Laserfiche WebLink
to <br />-`7 <br />ct 0 <br />I <br />MIN. <br />F, 1 6 <br />FOR WALL OF TANK SLAB <br />SEE SHEET F-7,1 <br />�_ PEA GRAVEL <br />BACKFILL <br />4' M-11MINUM FILL Pill 11"T Ii SHUT OFF 42 <br />MONITOR PROBE TO LOW <br />END OF TANK 17 <br />SLOPE TANK 1 <br />DOWN TOWARDS END <br />SEE DET. A BELOW ---7 \ SEE DET,.,_B BELOW <br />STEEL PLATES UNDER EACH OPIENJNK' ' <br />BY TANK MANUFACTURER 24'_0 1/4 - <br />VERIFY Wj TANK MFG, <br />FOR DETAIL Of TANK Si <br />SEE 9 LET F-7.1 <br />PEA GRAVEL <br />BACKFILL <br />. ..... --------- - 4" ALUMrUM PILL TUBE WPO- <br />&RVE SH OFF (eD <br />JJ-----MOhhLOjPROBE TO LOW <br />END OF ANK. 0,97 II <br />SLOPE T.K1 I^ IN 10, <br />END <br />WE 0E1.8 BELOW <br />VERIFY Wl TANK MFG <br />.0aQ <br />-1-711 <br />V AL11r11 1111 11 W/POSTIVE SHUT OFF (I <br />ON, TORI PROBE TO LOW <br />cT <br />END OF allf, 0 <br />II SLOPE TANKI I" IN 10' <br />DOWN TO'WArS FILL END <br />I Lj I <br />SEE DET_ -p <br />VERIFY W1 TANK MFG. <br />10' CLIA. 20,000 GAL FTWRGLASS TAW AND EXCAVATION SECTION (9 <br />FILL TUBE <br />... .............. <br />MAX <br />TOP OF FIBERGLASS OVERLAY <br />STEEL PLATE <br />KM <br />KM <br />FOR DETAIL OF TANK SLAB <br />SEE EE SHEET F-7,1 <br />PEA GRAV <br />CKFJI I <br />;7�: - - - <br />FUNE` <br />TUBE <br />J4� <br />STEEL PLATE <br />MIN <br />1.3 EXCAVATION AND SACKIFILL <br />A. EXCAVATION It ­.xWtod water PaPi of, 'Pi 1. fccauhte,", Immediately C -I the <br />Chevron Mod, for sIIrruction" <br />before ermined" with the --tion, <br />B TANK i SIZE <br />I STABLE SAIL: Size exccotafn perimeter to allow 38" minimum between Lon" <br />- 2 IN <br />of 4 mirmurn between tank side, and Ni cap, and the -11 of the Junk hale, <br />C TANK H Ot C 37E IN UNSTABLE SOIL: <br />I I bit si I. dafirl P. i if. the, 750 lbe,/li IT, co --un, as calculated from an <br />unconfined compression Jeff, w eons .,in an ultimate hearing ,opodly of less than 3,500 <br />bs /Ini Loose send, muck, bog, i swamp or enroll whee soil Is soft we fle,eroPy <br />"s;dared unstable soils <br />2, Size excoation Per meter toallow36" minimum between tonlis and a minirun, of I the tank <br />do' star between the tosides/end cup, and the wait of file itonk 1.1, <br />I Filter fabric 01 be uled to the took hare for FRF lerh . in 'net 6tall, <br />4 per <br />wripi-ent shoring may be used to stabilize the malls of the Junk Iat the discretion of the <br />- <br />ContIAlternate <br />and/0" Chew- Rep en <br />If permanent shoring is used, c41cw 'Stobie Sol' size ,thele., effer to ter -e B.Cl ill Materials% below. <br />D. DEPTH OF TANK HOLE: <br />1, t, blocks ­, Ith <br />hContractor Is r , loanable bw Istatrishing the Lank hole depth, corodenli, g the the of piping <br />to the pump blo, end 1 1 - pipe burial p, wd slope and e fal-ii 1.1fe'la, <br />re at the <br />Bell <br />(Measure pump opening). <br />. FRP: <br />Rp The minimum depth of -ser I, S -i and the maximum is 7-0 <br />E. SAFETY REQUIREMENT: <br />No P- sholl el . tank hde ase -I belp. the 5 ft. deep 1-1 uTl,ss thiswellsw <br />lt e sbui <br />an mil sloped as prescribed by -oat OSHA regulations, No ­wi State orI oad , 'qu ;remwe, <br />that we moo restrictive than Owri spaclflc&;qi are to the adheredto as though spedred In <br />Convorr specifi,ati­ The Contractor 11 reaEwnniplo for, any design, mP t rwlgfs, eguip,wrt, permits, <br />eta, ro,­ sharing or, soe singing a hole. <br />F FILL AND BACKFILL: <br />NJ Ell al materishall be of granular nature, free from vegetatiaa wi extraneous moternol, CT -on <br />Ree. shell nNi pod M- the ­hwel beho,o it in spread, 'Precut material In, lifts mot to -I <br />�.2k,chwst and tamp thoroughly, al <br />ghly, - required by local code, Contractor sholl previde 0 compactiont f' 'e"ficot"' of fit <br />1,4 BALLAST <br />A. MATERIALS <br />Wil is to be PINK! as IT ballast under all conditions she,. ballast 1, required. <br />R [)BY HOL C CONDITION: <br />Tanks, b,,kfgl to hNa of Talks, must hollol If is any rho- that su,foc, w <br />,abliaIoc It oher 01 prier the lank holt <br />to a depth of 2 3" or greeter above the bp!tP,, of the <br />C, IYET HOLE CONDITION: <br />A thenrof to <br />pump wells, from the Lack hoie fa maintain . "Dry Hole C.,dItIPi If -010 he ablaIn <br />a 'Dry Hafe Condition', Chis,,,za, Rep, Is to Gat a, fled and will rhoteml the course <br />of action to be <br />roll -ed. 1-tcAl filler fab ic, t;. -&.P "IN,' and heading .1 soclIed elsewhere. Set Lank in hole, <br />Ballypw with -t, k11 lei " an the bad � Use <br />of slough wnt., to bones tank <br />k until <br />tap <br />of an �niy <br />backfill , u At bmi q top, of tank, fill Junk with water -0 completion of <br />l"T.Il.tico, <br />CAU It Of'- BALLAST LEVEL MUST NEVER EXCEED WATER OR BACKFILL LEVEL IN THE HOLE <br />DCMNC;INSTALLATION, Do not rem- paballastununtillank slab has been poured, Do not set remote <br />pump mato, j,U baflailt fmthe, hot been rXii from tank. <br />1,5 DOUBLE WAIL TRY TAI INSTALLATION: <br />A. MATERIALS: <br />L Double-wall fibInglon, rsierfori Flotilla (FRP) L-9. will. as w,ppl;sd by Chew- we to be <br />irtIpfled by Coltroatior in accaardozi with the, plans and 9o,"Eci 05 supi by <br />'ama'n't <br />Datil ..-Wait <br />Xtru" <br />12,000 24--0 1/4" Looll <br />lo' -0, 00 <br />15,000 28'-5 3/4" L -g <br />101-T O.D. <br />20,(00 37'-8 3/4' L-9 <br />(NOTE: O.D. IS OVER TLE BIDS) 10'-0' 00. <br />2. Other Cont'."'" plisd fupulpmori Included -pp, re,—y (when specified) Phase IAssemblAssemblies:AblAdapter, dust . -d or"etal.t. hadws, Phase 11 Eqlip,snt: Anti-R,rkFP1,t;Vn <br />w,l­ T;9h h ase IrAlmho", nozzle lwfz. no. Ii -it- on L -kink pi swivel 'to,,, claps, <br />1.8 HANDLING OF ERR TANKS: <br />A. RESPONSIBILITY: Pro CIant,orts, is rospiproare ho, off, hadbl, the honks from, the dol fry.chicle. <br />A we- & <br />or backhoe of suffli,lii filling capacity must be used, The welght of the enable fall FRP <br />lank is cpw­m.LI 5000 - 6000 Pounds, <br />B. LIFTING III MOVING: wean lifting wmq�g an FRP Lank, always ase property f,I.d equipment -d <br />,I ft by lifting lug("). On large wife, greaher, than 8' diameter, use a spreader bar to ensure lift angle <br />P I at least 45' 1 each lifting lug. N- c, rdl use copes N, chains wound or, FRP Junk, Sill w, <br />.,.it, ground, free of -he old (wrign i t , <br />EXCEPTION Tank coo be Pld up to 90' w, a smooth efoon w,foce when pawfor,i,,g the "W.- <br />installation pressure Lott <br />C CHOCKING:Tanks we le be chocked in poPe'do,'i with wni sr's until <br />irsody for , mit.11 qUen I windy Canditiane f.Ift i wit expected, anchor I ,IP9 mi,ifirram 1/2' <br />qw, or, homp .of a- seah JiPPk and secure <br />to F.Its of oderluck. ei'lis to p,—k '-wri or <br />the"'i <br />D OPENINGS: All Joni are shipped with dust z. -It i fee plugs In "ooh Dust covers a,. to <br />1-11 in soch Pwn" unlit Andy for the i 0,11,tion pressure test mu.t ho,ka mId ho,e I a <br />out, -Mp w stets Plugs <br />h plot. <br />w a 5 pe, pressure relief volt T, place at all [me, <br />E DAMAGE: <br />1. filepact a11t Forks carefully fail .;gas of damegis uPan receipt, Hot. any damage on the shipping <br />dor,.omects and notify the Chawor, Res, Cantart the fork, -non,fi3Ol,or for additional <br />t""Ok"' <br />2, It the lackIt damaged at any abor line, do not attempt repairsNotify Dewar, Rep, who will <br />crets," ine the az­ of actio,.F SETTING, Set hanks, ow proposal bad with 0 slope downward toward the fill "d of i's tank. A slope <br />w,Tm <br />of 3" dLfc.,L the two Wall", of IT. bk is dilist <br />b�­ and �e, red. I),. cceptabis large of <br />- <br />Mope It 4" c. 2" minimum; with the L'I slid low than <br />-at. Pump fund of the full, <br />To,ks that fuceed the acceptable I or I h at slope d..1 -d to ite remote pump end are <br />Improperly Bel and must z. -F <br />G, INSTALLATION MOTH APPROVED MATERIALS: <br />I Pl,' : a _12"ff <br />boak 11 innerly o ­d the hanks. Push bw*91 completely the tons <br />pst ILI rib. <br />end under the wild folit. P-d- a- be d.. from Fall, or odpii hank too <br />If a man will be In the hole to "wask" the bck'll. Triple must be shored w side sloped as <br />p, esn" bed by current OSHA wilul.tion. <br />2 Place ascw,d 12" lift w ti.1,N] evenly would the Again, "at the '.wlkag" or bockfill <br />between the ribs and under the and i Add backfill I wound the tanks up to the hapt <br />of the tanks. <br />pocfill to wPq,FdI -oil& piping and hi Is compli <br />H, INSTALLATION WITH ALTERNATE MAT.RNILS: All do,ot. matengs must ihi written pv.-I fr- <br />th . tank m ­ the and tIT Cl,-_ 'soriniani <br />1.7 TANK TESTING <br />A. PRE-INSTALLAT)ON [EST SET UP: Pro, to the rompre;nkirtollation test, all .100" prize -t be o -d from the Joint, and the --a, on <br />ul.spore must t-Ihe "i <br />on the annula, space S not Truthatitsr <br />huh, fw the pre alien All -Ultal- last, <br />usl be Performed and recorded can -p -y suppled f,m,. <br />R NOTIFICA TON <br />The, Chew "Rep ' MUST abseI l <br />all hesfe, holy at least 24 hours 1, advance or ony tests <br />C. PRESSURE APPLICATION SYSTEM: <br />The pres-0 application system is to hu -Ne two pressure gauges (,qoga 0 to 10 pill with 5 gel <br />Pt-fe reliefs) in this llystsTT,, troth In good cor-citim and having boon finifed and agiltzi within- <br />. IhrfI,n_ period three-month pod priol h.th. talk test (copy of the test and calsb,otiofurnifurnishedr, data to be furnished to <br />the C, rwao Rep, upon request), <br />USE EXTREME <br />E CARE AROUND AND NEAR THE PRIESSURZFO TANK. Rfie­ the pressurs vice to <br />moYXrg the tank or fwrmov:mg any fittings, <br />N- w"', A the scondwy (ou ler) <br />Fork .1dhj wesaurizing the wYYo,y (n,ci lank first, <br />D. LEAKING TANKS: <br />DO NOT 1 -tat . talk which shows any 0,iden,. of . leak, The Cli Rep is to Ut ratified of any <br />coming. III will datonmirs the course of oche to be followed. <br />E. SCOPE OF WOql <br />The Cont,oct I, ­parli,lbl, for 11 obFu, -t-ol and ,,,EY,wrt ­,wi to conduct the <br />Pl'awl, g tweitz <br />Pr —Installation M­aTn­ Test, Air <br />Atte-Irstallotan Retitle Test, Al, w hydrostatic <br />I SET TANK DEPTH 1P ALLOW PRODUCT, <br />I, VAPOR , AND VENT LINES <br />TO SLOPE 1/4 PER FOOT MIN, DOWN TO TANK. <br />2. CONTRACTOR SHALL VERIFY THAT THE TURBINE HEAD Wi RE 4" TO 6' <br />ABOVE THE TANK BOTTOM, DO NOT INSTALL TURBINE PUMP ASSEMBLY <br />IF IT IS LESS THAN 4' FROM BOTTOM OF TANK <br />3REMOVE SHIPPING PADS FROM TANKS PRIOR 10 INSTALLATION. <br />F ACCEPTABLE "SOAPS": 'Soaping' the tank one fittings during the test is <br />i <br />!�0 be dame using a small <br />go,dorri. hand -pressurized wgy.n1The be a high _m"Q �i. that bubbles <br />-ilylJn -to'twItan Ir leak ,n i,.funk bubble due to dspersing I— he p,,osraalaIoAZI,")kobI�with <br />a,slS.m Irl Concentrate" <br />:A1.Fy I- High Seap <br />#706 Sauthnmd lock Def,fi <br />P <br />equal <br />approved IT <br />G. PRE-INSTAULAON PRESSURE TEST, AIR: F.Itleme cos It to be used around and near the <br />P,wesu,ized honk. NeYs, proti the secondary (outer) lack without prousu,riTi" this primary <br />(;,,,) Junk, <br />I Primary (o-) Talk Two; <br />Tighten ell Lank fittings Li P pressure gauge IT, the -1/mon1hor fittki in the isic-dory <br />(Pular) tank, Local. a second w,ao,,e 9.9e of a Ili in it,. --cy and connatal the .11 <br />pressure hone to MYs same filing, Pressurize the w -w y ( inner) fork 1. . minimum 4 P.J. <br />c.1murn 5 pel Monitor the vii ­e quipas a mllimann of 112 hour, There should be no pre gl <br />kro-sue in the secondary (Outer) lank Sinop oil P,I, ft I i <br />2, Secondary (eri Talk Test:M.I�!.ir, the p,,e-le in the primory Jack, Free the hasp b7, thefitting by Putting the <br />"- <br />on tie. 1t the bar* Into the OPfck 01saol,ent check is (found .1 the top of the -,IF. <br />fitting), This will air to tlol,f, f- the primary to secondary lack, P-lialil. to 5 PSI, <br />- <br />Add w a gIT 40 the supply wLe as needed and aline the pressure to stabilize. Clot, <br />the valve on the test ma,lfAd. DIwc-,oat the as supply N,6. Li the wessivis for we hour, <br />S -P the soli,. arteries <br />ofthe Junk and welch (P, ache air bubbleswhich indicele . leak,Fly I" of fiedy <br />III he,, been discol"I When the air now from the supply <br />Yet. Or complete,ar <br />rsm- the test manifold. <br />TV, - ill test ;, complete, 'elu III, -deque the ol, pressure from the talk by othe sappy <br />H, POST -INSTALLATION PRESSURE TEST, AlTb <br />I Primary (Inner) Twit, Test: Perform this test with PIT Jack risers and fittings 0h.chad, Tighten oll <br />tank fjtI Locale a pressure gouge 0 one of the unnulair spoce moult, fittings 61 the <br />secondary (-ter) talk, [.-.it . o --d pressure gauge with a 5 psi <br />We-,,,elef, to are of <br />the Primary ­) lack fittings and theair­­ h- to this h- fitting. Pr—,i,. <br />a Trinm'm of �,Isl <br />the primary (ir,i lack to I I muY 5 pill), Saw oil lank fittings and <br />monitor the Pressure gauge fair a minimum of 1/2 hour, Thera <br />,, a J a no ve,,,,e in c,,.. in <br />the aundiwy (Dole,) <br />talk. <br />2 5 DI,c.Pn-t the It, supply but maintain the prey"'. ­-duiry (-it,) Tank 1-1, "'. - hha winngy <br />tank, Pressurize the secondary (outer) tank ui a III at, hose men <br />ifold Do,— q prNeur. <br />base from the primary lark to the w,PuIw 4pace moi filling. <br />PrIlssu 'i'e the secondary lack by pi the manifold vole We— the <br />primary and sec.ldiary talk. If bring �Issurapg! both C <br />onks to 0 minimum of 4 psi <br />(maximum - ) by "`_ 'i Ing V. a,, supply . the primary , 'k . <br />klorilP�­e for 1/2 hour and soop all honk filings, riws and ppil, amnectio", )pan <br />Pro, <br />camplii atthe Test, elboare the an wes- 'ram the rec-dwy tank pi to I <br />pressure hem <br />hp, <br />e ,-m y talk i not <br />relieved from the secondly I first. <br />Cq,jF- Bell- all Lack pressure prior to rempilgany fittings, <br />1. POST --INSTALLATION PRESSURE TEST, HYDROSTATIC: No Conk Allot showfl, any evidence of 0 Ifick <br />Is to be kept In the system. Any d""of, incurred to the tonk during the in sollot;w, w1l be contructori <br />re.po,fibility, Th. Che -or, Rep, is to be notified of wry damage and will determine the ­ of <br />Q,t;- to be followed. <br />� <br />f a hydrostatic test is required by a i agency, the controoLonr is to bi the tank fix Testing and <br />ihaow,aii when testing is corri They h0roIl FIJI will be obtained by Chevron, <br />d. I NTERNALMEASUREMENTS Take internal ­-remotadiameter eof the fill old the rempump <br />oPecirge, an both on ale -d double <br />won ERR Conks, The Conto,w, witnessed by the Chowan <br />RFI is fespoleNe for making and roco,ding - a twor, provided by the Ohmi the required <br />b,nri <br />Take the first set f mectu,smt. wiz, I " " or dhe tank The <br />Placing ' bank <br />I set IT I lol-t l enamallA to be telIt, Its b-1,611 hot reached <br />ed `ub9i to pouringto punnets 'Job) <br />If <br />the differ I between two set$ of reodimil, Is grouter than, 1 1/2- atop the job, The Chs- RN, <br />I, to be notified and will determine the course of .,t;- C-1ca the talk manufacturer For fall - <br />;v dw­ <br />st, IILLAIIIN%� i's l-') look i be, 'tuld woorl,ballaii the Junk, Ne,ser (01 the <br />se c qy , id If the wi of,is bollooked i Hydrostatic Test 0,,t -d of <br />d ) lack with a ", <br />the post-n'L.T.tlan .1, test) on <br />the I and fli <br />L ,,MAL DEPTH; The i depth from the top of the Junk to ground level shall be a minimum of 3 <br />feet and a maximum Th <br />ium of 7 e Filling% if a ni I$ used, will be approximately 5 to 6 raht, <br />off the too of the Junk. The spoil be considered fa the acce, of the piping o,nd th,s moy affect the. <br />hank burial depth. <br />M VENENQ \/ant ins onnalm space "ween the primary and arecoodoy took al <br />k only if required by local <br />)J,;sd manifold ",lial Janke )Pd1 connected I <br />ctiw& Venting of the annular spoc. 3 not ree, k ad by ill . Junk If 2 <br />inch <br />h ERE Pipe sholl be manifold the p vent t r1sor. Do not use (he <br />wi—Y (product) tank -t to _t the annular spnce <br />N INTERSTITIAL. MONITOR: A pull string may be in the Jack, Install 0 now put] string if the string I. <br />rrn�t,Umonitorndr,9. lost or bi The pull li Is not a on,, manufacturer warranty Item. Hi the <br />in ielwmonitor at the bottom c-tifr(ine of the `RP tank, Insert fish to" through the erring,sor ,A Tog both the pull string to the probe signal i at 12.5 ft, plws it a burial depth. Attach the <br />pull <br />all rig to the <br />Probe ono to the <br />fish tope and PIT probe rian <br />lank, When the <br />tags The <br />on the signal <br />W <br />,e i I ". Ii X , match, the webs is at the "Her, craterline of the <br />lack, . p0 string Ie <br />'. _on in pec for "I"o on"ai <br />0. iNSTALUNG THE CONTAINMENT SUMP, The containment sump must be wotetignt to prIms,rt <br />liquid Ingress or egress. Frilre,joll Inside and outside of tank calla, <br />P. INSTALLING THE SPILL CONTAINMENT FILLROX: The stall cwhol-pi FLIP— must be liquid tight. <br />Test all fillbo,es by filing with water lar a minimum at we hour. D -e 0ould the no dlev in the <br />water. -4 di this test Do at draw enter Illo the talk <br />1,8 APPROVED IED MATERIALS <br />A, APPROVED BACKFILL MATERIALS: <br />1, PEA GRAVEL: A ilwi naturally rounded ofigevAs filth 0 1/8' mi,rimun, end a 3/4' max inn <br />di -I Up to 5% of the port deo may past through o #8 ss - <br />2, STONE OR (;BAAL CIF"SHINSS: wooled material with <br />a porIde size between 1/8" and 112" Up <br />No to 5% of the poi;tilli m%ytpats whireu� 0 #8 '1 <br />TIE: Apix-d mat <br />a wi be <br />Ic ' I _* and ul-, ii mset ASM C ­?L3, Paragraph 7.1 <br />for <br />qv" ty and loUndpont, The dry go,6 density <br />b . a ni I I -Pro <br />of 95 pound, per autric, 1-t <br />B. TANK HOLE LINER: Corti-tv is to provided a Filter FobriC Tank H pht Lunar hon: <br />1. Tank hale ie un siaal0 Goll, <br />w <br />2 Specified by Chevron Rep, Th, Ys,tiI, Junk hold (ride, -d batt-) 0,0 be F—sal I the <br />fabric with 2 loot <br />NOTE: Bedding <br />mat <br />0 1 IT; al' I_ dow , "logs"scamp. s�s we to be placed wn the top of the filter fabric, <br />f.-TCCSS Fabric of too of the I should ta, folded over the backfill material at eubgrcda I -I <br />C APPROVED FILTER FABRIC MATERIAL: <br />Resoncry Inc,-Typ.l 3�01 w � <br />3341 <br />Phillips Fiber. Carp, - S.Poc YP <br />Hoechst Celanese Corp. - Trsdre S, <br />20 <br />oY fabric ,EIrP_d by the talk manufacturer. <br />F* -P- FWeryflliti "MAL I DATE <br />PREU.NIRY <br />PLANNING <br />ER.DG PERMIT <br />D <br />PERMIT REPS <br />Do not - drawing <br />farurlca"t"It"' <br />'s, Initialed JIM <br />Q-1 <br />w Chevmn <br />FIFICIE)LIii TANI <br />91 AS SHOM DATE: 17NOV198 <br />DR CR AM <br />FM, I <br />q <br />