Laserfiche WebLink
an <br />O <br />NOTE:SOLAPON DOOTIS NOT REOLIFIED IF THE FLEX CONNECTOR <br />S LOCATED INSIDE A CONTAINMENT RJAIR <br />4' RISER 11 2- 5CH. AD ERR BELL X <br />871 T THREADED FEMALE COUPLING <br />SCIL-ATION BOOT - <br />FLEX CONNECTOR 2" FSP <br />45' ELBOW <br />4" EXTRACTOR FITTING 39 A' <br />2- FRP D�O <br />71A <br />1,- 3' X 2* FRP <br />P <br />REDUCER <br />TEE EDUCER TEE <br />3" FRP <br />SUPREME UNLEADED <br />4 PHASE 0 VAPOR LINE CONNECTI <br />NO SCALE <br />SEAL CO <br />ENTRY BOOT NNECTION <br />TO CONTAINMENT SUMP <br />FLEXIBLE ENTRY BOOT <br />STAINLESS STEEL <br />CLAMP . .... . . . . ............. <br />SERRATED <br />FLANGED NU7 <br />(T',T1 ).-., <br />PIPE OR <br />CONI ><m�GGMIIIESSION <br />RING <br />SCH 40 ERR BELL X <br />INTERIOR OF %.IMP <br />3' MINIMUM INSERPON <br />i <br />WALL <br />I USING COMPRESSION RING ASA GUIDE, DRILL PIPE/CONI <br />HOkE AND DOI <br />HOLES THROUGHSUMP WALL PER TABLE BELOW, <br />BUILDING OR BULCING COLUMNS <br />2. ASSf.M9i PARTS AS SHOWN ADOW_ UNIFORMLY <br />TIGHTEN ALL BOLTS & <br />STAINLESS STEEL CLAMP TO 6a_ALa$, TONGUE <br />I <br />FLEXIBLEPIPE/CONDUIT <br />HOLD SAW DOLT HOLE <br />ENTRY BOOTNORMAL SIZESIZEI <br />SIZE <br />F,83075 3/4". CONDUIT <br />3 5/16: <br />I M 31 GO 0 C04[XJIT <br />3" 5/16 <br />FEB 6200 2'0 FRP RIPE <br />4 1/2- 5/16-0 <br />FEB6300 3"0 FRP PIPE <br />4 1/2- 5/16-. <br />Ni <br />14 SUMP AND KNETRATIONS OF SUMP SHALL BE WATER TIGHT. <br />2, U%. M ASTIC TO ENSURE PENETRATIONS OF SUMP SHALL BE <br />WATER TICI­IT. <br />7 SLW ENTRY DETACY06) <br />NO SCALE <br />NOITi ISOLATION SOOT IS NOT REQUIRED IF THE FLEX CONNECTOR <br />$ I <br />LOCATED INSIDE A CONTAINMENT SUMP. <br />_3 <br />NO SCALE <br />NO SCALE <br />NOTE: ISOLATON BOOT IS NOT REQUIRED IF THE FLEX CONNECTOR <br />S LOCATED INSIDE <br />IN <br />E A CONTAINMENT <br />SUMP. <br />-----BOLTS HOLD FITTING <br />3' SECONDARY PIPE'--- <br />TOGETHER WHILE <br />SCH 40 ERR BELL X <br />4"-----4' <br />2' SCH, 40 ERR BELL X <br />3' MINIMUM INSERPON <br />i <br />OF RISERS AND/OR <br />RISER THREADED FEMALE COUPLING <br />Ii �7 <br />THREADED FEMALE COUPLING, <br />DETAIL <br />BUILDING OR BULCING COLUMNS <br />81 <br />ISOLATION FOOT <br />�, <br />I <br />GGEATKXq BOOT SLOPE DOWN TO TANK <br />FLEX CONNECTOR ... .... ... . -7" FRFI <br />011 45' ELBOW <br />AS REQUIRED BY LOCAL CODE, <br />FLEX CONNECTOR 1/4' PER FL M�1 <br />I/CBcwl, BUTT <br />AAELD-SMOOTH. .. . <br />........ <br />4" BE) TLA3E FRAME <br />WWI <br />PAINT DARK GREY <br />/---I' <br />4" EXTRACTOR FITTING 3 <br />2 FRP��6) 45' <br />' <br />GY- 210 <br />OR FlTTING( <br />4- EXTRACT. FITTING <> III 11F ELBOW <br />---_....._-3' FRPR <br />X <br />REDUCER TFE <br />GALVANIZED PIPES <br />3' FRP <br />PLUS UNLEADED <br />(PRIMED AND WRAPPED <br />REC"LAR UNLEADQQ <br />PHASE I VAPOR LINE CONNECTION <br />PHASE N VAPOR LINE (XXMCTK)N <br />NO SCALE <br />PAINTDARKGREY <br />-----BOLTS HOLD FITTING <br />3' SECONDARY PIPE'--- <br />TOGETHER WHILE <br />k <br />RESIN CURES. <br />3' MINIMUM INSERPON <br />i <br />OF RISERS AND/OR <br />DH <br />APPLY ADHESIVE TO FLANGE <br />OF CONTAINMENT PIPE <br />DETAIL <br />BUILDING OR BULCING COLUMNS <br />ABOVE <br />INTO CONTAINMENT <br />�, <br />I <br />FITT,NG REOUIRED <br />AS REQUIRED BY LOCAL CODE, <br />2' PRIMARY PIPE TO <br />BE TESTED PRIOR TO <br />SEALING SECONDARY <br />PIPE.------_.._..._.__.__ <br />CONTAINMENT RTTINQ <br />SLOPE PIPING TOWARD <br />UNDERGROUND FUEL <br />STORAGE TANKS AT <br />1/4" <br />/4 " PER FOOT MINIMUM, <br />112' MINIMUM CLEARANCE BETWEEN <br />!AM SHELL FITTINGS (TYR ) <br />3* F.W.P. 4F El -L <br />3" F.R.P. NIPPLE <br />3' F R P, TEE. <br />3" F R P. PIPE (TYR <br />NgTE <br />ALL CROSS Qf`­R PIPING TO BE <br />MADE WITH TEE (OR 90' ELL), <br />SHORT NIPPLE AND 45' ELL <br />1 PIPE TRENCH DETAL <br />NO SCALE � <br />NO <br />2"M GALVANIZED THREADED <br />FEMALE COUPLING, PROVED <br />& WRAPPED BELOW GRADE ---- <br />2"0 GALVANIZED FIRE. PRIMED <br />& WRAPPED BELOW GRACE -- -- <br />TAP A TEST PORT IN ONE VENT LINE <br />FOR BACK PRESSURE TESTING <br />2".24' FLEX CONNECTOR <br />WITHIN CONTAINMENT BOOT <br />TERMINATE BE[ <br />. -OW GRACE' <br />2' FRP WIN I <br />PIPE TO TANK qP) <br />91 <br />NQ -TL - <br />I USE PIPE SUPPORT EVERY R -O' 0,C. <br />VENT RISER <br />CONCRETE Ca <br />PIPE COUPLING (TYP <br />CCXpC COLLAR <br />FLU15.14 W/YARD <br />9 <br />12' 0 CONCRETE <br />NO SCALE <br />OVERALL NVENSIC14 <br />DETERMINED BY NUMBER <br />OF RISERS AND/OR <br />��SCIE <br />LOCAL. CODE <br />DETAIL <br />BUILDING OR BULCING COLUMNS <br />ABOVE <br />. ......... <br />PRESSURE VACUUM VALVE <br />AS REQUIRED BY LOCAL CODE, <br />I/CBcwl, BUTT <br />AAELD-SMOOTH. .. . <br />........ <br />4" BE) TLA3E FRAME <br />PAINT DARK GREY <br />GY- 210 <br />- ----- <br />2" 0 SCH, 40 <br />GALVANIZED PIPES <br />(PRIMED AND WRAPPED <br />BELOWGRACE) <br />PAINTDARKGREY <br />CY_ 210 <br />r <br />GALVANIZED <br />TYR <br />tN <br />I <br />PIPE COUPLING (TYP <br />CCXpC COLLAR <br />FLU15.14 W/YARD <br />9 <br />12' 0 CONCRETE <br />DOTING, SLOPE <br />AT TCP (TYP)- <br />��SCIE <br />DO NOT LOCATE: VENT RISERS WITHIN: <br />DETAIL <br />BUILDING OR BULCING COLUMNS <br />ABOVE <br />3'-0` OF NEON ELECTRODES DR XTI <br />NCON BOX <br />51- 0Or ` t_E <br />EL. CTRGRS OR ELECTRIC SIGNS <br />25'-0" O' EVAPORATOR COOLERS OR HEATER FLUES <br />CONCRETE <br />COLLAR <br />FASTEN VENT <br />RISERS SECURELY <br />70 FRAME WITH <br />FRE -FORMED <br />UNISTPUT BRACKETS. <br />SPWnCATIC,NS <br />2,1F9_ R5ENf <br />&VAPOR RF.CCVERY PIPING mm -..- <br />A. PIPING: <br />1, Steel pipe; (Goi or Block Iran) <br />1,Id,,Ie 40 (ASTM A-120) Steel Rips <br />,5cl# Railroad Unions <br />1 <br />5C ff Mall,.NW 1,R, FRU q. <br />B, HAN DUNG OF PIPE& FITIINGSi <br />All Biting Lratafl,tlors "I conform to pipe monufoot-'s speciBcotlons, Red Installation gld,,fimas. <br />1, Fit>arglosa pip.: Protect agal,0 abi,esio, from sharp or hard abject,; ii damage flunn <br />-wma, aL-ge, transporting, Yung - b­kfifII,q all p;,a for d-rog, Prior to usinghthe piping SO am <br />2. Steel <br />pips <br />I " and filling. Protect agi,,t domm9a to if,, p- - <br />Le,11 <br />22 INSTALLATION REDU;REMENTS: <br />A LAYING OF PIPE <br />1, Into,[., sur . of all pipe and oiling, must be free from dirt, scale, meal, 111b,"91.. p.'U'l." <br />ate., <br />, Net- c-, "Frg <br />2 Do not support pp1mg with foreign btb)-,Lq, such 's scrap, of wood, pipe, at,, Use Che'ain approved <br />piping support <br />B. CUTTING OF PIPE: <br />1. Cut pipe to on "'o 0 square cul and. Cut pipe and must be within 1/5, of square. <br />C, TAPERING Its REAMING: <br />1. Fib"91c. tapered Pipe: all cut ends must N. taped pew pipe m <br />mpfProtectprfw. Protect pit. during Lopering <br />to pre,ent damage to pipe, The finish toper shot] be smooth, clean""as from sur!o.0 <br />dafoc�w The length of toper ran 2' diameter pipe 1, 1 5/8" .,d to; 03ill,elHo, P; pe. , 1 3/4* F., <br />otnor size <br />P Tre. FT -It pipe <br />2. S pipe ds arc <br />to be 'c.'ad pan hd-Xt'Y s!"do". <br />D BONDING & ADHESIVE SYSTEMS (F,tusi Pipe): <br />1. All fbarginta pipe surfoces to " bonded seat be cleaned with spent es aupplied by pip. <br />monufochu- pressureApppressureM <br />ro until MCCh;CQI looK is ach-al leBock o,lol pressure -,hpud be <br />maintained an oil previously assa,TbIad joints to reduce the chance of separation. <br />2. Fsp - t of I fittings For .1;9"emt and pusssbl, 'back I' at L. jorhW <br />3 Fal a p ip, unmufa to , or � recorrmandaUces - -0 time before distp,b,rg joint% or tasting,if It is orticlmled that the torriperotu,6 shl drop below70' In (16' C) 0 any it,e during the <br />cu,;,g P,-.-, treat h.1f be applied to It. joints, Only chemical or pectrical d.,i... <br />-ann,ended by ;too mdru(oclu-er oraacceptidae for this purpose, No poen flame or sparking <br />duces .,a to be used. <br />E, THREADED JOINTS <br />Threaded pints must be reamed and h- clam cut perfect threads and be mode up with non - <br />h <br />o, deo" joint Jp­d ­IuIoe In petroleum products E, <br />mp-c! by Cl -on Rep, DO NOT USE <br />ADHESIVE FOR ADED CONNECTIONS. <br />Approved joint compoundr <br />HI -mo thread ecol-L r,Rw to A.O.SmIth b,,lotn - 04510, <br />sal <br />Permute. 51-D <br />an app-,oct "qualf <br />F. RRERGI.ASq TO STEEL PIPE CONNECTIONS: <br />Fiborgloss thre,dd.d and adopt" one to bus threaded I the ate,] plPs or flttinq bates banding onto <br />the Nberjani pipe Use moll and fiberglass Filing ween connection to II can nae tore, All <br />flexible conn eciws We mole; 1.i,11 by female. The foci d10 -,-is to the, Lbenifse piping <br />DO NOT USE ADHESIVE FOR THREADED CONNECTIONS, <br />S SPECIAL FITTINGS: <br />Position the wive - that the Ilna felt PaTt plug W call-PNI, <br />H PIPE WRAPPING: <br />Wrapping moterledshoebe (2) layers of 20 pro polyethylene tape 'Pdyken 930' manufoctured by the <br />Keedult C-pany ( or equal .�p­d by Cf -an Rap) *up R -I c aehall be one -holt <br />width of <br />wrapping <br />rm.Her,idi Map 1 1/2" and 2 fitting. will, Pdysen 900 (12 ni .tIN 6A a-Im. In difficult R­ <br />PRI,ka., 931 ren be used before -olpong with P.lyk,T, goo Rd- shot be Poykwn 327 (above <br />40' F.) of, Palyen 919 (aba,W 10' F ) <br />E.,aptl­ Do not .,,p the union at the -.Le pump and FRP prp./n,. connector ­th,.HmA <br />L SETTING A, BEDDING PIPE: <br />1, P;piki shop be pieced an prepared bad In such .manner as tomlnimi,. point. of which -W pips <br />may cross - mother pipe,, At points Where pii must crossoar, a minimum of 4 Yncibi <br />must -",at. the plipal <br />2, Wi piping is placed on the bed, Proceed to "First Test" (below) vien­ to tbackfflimq trenches. <br />CLEANING SOLVENTS R-.,. my R-,,ulct;- or IBM of pipe cleaning sal W,ta on <br />in . lankmmedictefy with a cleancloth, After the piping I. a- plate. nV.ci the containment eu mp <br />und other rbitcum points for piping clacining sol -La Contractor w111 be responsible for any <br />don, age to tank -ItIng from a, occumulation of pipe cJe­I,q spI <br />K REPAIR Of PIPING: Any damaged along must be relooced, Rep' IT of piping U.19 paid cut maj <br />sec Urn I pipe is not --I c" If pop -d by Ch -on Rep , ,.Pon using rroru,nrt�ua, eupiol;Id <br />P'. lilting. no Procedures is acceptable.I lo <br />acceptable. RIpe 1CqLI has complete!wsting using Procedure. <br />below. <br />L. SECONDARY CONTAINMENT FITTINGS: T.o piece fittling, rawl,o .,. direel- than no," poll <br />and spigot pot., Two 7/16* wrenchesar a -lable tonque impact an& is epajhi to LIqHWh the <br />ftting., Mope sura odhesi- all gap. batty -.n pipe ends -6 rifling -IiIis, <br />FLEX CONNECTOR BOOTS; <br />Encase .11 Be. - ot<8 <br />in an Isolation Neat h Wh ab conloot with set or b.ckflll mota,ldl Moverk <br />the ad, ch be to inspect and left all prim myplping old i ,-,act.,, <br />2.3 TEST INGOF PIPING: <br />A. Nol,�y the Cps' on Palo observeW <br />, who MUST ats0 of (e -1, <br />at . 24 hours In ad, ­ m <br />. of y test,, <br />Can r odes to courdl.oLI testing with local inspectors ted Cham RIP, <br />R RESPONSIBILITY: <br />TheContractsIs responsible to, all lobar, material, and .9alipment to i,omj,di pr. ,e feel. (oil <br />or hydrostatic) at all product, vent no v, r,cavery piping, <br />C. TESTING DCAATIDIDonot deviate <br />hom the following testing procedure. <br />Perform b(N,not. <br />,a, Uq procedproceduresoc"'leproceduresrequired by lead "speat"P attar <br />tests cP a and documented. <br />H, FIRST TEST (Prip, To Book Thing Pipe Trenches): <br />0o at connect <br />pining to tank., ,emote pump. or diapen- Do not -I of Tet.11 ser-mckey <br />Ponfirin-t citing. 11' primary piping W tested, Test the .nUn, piping system, Id. , Product, <br />_t .. -p or (wheys opplifohl,) m ne-d-o. with the folio Wing Procedure <br />F. Step Or.: Install paf.,W opplFation system that raludew two Ve-t gauges (15 p.4 <br />-krum) Aploy 10 pal vaseuro to each piping system. Spap all pints using oppreYed sono <br />solution, Carefully olb-I, each Pint for Odence of leaks.b step Fee: Protect <br />rot- Ia,- on -al piping systems to � tested to W-0 emumen, moose -by, <br />.Lo, From -to" presetur. mV allow <br />Per -mum), Apply 75 p,1 press- to a.o"t- that "IFda. two lesslu'. Q.9I. (150 <br />r p0mg system, hod la, minute,a milu, relatse <br />p,aa-.. Repool, fo, fl. 0- <br />p. Step Tt-lbRecent Step -Is <br />Record oIt test <br />resull.1 m Chevron 4upI forms Cheneon fl app-ol 11 re,ked. After <br />obtaining such d,,Wd, the ContnuaLP, sholl ",krill Han,has to bQ,.fi folp.ilg the <br />'" u conerts of Dival.n 13, 1-h- 1.3. <br />2 SECOND TEST (After sapling secondary piping): Apply 10 psi 10 the awYmdary containment <br />li Spop all joint$ -1,9 approved ,cap ­10ons. <br />3 THIRD TEST tAQv con -Ung pipingto Larks but <br />pi­ pylar to bockfill,q): Apply 45 psi p,,air <br />("a not anueed 50 psi) to test system, Keep pr­ra an oP lines until bockfill1i Is completed <br />Th a, W should be no pressure loss during the remolinca, of constbt;m <br />4. FOURTH TEST (Af(w, Bookfilling and Petah Pang): Applies to prpdu,.t Ince otter Nockfit and <br />patching of concrete Islands, sate, and Yard cokg has been completed <br />D. <br />TESTING EOUIPMENT; <br />OILIPMENT1 <br />Teat limes "Irg Ed tria Tile Hyd-tWo Lima Testing equipment a, Rpi equal. ("he,- Rep. to <br />designate test fluid Test fIvid sholl be call product, crese? 'Fal an hetor, <br />or, ConVoctor to -ply <br />fully f,Lh the Pr -I&,. Von -1 for the Ov-nt;ce of Line Taster <br />17L pressure � r 150R) for 0 remote pump <br />shall <br />be 50 psi <br />maximum (1 5 times operating p""' <br />wit in do 00 Nb t , W of 0010 g.IZAI. <br />E. VENT L' RES (no Phom �%=e 'recaTner y): <br />Unless rfeca, ,ad by local agency, no --c! test roq,ka.d <br />-N, LINES AND VAPOR RECOVERY PIPING term, phase If vapor roc -y); <br />Cont, <br />coNe I a ­R-fibl. for -t and rodr r.movy piping system, posting my [-try imposed <br />test "r,wern"te <br />NEW <br />HAMMER AND HOLMAN <br />SI <br />TOCKTON, CA, <br />PRELIMINARY <br />PLANi <br />STEEL BID <br />REhIBAL teD <br />Do not use Ora. ng <br />In It of od KMI CSR.T15 InEVOSINIDINIS <br />PRODUCT VAKA AND VENT PPII NARD) <br />. .. ..... .. . <br />Chevron <br />Ell(i 1 0201 <br />- --- - -- - - ------_---- <br />BIC-Fr <br />F-4 <br />0 <br />