Laserfiche WebLink
i 1 <br />'c0 , <br />CIS <br />4j <br />0 <br />C <br />ca <br />O <br />rr �� <br />cl , <br />ca <br />E•` <br />0 <br />m <br />O <br />Cam <br />= <br />mV_ <br />G <br />u'0>0 <br />O <br />1 <br />. <br />fd <br />1 , <br />Uw <br />2 <br />E <br />rn <br />a <br />'1 <br />5 <br />W <br />I <br />ca <br />C <br />mU <br />cd <br />E <br />CJS <br />V <br />fir} <br />.� <br />V <br />N <br />� <br />E <br />ji J}I <br />H11 <br />SITE PLAN <br />SCALE: 1" = 10'-0" <br />R=40.00' <br />L=33.20' <br />ACCES1 DRIVE <br />�I <br />0 <br />0 <br />J <br />0- <br />CONC. DRIVEWAY <br />FA <br />e <br />Piping Legend <br />PRODUCT PIPING <br />VAPOR RECOVERY PIPING <br />VENT PIPING <br />©N NOTES ITEM # <br />AfCY.�S DR/VE LAN ER <br />i 1 <br />CONC. <br />Ln <br />co <br />ICOW <br />I:10 <br />YD. LIGHT, <br />TYP. <br />CONCRETE DRIVE SLAB <br />A. C. PAVING <br />PL=164.25' <br />PLANTER <br />(CENMRUNE LOCATION N.T.S.) Hammer Lane - <br />1. <br />/R=20.00' <br />L=�3.20� <br />CONC. SIDEWALK, CURB & GUTTER <br />U <br />Piping Notes <br />A. ALL IMPROVEMENTS ARE EXISTING AND TO REMAIN UNLESS <br />OTHERWISE NOTED. <br />B. (4) EXISTING DOUBLE WALL FIBERGLASS. TANKS SHALL <br />REMAIN. TANK BURIAL DEPTH SHALL BE DETERMINED IN FIELD. <br />C. UPGRADE TANK FIELD PIPING & EQUIPMENT PER ARCO TANK <br />DRAWINGS DATED MAR. 1, 1994. (SECTIONS RELEVANT TO A <br />LINE REPLACEMENT) <br />D. ALL WORK SHALL BE DONE PER ARCO TANK DRAWINGS DATED <br />MAR. 1, 1994 AND SECTIONS 13800 OF "CONSTRUCTION <br />SPECIFICATIONS, WOOD FRAME CONSTRUCTION" DATED MAY <br />1991. (SECTIONS RELEVANT TO A LINE REPLACEMENT) <br />E. **** NOT USED **** <br />F. TANK AND LINE TESTING AND AIR QUALITY TESTING WILL <br />BE DONE BY ARCO. THE CONTRACTOR SHALL HAVE A <br />REPRESENTATIVE PRESENT DURING TESTING. <br />G. A.C. PAVEMENT SHALL BE SEAL COATED AND STRIPED. <br />(TO MATCH EXISTING) <br />H. ALL YARD STORM DRAINS & LINES SHALL BE CLEANED OUT, <br />I. ALL METAL YARD COVERS (INCLUDING TANK FIELD) SHALL <br />BE PAINTED BLACK (EXCEPT FILL COVERS). <br />J. BUILDING, CANOPY AND SIGNAGE SHALL BE PRESSURE <br />WASHED. <br />K. SITE SHALL BE FENCED OFF WITH 6' HIGH CHAIN LINK <br />FENCING DURING CONSTRUCTION. <br />L. EXISTING ELECTRICAL CONDUITS ARE TO BE UTILIZED. <br />REPLACE/ALTER ELECTRICAL AND RONAN CONDUIT AS <br />NECESSARY. <br />M. CAP ASPHALT AREA TRENCHES WITH 3" CONCRETE PRIOR <br />TO LAYING ASPHALT. <br />N. TOUCH—UP PAINTING IS TO BE COMPLETED BY CONTRACTOR <br />AS REQ'D. <br />0. CONTRACTOR IS TO REPLACE ALL DISPENSER FILTERS <br />AFTER JOB COMPLETION. <br />Plan Notes <br />0 REMOVE & DISPOSE OF ALL EXISTING SECONDARY <br />CONTAINMENT, PRODUCT AND VAPOR RECOVERY PIPING <br />FROM EXISTING DISPENSERS TO EXISTING PRODUCT TANKS. <br />INSTALL NEW PIPING. <br />0 REMOVE AND REPLACE EXISTING SINGLE WALL VENT PIPING <br />FROM EXISTING PRODUCT TANKS TO EXISTING VENT RISERS. <br />0. INSTALL NEW DISPENSER CONTAINMENT BOXES (TYP. OF 8). <br />EXISTING DISPENSER CONFIGURATION IS TO BE MAINTAINED. <br />DISPENSER CLEARANCES ARE TO BE 3'-5'. <br />REMOVE AND REPLACE EXISTING CONTAINMENT SUMPS AND <br />MANHOLES AT PRODUCT TANKS (TYP. OF 3 OR AS REQ'D.). <br />5O ALL SUMP PENETRATION FITTINGS SHALL BE INSTALLED <br />FROM INSIDE THE SUMPS. <br />THE APPROPRIATE SUMP COLLAR WILL BE DETERMINED ONCE <br />TANKS ARE UNCOVERED. ARCO WILL SUPPLY THE COLLARS <br />AND ARRANGE FOR THEIR INSTALLATION. THE SUMPS WILL <br />BE SUPPLIED BY ARCO AND INSTALLED BY THE CONTRACTOR <br />7� REMOVE & REPLACE EXISTING SIPHON PIPING. <br />REMOVE AND REPLACE ALL EXISTING ISLANDS, DRIVE SLAB, <br />TANK SLAB. MAINTAIN EXISTING WIDTH OF WALK - THRU <br />BETWEEN COLUMNS ON ALL ISLANDS. <br />9O. CONTRACTOR SHALL RESET GUARDPOSTS AT ALL ENDS OF <br />ISLAND PER DETAIL 1 THIS SHEET. REPLACE BENT POSTS. <br />BUMPER POST SIGNAGE IS TO BE RE -INSTALLED. <br />10 CONTRACTOR SHALL LOWER CARDREADERS TO 5' ABOVE <br />DRIVE SLAB TO CENTERLINE OF VIEW SCREEN. <br />11 REPLACE DOWNSPOUTS AS REQ'D. THRU CURB FACE WHEN <br />CONSTRUCTING NEW ISLANDS. <br />12 A RONAN X76S SYSTEM EXISTS AND IS TO BE UTILIZED, <br />CONTRACTOR SHALL REPLACE ALL MONITORING PROBES <br />WITH ARCO SUPPLIED PROBES. <br />13 INSTALL PANEL "D" SUBPANEL. RELOCATE ALL CIRCUITS <br />SERVING ELECTRONIC AND RONAN EQUIPMENT TO THIS <br />SUBPANEL. <br />0 5 10 20 30 40 <br />date drawn by <br />05/13/95 2D.F. <br />project / facility <br />5569 <br />TL -1 <br />of <br />AR642TL1.DWG <br />'c0 , <br />CIS <br />4j <br />0 <br />C <br />ca <br />O <br />�LO <br />cl , <br />ca <br />E•` <br />0 <br />m <br />O <br />Cam <br />= <br />mV_ <br />G <br />u'0>0 <br />O <br />. <br />fd <br />Uw <br />2 <br />E <br />rn <br />a <br />5 <br />W <br />ca <br />C <br />mU <br />cd <br />E <br />CJS <br />V <br />m <br />.� <br />V <br />N <br />� <br />E <br />O <br />MID� <br />C <br />mu%N <br />X <br />O <br />75 <br />1300, <br />CO <br />a <br />8 <br />rn <br />LonC <br />a <br />a <br />J <br />O <br />V <br />m <br />O <br />Y <br />N <br />Q <br />N <br />date drawn by <br />05/13/95 2D.F. <br />project / facility <br />5569 <br />TL -1 <br />of <br />AR642TL1.DWG <br />X <br />CIS <br />W <br />O <br />CWC <br />cl , <br />date drawn by <br />05/13/95 2D.F. <br />project / facility <br />5569 <br />TL -1 <br />of <br />AR642TL1.DWG <br />CWC <br />AG <br />W <br />O <br />Cc <br />Y. <br />fd <br />E <br />= <br />5 <br />W <br />ELcd <br />cd <br />E <br />CJS <br />= <br />N <br />V <br />� <br />E <br />O <br />C <br />X <br />75 <br />CO <br />a <br />8 <br />rn <br />aw. <br />date drawn by <br />05/13/95 2D.F. <br />project / facility <br />5569 <br />TL -1 <br />of <br />AR642TL1.DWG <br />