaking product <br />pang, <br />6-11 whn.e <br />Pt" <br />to starting "rco-hon, the cort—In, shall h- 0-o' 1s shut off to any <br />can dill( may 11.19 the <br />a. Butt;- System: Open check -1., pull Poppet .,d d,.;a w.d.0 Fruit, II,e into tank. Do not <br />reps. Poppet. R4 <br />in'tofl cava. on al - <br />fir Pressure System: Blear" pipe at union of remota pump, Dina product Into lank or saaaroto <br />c -I <br />2, Avid spills. Do not allow product to drain into sob. Ccnumcha, may be held Laos if 'Oil <br />Can Lamin atinn Ron—- d ­9 tank and line --L <br />3 Flush oil W­ <br />aat, 1 and apar return line back in P,1k of sibpo,oh, ­t,u­(s). (nu.hi,q in <br />separate ­lci,­ con be dumped into product b.,k, fm, ho,oge ) Purl, each lin. ,Th <br />mlolm­ of 0 gallonsaf at;. <br />4. Open .11 openings .,d rush infid. of each I with a minimum of 200 genome of malar using <br />high ve­a spray equipment with wond to "wool, down' the sides and bottom of the lank, <br />5, (UA- win among. far a vacuum truck <br />to oflect a] rec.—od product (liquid and sludge). <br />Vacuum is to I,I . r,F­d`* p,.6,0 to ",IV' .1 Chevron facility ar w, ­d treating <br />T.01ty eith approved oil/water ­Iarci ayelem, <br />6 The look must be free of flammable voi prior to fearocf. Remove flommatile vapors as <br />prescribed by the preedi,q fire deportment and lQhF monufact,,on's reciukennientit. <br />7. After tank venting, the vapor space small be tested by placing the combustible gas undit,ter' 1-b <br />into the fit Vanimg with <br />the drop tubo --d. Reading sh-Id to taken At the bottom, ri <br />and upper Wtians of The Lank. The tank atmosphere must be 20or, ["a of the V,Ar <br />flourmoble limit <br />;, I. rinthro, Refer to the probe manufacturer's inalru atlarle for testing in IoW <br />oxygen,, nandi0o's, <br />8. Prior to remcal, all tank openings shouild be pugged Dae plug should h— 0 1/8' lent hck to <br />vo,lmt cricie-1,ra pre— rs buildup This — upward, <br />t halt must foo. d at all Time'. <br />9, Plug any ­­!_ causedholes using rarered boll or plug'. Ch,- Rep invert the <br />removed tonk" E" `67" the To'" for sfiipment. <br />C. POST—REMOVAL PROCEDURE: <br />1, All list., I.V6s shot be rami old 91—to the Ch -on Refit. <br />2 Al o,k: must be properly labeled prior to <br />,pP,,oF_ f,— the Us, T,.,,I>a,t of the lank, <br />At IN d- in cro,da­ with all stole <br />a- regluatf.- <br />3 Fall- any tat$ a, accl regulalia,s "ordIrg all samples or of t.,k hote ondla <br />t_ka weer hFw GI -,d durirq y phose of the --I of .,daqrau,d tonk(,) or <br />,dIb is, Y' , the <br />G;�,pang tyft'(s), I— to notify , an Rep. <br />I TYPICAL PANG LAYOUT SHOWN FOR i PRODUCT DISPENSERS, SEE PLANS FOR <br />SPECIFIC DISPENSER TYPE AND CONFI(;jRATIVN FOR TT11S SITE, <br />2. ALL PRODUCT UNI ARE TO BE SECONDARILY CONTAINED <br />3 EVERY TANK CONTAINMENT SUMP AND DI1,PT LASER CONTAINMENT DUMP SHALL CONTAIN <br />A LIQUID SENSING PROBE. <br />4 CAULK THE BOTTOM OF T)NE DISPENSERS 70 INSURE WATER TIGHTNESS <br />5, PERPENCI(DULAR PENETRATIONS OF THE CONTAINMENT SUMPS ARE PREFERRED <br />20' IS 1HE MAXIMUM ALLOWABLE PENETRATION ANGLE. <br />6, SPARE ELECTRICAL CONDUITS MUST BE SEALED. <br />7 SEE SHEET E -I FOR ELECTRICAL CONDUIT LAYCOT. <br />8 OBTAIN WRITTEN APPROVAL FROM CHEVRON FOR LESS THAN 1/4- FIER FOOT <br />SLOPE ON PRODUCT, VAPOR AND ANT LINES, <br />9 TANK RISERS AND DISPENSER PIPING OUST BE ADDRESSED AS FOLLOWS FOR TANKS <br />CONTAINING GASOLINE: <br />• ANNULAR SPACE RISER MUST BE SCHEDULE 40 GALVANIZED PIPE THAT IS PRIMED <br />AND WRAPPED. <br />• FILL, VAPOR AMC) AUTOMATIC TANK RISER MUST BE SCHEDULE 40 GALVANIZED PIPE, <br />EACH RISER MUST BE PRIMED AND WRAPPED IF BACKFILL IS TOUCHING THE RISER, <br />• TURBINE RISER MUST BE SCHEDULE 40 Ri IRON PIPE, <br />• ALL $FEEL DISPENSER PIPING AND FITTINGS MUST BE SCIIEDUtE 40 BLACK IRON FIRE <br />AND PAINTED BLACK, <br />10, FOR MANIFOLDED UNLEAD TANKS USING RED JACKET SUBMERSIBLE TURBINE PUMPS <br />INSTALL A`M3RRlSONT (CHECK VALVE. 0530-25T OR APPROVED EWAL AT EACH <br />UNLEADED PUMP DISCHARGE <br />11, USE 3'0 VAPOR RECOARY PIPING ALL THE WAY BACK TO REGULAR UNLEADED TANK. <br />12 SUPREME SIDE OF DISPENSERS MUST ALWAYS BE ON THE LEFT <br />NEW <br />HAMMER AND HOLMAN <br />9TOCKTORCA. <br />F*q1_ lalevil <br />PRELTAINARY <br />PLANNING __ __ <br />kPERO <br />�_LC!MT <br />.h1AAL Do <br />millf, <br />sms Ve-r-T bill "�* <br />DR (X A". <br />%F -:ET <br />F-2 <br />Bibi. 20 <br />