to
<br />-`7
<br />ct 0
<br />I
<br />MIN.
<br />F, 1 6
<br />FOR WALL OF TANK SLAB
<br />SEE SHEET F-7,1
<br />�_ PEA GRAVEL
<br />BACKFILL
<br />4' M-11MINUM FILL Pill 11"T Ii SHUT OFF 42
<br />MONITOR PROBE TO LOW
<br />END OF TANK 17
<br />SLOPE TANK 1
<br />DOWN TOWARDS END
<br />SEE DET. A BELOW ---7 \ SEE DET,.,_B BELOW
<br />STEEL PLATES UNDER EACH OPIENJNK' '
<br />BY TANK MANUFACTURER 24'_0 1/4 -
<br />VERIFY Wj TANK MFG,
<br />FOR DETAIL Of TANK Si
<br />SEE 9 LET F-7.1
<br />PEA GRAVEL
<br />BACKFILL
<br />. ..... --------- - 4" ALUMrUM PILL TUBE WPO-
<br />&RVE SH OFF (eD
<br />JJ-----MOhhLOjPROBE TO LOW
<br />END OF ANK. 0,97 II
<br />SLOPE T.K1 I^ IN 10,
<br />END
<br />WE 0E1.8 BELOW
<br />VERIFY Wl TANK MFG
<br />.0aQ
<br />-1-711
<br />V AL11r11 1111 11 W/POSTIVE SHUT OFF (I
<br />ON, TORI PROBE TO LOW
<br />cT
<br />END OF allf, 0
<br />II SLOPE TANKI I" IN 10'
<br />DOWN TO'WArS FILL END
<br />I Lj I
<br />SEE DET_ -p
<br />VERIFY W1 TANK MFG.
<br />10' CLIA. 20,000 GAL FTWRGLASS TAW AND EXCAVATION SECTION (9
<br />FILL TUBE
<br />... ..............
<br />MAX
<br />TOP OF FIBERGLASS OVERLAY
<br />STEEL PLATE
<br />KM
<br />KM
<br />FOR DETAIL OF TANK SLAB
<br />SEE EE SHEET F-7,1
<br />PEA GRAV
<br />CKFJI I
<br />;7�: - - -
<br />FUNE`
<br />TUBE
<br />J4�
<br />STEEL PLATE
<br />MIN
<br />1.3 EXCAVATION AND SACKIFILL
<br />A. EXCAVATION It .xWtod water PaPi of, 'Pi 1. fccauhte,", Immediately C -I the
<br />Chevron Mod, for sIIrruction"
<br />before ermined" with the --tion,
<br />B TANK i SIZE
<br />I STABLE SAIL: Size exccotafn perimeter to allow 38" minimum between Lon"
<br />- 2 IN
<br />of 4 mirmurn between tank side, and Ni cap, and the -11 of the Junk hale,
<br />C TANK H Ot C 37E IN UNSTABLE SOIL:
<br />I I bit si I. dafirl P. i if. the, 750 lbe,/li IT, co --un, as calculated from an
<br />unconfined compression Jeff, w eons .,in an ultimate hearing ,opodly of less than 3,500
<br />bs /Ini Loose send, muck, bog, i swamp or enroll whee soil Is soft we fle,eroPy
<br />"s;dared unstable soils
<br />2, Size excoation Per meter toallow36" minimum between tonlis and a minirun, of I the tank
<br />do' star between the tosides/end cup, and the wait of file itonk 1.1,
<br />I Filter fabric 01 be uled to the took hare for FRF lerh . in 'net 6tall,
<br />4 per
<br />wripi-ent shoring may be used to stabilize the malls of the Junk Iat the discretion of the
<br />-
<br />ContIAlternate
<br />and/0" Chew- Rep en
<br />If permanent shoring is used, c41cw 'Stobie Sol' size ,thele., effer to ter -e B.Cl ill Materials% below.
<br />D. DEPTH OF TANK HOLE:
<br />1, t, blocks , Ith
<br />hContractor Is r , loanable bw Istatrishing the Lank hole depth, corodenli, g the the of piping
<br />to the pump blo, end 1 1 - pipe burial p, wd slope and e fal-ii 1.1fe'la,
<br />re at the
<br />Bell
<br />(Measure pump opening).
<br />. FRP:
<br />Rp The minimum depth of -ser I, S -i and the maximum is 7-0
<br />E. SAFETY REQUIREMENT:
<br />No P- sholl el . tank hde ase -I belp. the 5 ft. deep 1-1 uTl,ss thiswellsw
<br />lt e sbui
<br />an mil sloped as prescribed by -oat OSHA regulations, No wi State orI oad , 'qu ;remwe,
<br />that we moo restrictive than Owri spaclflc&;qi are to the adheredto as though spedred In
<br />Convorr specifi,ati The Contractor 11 reaEwnniplo for, any design, mP t rwlgfs, eguip,wrt, permits,
<br />eta, ro, sharing or, soe singing a hole.
<br />F FILL AND BACKFILL:
<br />NJ Ell al materishall be of granular nature, free from vegetatiaa wi extraneous moternol, CT -on
<br />Ree. shell nNi pod M- the hwel beho,o it in spread, 'Precut material In, lifts mot to -I
<br />�.2k,chwst and tamp thoroughly, al
<br />ghly, - required by local code, Contractor sholl previde 0 compactiont f' 'e"ficot"' of fit
<br />1,4 BALLAST
<br />A. MATERIALS
<br />Wil is to be PINK! as IT ballast under all conditions she,. ballast 1, required.
<br />R [)BY HOL C CONDITION:
<br />Tanks, b,,kfgl to hNa of Talks, must hollol If is any rho- that su,foc, w
<br />,abliaIoc It oher 01 prier the lank holt
<br />to a depth of 2 3" or greeter above the bp!tP,, of the
<br />C, IYET HOLE CONDITION:
<br />A thenrof to
<br />pump wells, from the Lack hoie fa maintain . "Dry Hole C.,dItIPi If -010 he ablaIn
<br />a 'Dry Hafe Condition', Chis,,,za, Rep, Is to Gat a, fled and will rhoteml the course
<br />of action to be
<br />roll -ed. 1-tcAl filler fab ic, t;. -&.P "IN,' and heading .1 soclIed elsewhere. Set Lank in hole,
<br />Ballypw with -t, k11 lei " an the bad � Use
<br />of slough wnt., to bones tank
<br />k until
<br />tap
<br />of an �niy
<br />backfill , u At bmi q top, of tank, fill Junk with water -0 completion of
<br />l"T.Il.tico,
<br />CAU It Of'- BALLAST LEVEL MUST NEVER EXCEED WATER OR BACKFILL LEVEL IN THE HOLE
<br />DCMNC;INSTALLATION, Do not rem- paballastununtillank slab has been poured, Do not set remote
<br />pump mato, j,U baflailt fmthe, hot been rXii from tank.
<br />1,5 DOUBLE WAIL TRY TAI INSTALLATION:
<br />A. MATERIALS:
<br />L Double-wall fibInglon, rsierfori Flotilla (FRP) L-9. will. as w,ppl;sd by Chew- we to be
<br />irtIpfled by Coltroatior in accaardozi with the, plans and 9o,"Eci 05 supi by
<br />'ama'n't
<br />Datil ..-Wait
<br />Xtru"
<br />12,000 24--0 1/4" Looll
<br />lo' -0, 00
<br />15,000 28'-5 3/4" L -g
<br />101-T O.D.
<br />20,(00 37'-8 3/4' L-9
<br />(NOTE: O.D. IS OVER TLE BIDS) 10'-0' 00.
<br />2. Other Cont'."'" plisd fupulpmori Included -pp, re,—y (when specified) Phase IAssemblAssemblies:AblAdapter, dust . -d or"etal.t. hadws, Phase 11 Eqlip,snt: Anti-R,rkFP1,t;Vn
<br />w,l T;9h h ase IrAlmho", nozzle lwfz. no. Ii -it- on L -kink pi swivel 'to,,, claps,
<br />1.8 HANDLING OF ERR TANKS:
<br />A. RESPONSIBILITY: Pro CIant,orts, is rospiproare ho, off, hadbl, the honks from, the dol fry.chicle.
<br />A we- &
<br />or backhoe of suffli,lii filling capacity must be used, The welght of the enable fall FRP
<br />lank is cpwm.LI 5000 - 6000 Pounds,
<br />B. LIFTING III MOVING: wean lifting wmq�g an FRP Lank, always ase property f,I.d equipment -d
<br />,I ft by lifting lug("). On large wife, greaher, than 8' diameter, use a spreader bar to ensure lift angle
<br />P I at least 45' 1 each lifting lug. N- c, rdl use copes N, chains wound or, FRP Junk, Sill w,
<br />.,.it, ground, free of -he old (wrign i t ,
<br />EXCEPTION Tank coo be Pld up to 90' w, a smooth efoon w,foce when pawfor,i,,g the "W.-
<br />installation pressure Lott
<br />C CHOCKING:Tanks we le be chocked in poPe'do,'i with wni sr's until
<br />irsody for , mit.11 qUen I windy Canditiane f.Ift i wit expected, anchor I ,IP9 mi,ifirram 1/2'
<br />qw, or, homp .of a- seah JiPPk and secure
<br />to F.Its of oderluck. ei'lis to p,—k '-wri or
<br />the"'i
<br />D OPENINGS: All Joni are shipped with dust z. -It i fee plugs In "ooh Dust covers a,. to
<br />1-11 in soch Pwn" unlit Andy for the i 0,11,tion pressure test mu.t ho,ka mId ho,e I a
<br />out, -Mp w stets Plugs
<br />h plot.
<br />w a 5 pe, pressure relief volt T, place at all [me,
<br />E DAMAGE:
<br />1. filepact a11t Forks carefully fail .;gas of damegis uPan receipt, Hot. any damage on the shipping
<br />dor,.omects and notify the Chawor, Res, Cantart the fork, -non,fi3Ol,or for additional
<br />t""Ok"'
<br />2, It the lackIt damaged at any abor line, do not attempt repairsNotify Dewar, Rep, who will
<br />crets," ine the az of actio,.F SETTING, Set hanks, ow proposal bad with 0 slope downward toward the fill "d of i's tank. A slope
<br />w,Tm
<br />of 3" dLfc.,L the two Wall", of IT. bk is dilist
<br />b� and �e, red. I),. cceptabis large of
<br />-
<br />Mope It 4" c. 2" minimum; with the L'I slid low than
<br />-at. Pump fund of the full,
<br />To,ks that fuceed the acceptable I or I h at slope d..1 -d to ite remote pump end are
<br />Improperly Bel and must z. -F
<br />G, INSTALLATION MOTH APPROVED MATERIALS:
<br />I Pl,' : a _12"ff
<br />boak 11 innerly o d the hanks. Push bw*91 completely the tons
<br />pst ILI rib.
<br />end under the wild folit. P-d- a- be d.. from Fall, or odpii hank too
<br />If a man will be In the hole to "wask" the bck'll. Triple must be shored w side sloped as
<br />p, esn" bed by current OSHA wilul.tion.
<br />2 Place ascw,d 12" lift w ti.1,N] evenly would the Again, "at the '.wlkag" or bockfill
<br />between the ribs and under the and i Add backfill I wound the tanks up to the hapt
<br />of the tanks.
<br />pocfill to wPq,FdI -oil& piping and hi Is compli
<br />H, INSTALLATION WITH ALTERNATE MAT.RNILS: All do,ot. matengs must ihi written pv.-I fr-
<br />th . tank m the and tIT Cl,-_ 'soriniani
<br />1.7 TANK TESTING
<br />A. PRE-INSTALLAT)ON [EST SET UP: Pro, to the rompre;nkirtollation test, all .100" prize -t be o -d from the Joint, and the --a, on
<br />ul.spore must t-Ihe "i
<br />on the annula, space S not Truthatitsr
<br />huh, fw the pre alien All -Ultal- last,
<br />usl be Performed and recorded can -p -y suppled f,m,.
<br />R NOTIFICA TON
<br />The, Chew "Rep ' MUST abseI l
<br />all hesfe, holy at least 24 hours 1, advance or ony tests
<br />C. PRESSURE APPLICATION SYSTEM:
<br />The pres-0 application system is to hu -Ne two pressure gauges (,qoga 0 to 10 pill with 5 gel
<br />Pt-fe reliefs) in this llystsTT,, troth In good cor-citim and having boon finifed and agiltzi within-
<br />. IhrfI,n_ period three-month pod priol h.th. talk test (copy of the test and calsb,otiofurnifurnishedr, data to be furnished to
<br />the C, rwao Rep, upon request),
<br />USE EXTREME
<br />E CARE AROUND AND NEAR THE PRIESSURZFO TANK. Rfie the pressurs vice to
<br />moYXrg the tank or fwrmov:mg any fittings,
<br />N- w"', A the scondwy (ou ler)
<br />Fork .1dhj wesaurizing the wYYo,y (n,ci lank first,
<br />D. LEAKING TANKS:
<br />DO NOT 1 -tat . talk which shows any 0,iden,. of . leak, The Cli Rep is to Ut ratified of any
<br />coming. III will datonmirs the course of oche to be followed.
<br />E. SCOPE OF WOql
<br />The Cont,oct I, parli,lbl, for 11 obFu, -t-ol and ,,,EY,wrt ,wi to conduct the
<br />Pl'awl, g tweitz
<br />Pr —Installation MaTn Test, Air
<br />Atte-Irstallotan Retitle Test, Al, w hydrostatic
<br />I SET TANK DEPTH 1P ALLOW PRODUCT,
<br />I, VAPOR , AND VENT LINES
<br />TO SLOPE 1/4 PER FOOT MIN, DOWN TO TANK.
<br />2. CONTRACTOR SHALL VERIFY THAT THE TURBINE HEAD Wi RE 4" TO 6'
<br />ABOVE THE TANK BOTTOM, DO NOT INSTALL TURBINE PUMP ASSEMBLY
<br />IF IT IS LESS THAN 4' FROM BOTTOM OF TANK
<br />3REMOVE SHIPPING PADS FROM TANKS PRIOR 10 INSTALLATION.
<br />F ACCEPTABLE "SOAPS": 'Soaping' the tank one fittings during the test is
<br />i
<br />!�0 be dame using a small
<br />go,dorri. hand -pressurized wgy.n1The be a high _m"Q �i. that bubbles
<br />-ilylJn -to'twItan Ir leak ,n i,.funk bubble due to dspersing I— he p,,osraalaIoAZI,")kobI�with
<br />a,slS.m Irl Concentrate"
<br />:A1.Fy I- High Seap
<br />#706 Sauthnmd lock Def,fi
<br />P
<br />equal
<br />approved IT
<br />G. PRE-INSTAULAON PRESSURE TEST, AIR: F.Itleme cos It to be used around and near the
<br />P,wesu,ized honk. NeYs, proti the secondary (outer) lack without prousu,riTi" this primary
<br />(;,,,) Junk,
<br />I Primary (o-) Talk Two;
<br />Tighten ell Lank fittings Li P pressure gauge IT, the -1/mon1hor fittki in the isic-dory
<br />(Pular) tank, Local. a second w,ao,,e 9.9e of a Ili in it,. --cy and connatal the .11
<br />pressure hone to MYs same filing, Pressurize the w -w y ( inner) fork 1. . minimum 4 P.J.
<br />c.1murn 5 pel Monitor the vii e quipas a mllimann of 112 hour, There should be no pre gl
<br />kro-sue in the secondary (Outer) lank Sinop oil P,I, ft I i
<br />2, Secondary (eri Talk Test:M.I�!.ir, the p,,e-le in the primory Jack, Free the hasp b7, thefitting by Putting the
<br />"-
<br />on tie. 1t the bar* Into the OPfck 01saol,ent check is (found .1 the top of the -,IF.
<br />fitting), This will air to tlol,f, f- the primary to secondary lack, P-lialil. to 5 PSI,
<br />-
<br />Add w a gIT 40 the supply wLe as needed and aline the pressure to stabilize. Clot,
<br />the valve on the test ma,lfAd. DIwc-,oat the as supply N,6. Li the wessivis for we hour,
<br />S -P the soli,. arteries
<br />ofthe Junk and welch (P, ache air bubbleswhich indicele . leak,Fly I" of fiedy
<br />III he,, been discol"I When the air now from the supply
<br />Yet. Or complete,ar
<br />rsm- the test manifold.
<br />TV, - ill test ;, complete, 'elu III, -deque the ol, pressure from the talk by othe sappy
<br />H, POST -INSTALLATION PRESSURE TEST, AlTb
<br />I Primary (Inner) Twit, Test: Perform this test with PIT Jack risers and fittings 0h.chad, Tighten oll
<br />tank fjtI Locale a pressure gouge 0 one of the unnulair spoce moult, fittings 61 the
<br />secondary (-ter) talk, [.-.it . o --d pressure gauge with a 5 psi
<br />We-,,,elef, to are of
<br />the Primary ) lack fittings and theair h- to this h- fitting. Pr—,i,.
<br />a Trinm'm of �,Isl
<br />the primary (ir,i lack to I I muY 5 pill), Saw oil lank fittings and
<br />monitor the Pressure gauge fair a minimum of 1/2 hour, Thera
<br />,, a J a no ve,,,,e in c,,.. in
<br />the aundiwy (Dole,)
<br />talk.
<br />2 5 DI,c.Pn-t the It, supply but maintain the prey"'. -duiry (-it,) Tank 1-1, "'. - hha winngy
<br />tank, Pressurize the secondary (outer) tank ui a III at, hose men
<br />ifold Do,— q prNeur.
<br />base from the primary lark to the w,PuIw 4pace moi filling.
<br />PrIlssu 'i'e the secondary lack by pi the manifold vole We— the
<br />primary and sec.ldiary talk. If bring �Issurapg! both C
<br />onks to 0 minimum of 4 psi
<br />(maximum - ) by "`_ 'i Ing V. a,, supply . the primary , 'k .
<br />klorilP�e for 1/2 hour and soop all honk filings, riws and ppil, amnectio", )pan
<br />Pro,
<br />camplii atthe Test, elboare the an wes- 'ram the rec-dwy tank pi to I
<br />pressure hem
<br />hp,
<br />e ,-m y talk i not
<br />relieved from the secondly I first.
<br />Cq,jF- Bell- all Lack pressure prior to rempilgany fittings,
<br />1. POST --INSTALLATION PRESSURE TEST, HYDROSTATIC: No Conk Allot showfl, any evidence of 0 Ifick
<br />Is to be kept In the system. Any d""of, incurred to the tonk during the in sollot;w, w1l be contructori
<br />re.po,fibility, Th. Che -or, Rep, is to be notified of wry damage and will determine the of
<br />Q,t;- to be followed.
<br />�
<br />f a hydrostatic test is required by a i agency, the controoLonr is to bi the tank fix Testing and
<br />ihaow,aii when testing is corri They h0roIl FIJI will be obtained by Chevron,
<br />d. I NTERNALMEASUREMENTS Take internal -remotadiameter eof the fill old the rempump
<br />oPecirge, an both on ale -d double
<br />won ERR Conks, The Conto,w, witnessed by the Chowan
<br />RFI is fespoleNe for making and roco,ding - a twor, provided by the Ohmi the required
<br />b,nri
<br />Take the first set f mectu,smt. wiz, I " " or dhe tank The
<br />Placing ' bank
<br />I set IT I lol-t l enamallA to be telIt, Its b-1,611 hot reached
<br />ed `ub9i to pouringto punnets 'Job)
<br />If
<br />the differ I between two set$ of reodimil, Is grouter than, 1 1/2- atop the job, The Chs- RN,
<br />I, to be notified and will determine the course of .,t;- C-1ca the talk manufacturer For fall -
<br />;v dw
<br />st, IILLAIIIN%� i's l-') look i be, 'tuld woorl,ballaii the Junk, Ne,ser (01 the
<br />se c qy , id If the wi of,is bollooked i Hydrostatic Test 0,,t -d of
<br />d ) lack with a ",
<br />the post-n'L.T.tlan .1, test) on
<br />the I and fli
<br />L ,,MAL DEPTH; The i depth from the top of the Junk to ground level shall be a minimum of 3
<br />feet and a maximum Th
<br />ium of 7 e Filling% if a ni I$ used, will be approximately 5 to 6 raht,
<br />off the too of the Junk. The spoil be considered fa the acce, of the piping o,nd th,s moy affect the.
<br />hank burial depth.
<br />M VENENQ \/ant ins onnalm space "ween the primary and arecoodoy took al
<br />k only if required by local
<br />)J,;sd manifold ",lial Janke )Pd1 connected I
<br />ctiw& Venting of the annular spoc. 3 not ree, k ad by ill . Junk If 2
<br />inch
<br />h ERE Pipe sholl be manifold the p vent t r1sor. Do not use (he
<br />wi—Y (product) tank -t to _t the annular spnce
<br />N INTERSTITIAL. MONITOR: A pull string may be in the Jack, Install 0 now put] string if the string I.
<br />rrn�t,Umonitorndr,9. lost or bi The pull li Is not a on,, manufacturer warranty Item. Hi the
<br />in ielwmonitor at the bottom c-tifr(ine of the `RP tank, Insert fish to" through the erring,sor ,A Tog both the pull string to the probe signal i at 12.5 ft, plws it a burial depth. Attach the
<br />pull
<br />all rig to the
<br />Probe ono to the
<br />fish tope and PIT probe rian
<br />lank, When the
<br />tags The
<br />on the signal
<br />W
<br />,e i I ". Ii X , match, the webs is at the "Her, craterline of the
<br />lack, . p0 string Ie
<br />'. _on in pec for "I"o on"ai
<br />0. iNSTALUNG THE CONTAINMENT SUMP, The containment sump must be wotetignt to prIms,rt
<br />liquid Ingress or egress. Frilre,joll Inside and outside of tank calla,
<br />P. INSTALLING THE SPILL CONTAINMENT FILLROX: The stall cwhol-pi FLIP— must be liquid tight.
<br />Test all fillbo,es by filing with water lar a minimum at we hour. D -e 0ould the no dlev in the
<br />water. -4 di this test Do at draw enter Illo the talk
<br />1,8 APPROVED IED MATERIALS
<br />A, APPROVED BACKFILL MATERIALS:
<br />1, PEA GRAVEL: A ilwi naturally rounded ofigevAs filth 0 1/8' mi,rimun, end a 3/4' max inn
<br />di -I Up to 5% of the port deo may past through o #8 ss -
<br />2, STONE OR (;BAAL CIF"SHINSS: wooled material with
<br />a porIde size between 1/8" and 112" Up
<br />No to 5% of the poi;tilli m%ytpats whireu� 0 #8 '1
<br />TIE: Apix-d mat
<br />a wi be
<br />Ic ' I _* and ul-, ii mset ASM C ?L3, Paragraph 7.1
<br />for
<br />qv" ty and loUndpont, The dry go,6 density
<br />b . a ni I I -Pro
<br />of 95 pound, per autric, 1-t
<br />B. TANK HOLE LINER: Corti-tv is to provided a Filter FobriC Tank H pht Lunar hon:
<br />1. Tank hale ie un siaal0 Goll,
<br />w
<br />2 Specified by Chevron Rep, Th, Ys,tiI, Junk hold (ride, -d batt-) 0,0 be F—sal I the
<br />fabric with 2 loot
<br />NOTE: Bedding
<br />mat
<br />0 1 IT; al' I_ dow , "logs"scamp. s�s we to be placed wn the top of the filter fabric,
<br />f.-TCCSS Fabric of too of the I should ta, folded over the backfill material at eubgrcda I -I
<br />C APPROVED FILTER FABRIC MATERIAL:
<br />Resoncry Inc,-Typ.l 3�01 w �
<br />3341
<br />Phillips Fiber. Carp, - S.Poc YP
<br />Hoechst Celanese Corp. - Trsdre S,
<br />20
<br />oY fabric ,EIrP_d by the talk manufacturer.
<br />F* -P- FWeryflliti "MAL I DATE
<br />PREU.NIRY
<br />PLANNING
<br />ER.DG PERMIT
<br />D
<br />PERMIT REPS
<br />Do not - drawing
<br />farurlca"t"It"'
<br />'s, Initialed JIM
<br />Q-1
<br />w Chevmn
<br />FIFICIE)LIii TANI
<br />91 AS SHOM DATE: 17NOV198
<br />DR CR AM
<br />FM, I
<br />q
<br />
|