Laserfiche WebLink
GENERAL CONDITIONS: <br />1. NO WORK SHALL COMMENCE BEFORE OR UNTIL G.C. HAS <br />RETURNED A SIGNED CONSTRUCTION CONTRACT ISSUED BY <br />ARCO AUTHORIZING SUCH WORK. <br />2. THE INSTRUCTIONS STATED WITHIN THIS SUPPLEMENTAL <br />CONDITIONS SECTION SHALL SUPERSEDE ALL OTHER NOTES, <br />DRAWINGS AND SPECIFICATIONS EXCEPT WHEN PROHIBITED <br />BY LAW. IF THERE IS ANY DOUBT AS TO THE INTENT OF <br />THESE INSTRUCTIONS OR IF THERE ARE ANY <br />DISCREPANCIES IN THE PLANS AND/OR SPECIFICATIONS <br />WHICH MAY AFFECT INITIAL BID CONSIDERATIONS, G.C. <br />MUST CONTACT THE ARCO ENGINEER FOR CLARIFICATION. <br />3. THE GENERAL CONTRACTOR SHALL PROVIDE EACH <br />SUBCONTRACTOR WITH A COMPLETE SET OF PLANS, THESE <br />SUPPLEMENTAL CONDITIONS, THE "STANDARD <br />SPECIFICATIONS FOR WOOD FRAME CONSTRUCTIONS', AND <br />ANY ADDITIONAL DRAWINGS OR INFORMATION PROVIDED AS <br />DOCUMENTATION FOR THIS PROJECT. INSTRUCTIONS FOR <br />THE NECESSARY WORK ARE INCLUDED THROUGHOUT THE BID <br />DRAWINGS. YOU, AS THE GENERAL CONTRACTOR, ARE <br />RESPONSIBLE FOR INSURING A COMPLETE PROJECT. THE <br />SPECIFICATIONS SENT WITH THIS BID PACKAGE SHALL BE <br />THE ONLY SPECIFICATIONS USED. DO NOT SEND OUTDATED <br />COPIES OF THE SPECIFICATIONS. <br />4. ALL INSTALLATIONS AND CONSTRUCTION ARE TO BE IN <br />ACCORDANCE WITH ALL LOCAL, STATE AND FEDERAL <br />REGULATIONS INCLUDING, BUT NOT LIMITED TO "OSHA <br />FEDERAL REGULATIONS: LABOR 29: PART 1926". <br />5. THE GENERAL CONTRACTOR SHALL FURNISH ALL LABOR, <br />MATERIALS AND EQUIPMENT NECESSARY TO COMPLETE THE <br />WORK INDICATED BY THE DRAWINGS AND SPECIFICATIONS. <br />ALL PHASES OF THE CONSTRUCTION NECESSARY FOR THE <br />COMPLETION OF THIS PROJECT ARE THE RESPONSIBILITY <br />OF THE GENERAL CONTRACTOR, EXCEPT WHERE EXPLICITLY <br />NOTED AS PROVIDED BY OWNER, OR OTHERS. AS A STRICT <br />RULE, IF IT IS NOT NOTED AS "FURNISHED BY OWNER" OR <br />"FURNISHED BY OTHERS", IT IS THE GENERAL <br />CONTRACTOR'S RESPONSIBILITY TO FURNISH AND INSTALL <br />THE MATERIALS AND/OR EQUIPMENT NECESSARY FOR A <br />COMPLETE INSTALLATION. <br />THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE <br />INSTALLATION OF ALL OWNER AND/OR DEALER FURNISHED <br />EQUIPMENT AND ALL ITEMS NOTED AS "FURNISHED BY <br />OTHERS INSTALLED BY THE GENERAL CONTRACTOR". <br />6. G.C. WILL BE RESPONSIBLE FOR THE ITEMS NOTED IN <br />THESE SUPPLEMENTAL CONDITIONS. THESE NOTATIONS ARE <br />MADE HEREIN ONLY FOR THE PURPOSE OF CLARIFICATION <br />AND ARE NOT INTENDED TO BE A COMPLETE SCOPE OF <br />WORK BUT IS TO BE USED WITH THE "GENERAL SCOPE OF <br />WORKx OUTLINED IN THE PLANS AND ON THE <br />SPECIFICATION DOCUMENTS REFERRED TO ABOVE, <br />7. G.C. IS EXPECTED TO INSPECT THE SITE FOR EXISTING <br />CONDITIONS AND TO MAKE ALL NECESSARY PROVISIONS FOR <br />ACCOMPLISHING THE WORK CALLED FOR. ALL <br />DISCREPANCIES BETWEEN THE PLANS AND EXISTING <br />CONDITIONS ARE TO BE ADDRESSED DURING THE BIDDING <br />PHASE OR PRIOR TO THE START OF CONSTRUCTION. NO <br />EXTRAS WILL BE CONSIDERED DUE TO FAILURE OF THE <br />GENERAL CONTRACTOR TO INSPECT THE SITE PRIOR TO <br />FURNISHING THEIR BID QUOTES OR PRIOR TO FINALIZING <br />THE CONTRACT FOR CONSTRUCTION. <br />8. G.C. WILL BE EXPECTED TO SPECIFICALLY IDENTIFY ANY <br />ITEMS SHOWN ON THE PLANS WHICH HE IS UNABLE TO <br />INCLUDE IN HIS BID PRICE. OTHERWISE, IF IT IS ON <br />THE BID SET OF PLANS, G.C. WILL BE HELD RESPONSIBLE <br />FOR COMPLETING THE PROJECT WITHOUT ANY CHANGE <br />ORDERS. <br />9. G.C. WILL UNDER NO CIRCUMSTANCES PERFORM "EXTRA <br />WORK WHICH WILL CONSTITUTE EXTRA CHARGES WITHOUT <br />PRIOR APPROVAL FROM ARCO OR ARCO'S REPRESENTATIVE. <br />G.C. WILL PROVIDE ARCO OR ARCO'S REPRESENTATIVE <br />WITH SCOPE OF WORK AND COST ESTIMATE TO PROVIDE <br />SUCH "EXTRA WORK; ARCO OR ARCO'S REPRESENTATIVE <br />WILL RESPOND EXPEDITIOUSLY SO AS NOT TO CAUSE UNDUE <br />DELAYS IN THE PROJECT SCHEDULE. EXTRA CHARGES NOT <br />APPROVED BEFOREHAND, IN WRITING, WILL NOT BE PAID. <br />10. GENERAL CONTRACTOR WILL BE RESPONSIBLE FOR <br />COORDINATION OF ALL WORK ON THIS PROJECT. GENERAL <br />CONTRACTOR WILL PROVIDE AN ON-SITE CONSTRUCTION <br />SUPERVISOR RESPONSIBLE FOR OVERSEEING ALL OF THE <br />WORK TO BE PERFORMED UNDER THIS CONTRACT FOR THE <br />EXPRESS PURPOSE OF ENSURING THE TIMELY PERFORMANCE <br />OF ALL SUBCONTRACTOR WORK AND UTILITY CONNECTIONS <br />WITH THE ULTIMATE GOAL OF COMPLETING THE JOB IN THE <br />MOST TIME AND COST EFFICIENT MANNER. ARCO'S <br />CONTRACT WILL SPECIFY THE COMPLETION TIME OF THIS <br />PROJECT AS 45 WORKING DAYS, THEREFORE, G.C. IS <br />RESPONSIBLE FOR FURNISHING A CONSTRUCTION SCHEDULE <br />(EITHER A BAR GRAPH OR CRITICAL PATH FLOW CHART) TO <br />ARCO WITHIN 2 WEEKS OF THE BID AWARD WHICH ASSURES <br />THAT THIS SCHEDULE CAN BE MET. <br />11. ARCO'S CONSTRUCTION SCHEDULE DEMANDS EXTREME <br />ATTENTION TO DETAIL AND THE UTMOST COOPERATION FROM <br />ALL CONTRACTORS. THEREFORE, G.C. MUST PROVIDE <br />ABSOLUTE ASSURANCE OF HIS ABILITY TO SUCCESSFULLY <br />COMPLETE THIS PROJECT WITHIN THE AGREED SCHEDULE <br />REGARDLESS OF HOLIDAYS, INCLEMENT WEATHER, AND/OR <br />UNCOOPERATIVE INSPECTORS. <br />GENERAL CONTRACTOR IS EXPECTED TO BE A <br />KNOWLEDGEABLE, EXPERIENCED CONTRACTOR WITH PRIOR <br />KNOWLEDGE OF SERVICE STATION/CONVENIENCE STORE <br />CONSTRUCTION. ALL PHASES" OF THIS CONSTRUCTION <br />SHOULD BE INCLUDED IN YOUR BID, WHETHER LISTED IN <br />THESE- CONDITIONS OR NOT. THERE WILL BE NO EXTRAS <br />PAID AT JOB'S COMPLETION UNLESS THERE IS A TOTALLY <br />UNFORESEEN AND URGENT NEED WHICH MUST FIRST BE <br />BROUGHT TO THE ATTENTION -OF ,THE ARCO ENGINEER AND <br />SUBMITTED FOR MANAGEMENT'S APPROVAL. <br />12. ARCO MAY REQUIRE THE G.C. TO FURNISH A PERFORMANCE <br />BOND IN THE AMOUNT OF THE CONTRACT PER SECTION <br />0700;PARAGRAPH 6 OF THE STANDARD CONSTRUCTION <br />CONTRACT CLAUSES, SUCH BOND WOULD BE AT ARCO'S <br />EXPENSE AND SHOULD NOT BE INCLUDED IN G.C.'S BID. <br />13. CONTRACTOR SHALL PROVIDE TEMPORARY FACILITIES FOR <br />SEWERAGE AND TRASH CONTAINMENT AND SHALL ARRANGE <br />AND PAY FOR TEMPORARY POWER, TELEPHONE, AND WATER <br />DURING CONSTRUCTION, COSTS OF THE ABOVE SHALL BE <br />INCORPORATED INTO THE CONTRACTOR'S BID. FAILURE TO <br />PROVIDE THE NECESSARY FACILITIES AND UTILITIES WILL <br />CAUSE A DELAY IN FINAL PAYMENT UNTIL ALL CHARGES <br />- ARE RECONCILED. <br />14. G.C. WILL SUBMIT A LIST TO THE ARCO ENGINEER AT THE <br />BEGINNING OF THE JOB OF ALL SUBCONTRACTORS AND <br />MAJOR SUPPLIERS (WHO SUPPLY AT LEAST $2500 WORTH OF <br />MATERIALS) TO BE USED ON THIS PROJECT. ANY CHANGES <br />TO THIS LIST ONCE CONSTRUCTION HAS STARTED WILL <br />ALSO BE SUBMITTED. <br />15. THE G.C. SHALL PROVIDE BOTH PHONE AND FAX MACHINES <br />AT THE JOB SITE AND SHALL FAX ARCO ALL EQUIPMENT <br />RECEIPTS AS SOON AS RECEIVED, <br />16. THE G.C. SHALL PROVIDE STORAGE UNIT FOR DEALER <br />EQUIPMENT ON-SITE AND LABOR TO RELOCATE EQUIPMENT. <br />17. THE G.C. IS RESPONSIBLE FOR MAINTAINING A MINIMUM <br />SIX-FOOT HIGH CHAIN LINK FENCE AROUND THE ENTIRE <br />SITE TO PREVENT ACCESS BY ANY UNAUTHORIZED PERSONS. <br />18. G.C. IS TO STAFF THE JOB WITH A MINIMUM OF FOUR (4) <br />PERSONS NOT INCLUDING SUBCONTRACTORS, WORK IS TO <br />PROCEED ON A 6 DAY WEEK, 10 HOUR DAY SCHEDULE UNTIL <br />THE JOB IS JUDGED COMPLETE BY THE ARCO ENGINEER. <br />NO DEVIATIONS FROM THIS SCHEDULE WILL BE TOLERATED <br />WITH THE EXCEPTION OF SEVERE WEATHER, NATIONAL <br />HOLIDAYS, OR WHEN THIS SCHEDULE VIOLATES THE LAW. <br />ANY DEVIATIONS WILL ONLY BE ACCEPTED WHEN THE ARCO <br />ENGINEER IS NOTIFIED IN WRITING BY AND OF THE DAY <br />OF THE CHANGE. <br />CONTRACTOR'S RESPONSIBILITY FOR RECORDING "AS -BUILT' <br />CONSTRUCTION INFORMATION: <br />1. DRAWINGS ARE DIAGRAMMATIC IN NATURE AND ARE NOT <br />INTENDED TO BE AN EXACT REPRESENTATION OF THE FINAL <br />PRODUCT. <br />2. IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR <br />TO RECORD ALL "AS -BUILT" INFORMATION INCLUDING, BUT <br />NOT LIMITED TO, THE FOLLOWING: <br />A. ALL OFF-SITE STREET AND SIDEWALK IMPROVEMENTS <br />INCLUDING UTILITIES PERFORMED AS A PART OF <br />THIS CONTRACT. <br />B. ALL ON-SITE IMPROVEMENTS INCLUDING UTILITIES. <br />C. THE EXACT LOCATION OF TANKS. <br />D. THE EXACT LOCATIONS OF ALL PRODUCT VENT AND <br />VAPOR LINES. <br />E. THE EXACT LOCATIONS OF ALL WATER, SEWER, <br />IRRIGATION, STORM DRAIN, ELECTRICAL CONDUITS, <br />TELEPHONE LINES, LOW VOLTAGE LINES, AND ANY <br />OTHER PIPING, CONDUITS, OR UTILITIES THAT ARE <br />INSTALLED, INCLUDE SIZE AND MATERIAL TYPE. <br />F. ALL BUILDING, CANOPY, SIGN, REFUSE ENCLOSURE <br />AND LIGHTING INCLUDING MODIFICATIONS, IF ANY, <br />INCLUDING SIZES, HEIGHTS, AND TYPES. <br />G. LANDSCAPE PLANTER CONFIGURATIONS. <br />3. THE "AS -BUILT" INFORMATION SHALL BE LEGIBLY WRITTEN <br />AND ACCURATELY DRAWN ON THE "JOB" BLUELINE SET. <br />AFTER ALL "AS -BUILT" INFORMATION IS RECORDED, <br />BARGHAUSEN CONSULTING ENGINEERS WILL UPDATE THE <br />ORIGINAL DRAWINGS TO "AS -BUILT" DRAWINGS. THE AS- <br />BUILTS MUST INCLUDE ANY CHANGE ORDERS OR <br />CLARIFICATIONS ISSUED THROUGHOUT THE CONSTRUCTION <br />PHASE, AND SHALL BE COMPLETED WITHIN 30 DAYS <br />FOLLOWING FINAL ACCEPTANCE WITHOUT EXCEPTION. <br />4. FAILURE TO PROVIDE THE NECESSARY AS -BUILT <br />INFORMATION WILL RESULT IN A DELAY OF THE FINAL <br />PAYMENT TO THE CONTRACTOR, <br />CONTRACTOR'S RESPONSIBILITY FOR COORDINATION WITH <br />JURISDICTIONAL AGENCIES, UTILITY COMPANIES, ARCO, AND ITS <br />REPRESENTATIVES: <br />1. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR <br />COORDINATING THE DELIVERY OF ALL EQUIPMENT. THIS <br />INCLUDES BUT IS NOT LIMITED TO THE LIST OF ITEMS <br />FURNISHED BY THE OWNER AND DEALER. THE PROJECT <br />WILL NOT BE ACCEPTED UNTIL THESE ITEMS HAVE BEEN <br />DELIVERED. <br />2. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR <br />CONTACTING THE APPROPRIATE UTILITY TO DETERMINE <br />EXACT CONSTRUCTION/INSTALLATION REQUIREMENTS AND <br />SPECIFICATIONS FOR THE ELECTRICAL, SEWER, STORM <br />WATER AND TELEPHONE LINES. A MINIMUM AMOUNT SHOULD <br />BE INCLUDED IN THE BID TO COVER BASIC STANDARD <br />INSTALLATION REQUIREMENTS. NO EXTRAS WILL BE PAID <br />FOR THIS WORK. SOME KNOWN REQUIREMENTS HAVE BEEN <br />INCORPORATED INTO THE PLANS. IT IS THE GENERAL <br />CONTRACTOR'S RESPONSIBILITY FOR VERIFYING THE <br />INFORMATION PROVIDED AS WELL AS DETERMINING <br />ADDITIONAL REQUIREMENTS PRIOR TO INSTALLATION. <br />3. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR <br />COORDINATING ANY CHANGES IN EXISTING UTILITIES <br />REQUIRED BY THIS PROJECT. VERIFICATION OF ALL <br />UNDERGROUND UTILITIES SHALL BE OBTAINED BY THE <br />GENERAL CONTRACTOR PRIOR TO EXCAVATING, PLEASE <br />NOTE THAT POT -HOLING FOR VERIFICATION OF UTILITY <br />LINE DEPTH FOR OFF-SITE UTILITIES IS REQUIRED PRIOR <br />TO INSTALLATION OF UTILITY CROSSINGS AND PLACEMENT <br />OF DRAINAGE STRUCTURES ON-SITE. - NO REQUEST FOR <br />EXTRAS WILL BE CONSIDERED IF CONFLICTS BETWEEN <br />UTILITIES CONSTRUCTED ON-SITE AND EXISTING OFF-SITE <br />OCCUR, IT IS HIGHLY RECOMMENDED THAT THE OFF-SITE <br />UTILITIES BE EXTENDED TO THE PROPERTY BEFORE THE <br />ON-SITE SYSTEMS ARE INSTALLED TO AVOID RE - <br />INSTALLATION OR RESETTING OF ON-SITE UTILITIES TO <br />MATCH IN CASE CONFLICTS ARE ENCOUNTERED PRIOR TO <br />REACHING THE PROPERTY. <br />4. G.C. IS RESPONSIBLE FOR PROVIDING TRAINING TO THE <br />DEALER IN THE OPERATION OF ALL INSTALLED EQUIPMENT, <br />ALL KEYS AND EQUIPMENT MANUALS WILL BE PRESENTED IN <br />A NEAT, ORGANIZED MANNER TO FACILITY MANAGEMENT. <br />ALL WARRANTY MATERIAL SHALL BE COMPLETED BY THE <br />GENERAL CONTRACTOR WITH SPECIFIC ATTENTION TO THE <br />BEGINNING AND ENDING PERIOD OF THAT WARRANTY AND <br />THE NAME OF THE CONTRACTOR PROVIDING WARRANTY <br />SERVICE FOR THAT PARTICULAR ITEM. <br />5. THE G.C. WILL COORDINATE AND/OR ARRANGE FOR ALL <br />NECESSARY INSPECTIONS. <br />AT CONCLUSION OF ALL WORK, G.C. MUST PROVIDE A COPY <br />OF ALL INSPECTION DOCUMENTS AS SIGNED OFF BY THE <br />VARIOUS INSPECTORS SIGNIFYING APPROVAL OF ALL <br />CONSTRUCTION. G.C. MUST FURTHER PROVIDE A COPY OF <br />THE DOCUMENT GRANTING EITHER TEMPORARY OR PERMANENT <br />OCCUPANCY. G.C. WILL ALSO PROVIDE A COPY OF THE <br />TANK MANUFACTURER'S INSTALLATION CHECKLIST <br />CERTIFYING BY SIGNATURE AND DATE THAT ALL <br />INSTALLATION PROCEDURES WERE FOLLOWED AND CHECKED. <br />REFER TO THE PROJECT COMPLETION SECTION FOR OTHER <br />REQUIREMENTS. <br />6. AN ARCO REPRESENTATIVE MUST BE AT THE SITE FOR THE <br />FOLLOWING ACTIVITIES: 1. <br />A. DELIVERY, TESTING, AND INSTALLATION OF THE <br />UNDERGROUND STORAGE TANKS. <br />B. TESTING OF PIPING, BOTH PRIMARY AND SECONDARY. <br />C. FINAL INSPECTIONS BY ALL AGENCIES HAVING <br />JURISDICTION OVER THIS PROJECT. <br />D. PROJECT COMPLETION/WALK-THROUGH. <br />THE G.C. MUST GIVE 48 HOUR ADVANCE NOTICE. <br />7. PERMITS <br />IT IS THE GENERAL CONTRACTOR'S RESPONSIBILITY TO <br />COORDINATE WITH ARCO AND THEIR REPRESENTATIVES TO <br />GUARANTEE THAT ALL PERMITS ARE OBTAINED PRIOR TO <br />COMMENCING ANY CONSTRUCTION ON THIS PROJECT. <br />ARCO HAS ARRANGED FOR PERMITS WHICH REQUIRE PLAN <br />CHECKING BY GOVERNMENT AGENCIES. A SEPARATE PERMIT <br />COORDINATOR HAS BEEN HIRED TO ARRANGE FOR THESE <br />PLAN -CHECKING ACTIVITIES AND NECESSARY APPROVALS. <br />THE GENERAL CONTRACTOR SHALL PICK UP ANY PERMITS <br />NOT PREVIOUSLY OBTAINED BY ARCO OR ITS PERMIT <br />COORDINATOR. ANY OUTSTANDING FEES SHALL BE PAID BY <br />THE GENERAL CONTRACTOR AND REIMBURSED BY ARCO <br />(I.E., DO NOT INCLUDE A PERMIT ALLOWANCE IN YOUR <br />BID). <br />OTHER PERMITS REQUIRED OF THE GENERAL CONTRACTOR OR <br />HIS SUB -CONTRACTORS INCLUDING BUT NOT LIMITED TO: <br />- ENCROACHMENT PERMITS <br />- PLUMBING, MECHANICAL AND ELECTRICAL PERMITS <br />(IF SEPARATE FROM BUILDING PERMIT) <br />- UTILITY CONNECTION PERMITS <br />- SIGN INSTALLATION PERMITS <br />ANY OTHER PERMITS WHICH REQUIRE A CONTRACTOR'S <br />LICENSE, BUSINESS LICENSE, INSURANCE AND WORKMAN'S <br />COMPENSATION CERTIFICATE AND CAN BE OBTAINED OVER <br />THE COUNTER WITHOUT PLAN CHECKING ARE THE <br />RESPONSIBILITY OF THE GENERAL CONTRACTOR. <br />LICENSING FEES SHALL BE PAID FOR BY THE CONTRACTOR. <br />B. THE GENERAL CONTRACTOR SHALL COORDINATE AND PERFORM <br />ALL TESTS AND INSPECTIONS REQUIRED TO OBTAIN THE <br />OPERATING PERMITS FROM BOTH THE ENVIRONMENTAL <br />HEALTH DEPARTMENT AND THE AIR QUALITY MANAGEMENT <br />DISTRICT WITH THE EXCEPTION OF THE PRECISION TEST <br />WHICH SHALL BE PERFORMED BY ARCO OR ARCO'S OWN <br />CONTRACTOR. THE OWNER OR OPERATOR OF THE FACILITY <br />WILL PROVIDE THE NECESSARY HAZARDOUS MATERIALS <br />MANAGEMENT PLAN TO THE ENVIRONMENTAL HEALTH <br />DEPARTMENT. THE GENERAL CONTRACTOR SHALL GUARANTEE <br />THAT ALL OPERATING PERMITS ARE 1N -PLACE PRIOR TO <br />COMPLETION OF THIS PROJECT. <br />9. SOIL TESTING TO GUARANTEE COMPLIANCE WITH PLANS AND <br />SPECIFICATIONS SHALL BE PROVIDED BY ARCO FOR <br />INITIAL COMPACTION TESTING. FAILING TEST AND <br />RETESTING RESULTING THEREFROM SHALL BE PAID FOR BY <br />THE GENERAL CONTRACTOR. <br />PROJECT COMPLETION: <br />1. AT THE COMPLETION WALK-THRU INSPECTION, THE GENERAL <br />CONTRACTOR MUST PROVIDE THE FOLLOWING ITEMS TO <br />CONSIDER THE PROJECT COMPLETE. <br />A. INSPECTION CARDS SHOWING SIGNATURES FOR ALL <br />FINAL INSPECTIONS. <br />B. CERTIFICATE OF OCCUPANCY (TEMPORARY OF <br />PERMANENT). <br />C. WRITTEN APPROVAL TO OPERATE THE STORE AND <br />GASOLINE DISPENSING SYSTEMS FROM THE HEALTH <br />DEPARTMENT. <br />D. PERMITS TO OPERATE FROM THE AIR POLLUTION <br />CONTROL DISTRICT. <br />E. PROVIDE ALL OPERATING MANUALS, WARRANTY <br />INFORMATION, KEYS AND OTHER PERTINENT <br />INFORMATION IN A NEAT AND ORGANIZED FASHION. <br />IN ADDITION, THE PUNCH LIST MAY NOT CONTAIN MORE <br />THAN FIVE (5) SUBSTANTIAL ITEMS. NONE OF WHICH MAY <br />PREVENT THE FULL OPERATION OF THE STORE. <br />2. THE GENERAL CONTRACTOR SHALL CLEAN THE INTERIOR AND <br />EXTERIOR OF THE STORE ACCORDING TO THE STANDARD <br />SPECIFICATIONS, UPON COMPLETION OF PROJECT. <br />3. THE GENERAL CONTRACTOR SHALL PROVIDE AS -BUILT <br />DRAWINGS AND DOCUMENTS AS OUTLINED IN THE <br />"CONTRACTOR'S RESPONSIBILITY FOR PROVIDING AS -BUILT <br />INFORMATION" ABOVE. <br />BUILDING CONSTRUCTION, ON AND OFF-SITE IMPROVEMENTS: <br />1. THE GENERAL CONTRACTOR SHALL ESTABLISH THE CORRECT <br />PROPERTY LINES BASED ON PROPERTY CORNER MONUMENTS <br />TO BE SET PRIOR TO CONSTRUCTION, BENCHMARKS, ETC. <br />ALL SITE STRUCTURES (INCLUDING THE BUILDING, <br />CANOPY, TANKS, AND OTHER SITE IMPROVEMENTS) SHALL <br />BE LOCATED USING THESE ESTABLISHED POINTS. THE <br />GENERAL CONTRACTOR SHALL LAY OUT ALL STRUCTURES <br />WHETHER OR NOT HE IS DOING THE INSTALLATION. ALL <br />GRADING STAKES SHALL BE CHECKED AGAINST ESTABLISHED <br />REFERENCE POINTS BEFORE ANY GRADING OR FORMING <br />TAKES PLACE. ANY PROPERTY CORNER DISTURBED OR <br />DESTROYED SHALL BE RESET BY A REGISTERED CIVIL <br />ENGINEER OR LAND SURVEYOR UPON COMPLETION OF THE <br />PROJECT AT THE GENERAL CONTRACTOR'S OWN COST AND <br />EXPENSE. <br />2. THE GENERAL CONTRACTOR IS RESPONSIBLE AND SHALL <br />PROVIDE ALL ELECTRICAL WORK. ALL WIRING SHALL BE <br />IN CONTINUOUS RUNS WITH NO SPLICES. ALL ELECTRICAL <br />CONDUIT FOR SITE, FUEL ISLANDS, AND CANOPIES SHALL <br />BE AS SPECIFIED IN THE ELECTRICAL DRAWINGS AND <br />SPECIFICATIONS. SPECIFICALLY, ALL UNDERGROUND <br />CONDUIT FROM THE DISPENSERS AND THE TANK FIELD TO <br />THE ELECTRICAL PANELS WILL BE 3/4" OR LARGER HEAVY <br />RIGID METAL. THE G.C. MUST BALANCE ELECTRICAL <br />PANEL LOADS AND LABEL BREAKERS AT THE COMPLETION OF <br />THIS PROJECT. <br />3. ALL ELECTRICAL RECEPTACLES AND SWITCHES SHALL BE <br />WHITE. ALL COVER PLATES SHALL BE UNBREAKABLE <br />WHITE. IVORY COLORED RECEPTACLES, SWITCHES, AND <br />COVER PLATES WILL NOT BE ACCEPTED. <br />4. TANK SLAB AND DRIVE SLAB AREAS SHALL BE CONSTRUCTED <br />AS SPECIFIED ON THE PLANS. CONCRETE SURFACES <br />INCLUDING ALL PUMP ISLANDS, DRIVE SLABS AT PUMP <br />ISLANDS, FILL SLABS OVER TANKS, CURBS WITHIN THE <br />YARD ARE TO BE COLORED AND SEALED PER <br />ARCO SPECS IN SECTION 3350 OF THE AM/PM <br />SPECIFICATIONS. FAILURE TO DO SO WILL RESULT IN <br />G.C.'S HAVING TO REMOVE AND REPLACE IMPROPERLY <br />COLORED CONCRETE. <br />5. ALL OFF-SITE WORK INDICATED ON THESE PLANS SHALL BE <br />PROVIDED BY THE GENERAL CONTRACTOR. COORDINATE THE <br />INSTALLATION OF METERS AND MISCELLANEOUS EQUIPMENT <br />FURNISHED BY THE CITY. THE BID QUOTE PROVIDED FOR <br />6. FLASH REPORTS MAY BE ISSUED BY ARCO OCCASIONALLY. <br />THESE REPORTS GENERALLY CLARIFY CONFLICTS OR ALTER <br />THE PROJECT SPECIFICATION. THE GENERAL CONTRACTOR <br />IS RESPONSIBLE FOR MAKING THESE CHANGES IF THE <br />AFFECTED WORK HAS NOT BEEN COMPLETED. ADDITIONAL <br />COSTS DUE TO THESE CHANGES MUST BE PRESENTED PRIOR <br />TO DOING THE WORK. <br />7. SEAL COAT PAVEMENT SEALER - CONTRACTOR SHALL <br />PROVIDE A SEAL COAT OF ASPHALT EMULSION AS <br />SPECIFIED IN THE SPECIFICATIONS FOR "WOOD FRAME <br />CONSTRUCTION% SECTION 2400, PARAGRAPH 8. <br />SEAL COAT SHALL BE APPLIED 30 DAYS AFTER PROJECT <br />COMPLETION. PROVIDE TEMPORARY PAVEMENT STRIPING <br />PRIOR TO FINAL INSPECTION TO INSURE THAT FINAL <br />OCCUPANCY CAN BE OBTAINED. RESTRIPE THE LOT WITH <br />PERMANENT PAINT, AS SPECIFIED IN SECTION 9903 OF <br />THE SPECIFICATIONS FOR WOOD FRAME CONSTRUCTION, <br />AFTER THE SEAL COAT HAS BEEN APPLIED. <br />TANK AND LINE INSTALLATION: <br />1. REFER TO SOILS REPORT FOR RECOMMENDATIONS WITH <br />RESPECT TO THIS TANK INSTALLATION. THIS IS A DRY <br />HOLE INSTALLATION. <br />2. THE G.C. SHALL INSTALL (4) 10,000 GALLON, DOUBLE <br />WALL, FIBERGLASS (XERXES) TANKS. <br />G.C. WILL FOLLOW ARCO'S AND THE TANK MANUFACTURER'S <br />INSTALLATION AND BACKFILLING INSTRUCTIONS <br />INCLUDING, THE USE OF FILTER FABRIC TO LINE THE <br />BOTTOM AND SIDES OF THE TANK HOLE. SHOULD ADVERSE, <br />UNFORESEEN SOIL CONDITIONS BE ENCOUNTERED ONCE <br />CONSTRUCTION HAS BEGUN, G.C. WILL IMMEDIATELY <br />CONTACT ARCO'S FIELD ENGINEER FOR FURTHER DIRECTION <br />BEFORE PROCEEDING. <br />C <br />0 <br />E <br />0 <br />U <br />L9 <br />"1 <br />W <br />Ike <br />cd <br />70C <br />0 <br />W <br />C <br />D <br />aper. <br />00 <br />C <br />0 <br />0 <br />0 <br />0 <br />C <br />�� <br />date drawn by <br />05/19/95 2D.F. <br />Projaat / ladllty <br />sheat / file <br />T-2 <br />of <br />0 <br />C <br />cc <br />E•��ij <br />ui <br />O <br />a <br />00 <br />E00)>o <br />CD <br />0Ccc <br />�w�� <br />V <br />m <br />a <br />06 <br />03 <br />0 <br />® <br />U <br />V <br />L0 <br />75 <br />0 <br />0 <br />O <br />C <br />■ <br />Q <br />^L, <br />J <br />0 <br />C <br />V <br />N <br />O <br />Q <br />2 <br />� <br />N <br />K <br />0 <br />C <br />0 <br />E <br />0 <br />U <br />L9 <br />"1 <br />W <br />Ike <br />cd <br />70C <br />0 <br />W <br />C <br />D <br />aper. <br />00 <br />C <br />0 <br />0 <br />0 <br />0 <br />C <br />�� <br />date drawn by <br />05/19/95 2D.F. <br />Projaat / ladllty <br />sheat / file <br />T-2 <br />of <br />