Laserfiche WebLink
UNAUTHORIZED CHANGES AND USES: The engineer preparing these PIPING LEGEND PIPING INSTALLATION NOTES: ® PIPING INSTALLATION NOTES: <br /> plana will not be responsible for, or liable for unauthorized <br /> for, unauthortzed changes to or uses of these plans, All changes — <br /> plana must be In writing and must bne approved by the preparer 2" F.G. DOUBLE WALL 18 CONTRACTOR SHALL PATCH AND/OR REPAIR EXISTING A.0 ALL CONSTRUCTION IS EXISTING AND TO REMAIN UNLESS <br /> of these plana. 92-- PRODUCT PIPING PAVING AND CONCRETE AS REQUIRED BY NEW WORK. ALL NOTED OTHERWISE. kL <br /> Construction contractor agrees that in accordance with generally - - - _3"vft- - - - - 2" OR 3' F.G. SINGLE WORK SHALL CONFORM TO ARCO SPECIFICATIONS. AMEEW <br /> accepted constructionpB <br /> practices, construction contractor will be WALL VAPOR RECOVERY CONTRA l THE CONTRACTOR SHALL SLURRY SEAL AND THE CONTRACTOR SHALL MAINTAIN AND PROTECT EXISTING <br /> required to assume sole and complete responafblity for lob site PIPING <br /> conditions during the coupe oe construction of thio protect, RESTRIPE ENTIRE SITE AREA UPON COMPLETION OF WORK. CANOPY COLUMNS, FOOTING AN SHROUD FINISHES IN <br /> Including safety of all persona and property, that s p requirement — — — 2" F.G. SINGLE WALT. S.S.M.H. CONC. SLURRY SEAT SMALL BE SCHEDULED TO BE PERFORMED PLACE THE CONTRACTOR SHALL REPAIR OR REPLACE <br /> shall be made to apply continuously and not Iimlled to normal VENT PIPING WITHIN 30 DAYS AFTER COMPLETION OF CONCRETE AND CANOPY RAINWATER LEADER IF DAMAGED BY ISLAND <br /> Or <br /> working hours, and construction contractor further agrees to 1 DRIVE A.C. PAVING REPAIRS TO ALLOW THE STATION TO REMAIN REMOVAL. SEE SHEET CA1-1, TYPICAL <br /> defend, (damnify and hold design professional harmless from any — —G— — — EXISTING UNDERGROUND �._; <br /> and all liability, real or alleged, In connection with the performance UTILITIES (WATER, GAS) - IN OPERATION' <br /> VAPOR AND VENT PIPING IS TO SLOPE AT 1/8" PER FOOT. <br /> of work on this protect, excepting liability arising from sole NEW CONCRETE .. l e <br /> negligence of design professional. ` 1 CONTRACTOR SHALL CONSTRUCT NEW 6" THICK CONCRETE SIPHON PIPING I$ TO SLOPE 1/4 PER FOOL C > 0, <br /> S.D.M.H. SLAB WITH #3 REBAR AT 18" O.C., EACH WAY, OVER 4" C C <br /> r — } <br /> NEW A.c. PAVING q`_ �''� AGGREGATE BA E. SECONDARY CONTAINMENT PIPING IS SHOWN BY NOTE E 'L- Q C0 <br /> };pglneen Nale to Contractor: LJ .�1� `V <br /> The existence and location of any underground utilities, pipes, .%% r5„ ONLY NOT GRAPHICALLY. ALL PRODUCT PIPING N BE <br /> and/or structures shown on these plans were obtained by a CONTRACTORS ALL REMOVE AND REPLACE EXISTING DOUBLE CONTAINMENT PIPE VAPOR RECOVERY AND VENT /� U <br /> search of available records. To the beat of our knowledge, there TANK ELEVATION: ',�- �,' '�1 ANGRY COLUM SHROUD AS NECESSARY TO FACILITATE PIPING TO BE SINGLE WALL PIPE Z G <br /> are no existing utilities except as shown on these plans. The <br /> contractor shall ascertain the true vertical and horizontal location `�' �'�� ` ORK. EXTEND B, TYPICAL <br /> DOWNSPOUT DRAIN LINE TO FACE <br /> and size of those to be used of any underground ulilitles and EXISTING. 3a < , 1� i-'•r F ISLAND CURB, TYPICAL OF 4. ALL NEW PIPING SHALL BE INSTALLED PER L <br /> g p�,}3� i ;� MANUFACTURER'S RECOMMENDATIONS AND INSTALLAl10N .. <br /> shall be responsible for any damage to any public or private `'' '^ <br /> uih8les, shown or not shown hereon. - \' Vit. ` 2 NTRACTOR SHA LL RESTRIPE PARKING IN ACCORDANCE INSTRUCTIONS. CONTRACTOR SHALL USE FLEMBLE O W <br /> CITY OF SAC AMENTO STANDARDS, PROVIDE AND CONNECTORS FROM THE TANK SUMP TO THE VAPOR :� W ►.. <br /> IMPORTANT NOTICE .�''' `% r�- TER <br /> SS '� t' pN TALL NEW H. ICAP PAVEMENT SIGN AND STRIPING. RECOVERY MANIFOLD, MAIN PRODUCT LINES AND SIPHON <br /> Section 4216/4217 of the Goremment Cade require$ / ACCESS DRIVE CL pLA '(/ V <br /> 0 oWW uet Iden nolo Namber b$ I$$oed before a Q, LVE PIPING SHALL PROVIDE AT LEAST FOUR (4) FEET OF <br /> Permit to Excawle wtll be wild. for your olg Alert 2 C N RACTOR SHAW INSTALL NEW TWO-POINT, 4" FILL AND STRAIGHT FRP PIPE RUN BEFORE A CHANCE OF DIRECTION Q � � <br /> m "ambo c°" '/' APPROXIMATE LOCATION OF B X (n <br /> UNDERGROUND SERVICE ALERT S E VAPOR REGGGGGGOVERY SUMP. REPLACE EXISTING Of MORE THAN 30 DECREES. i,.s O <br /> 1 -800-227-2600 ..� (E) VENT PIPING RI SAND IN STAL ADDITIONAL HARDWARE AND FITTINGS o ,^ <br /> For VOddgroune «auag, 2 workmq do fore you dig. AS OUIRED. TYPICAl OF 3 TANKS. REFERENCE SHEET NOTE TO CON A .TOR: I I DRI S A13 CONCRETE SHALL U at <br /> �1+ <br /> ' TK BE COLORED O. (7.6 POUNDS LAMP BLACK PER " <br /> 10 CUBIC YARD OF CONCRETE). ALL CONCRETE TANK CIdRS .y //'� <br /> (E) TANK VEdVI S.S. C. O. 3 INS L NEW 2" VENT1 LINES, SLOPE AT 1/8" (MINIMUM), SHALL BE V W <br /> l , BAC TANKS. EXTEND AND CONNECT TO EXISTNG VENTO Q Or <br /> RISERS PIPIN O INSTALL NEW 48" DIAMETER TURBINE SUMP. INSTALL NEW <br /> TURBINE SUMP COLLAR AS REQUIRED, BY TANK L <br /> - � • � 1� INSTA EW VEEDER- OOT TLS-350 TANK MONITOR UNIT. MANUFACTURER (SUBCONTRACTOR TO G.C.). TYPICAL OF 3. e co <br /> _ <br /> ROM NO INSTALL EQUIRED ELECTRICAL POWER AND <br /> 5 • r II ATA NECTIONS. LO ATE AS DIRECTED BY ARCO FIELD O CONSTRUCT NEW CONCRETE SLAB OVER TANKS AS (� <br /> R=40.00' BOXVE PLANTER �� o � I 5 GINE i / „ O C O <br /> REQUIRED BY NEW WORK. SET MANHOLE COVERS 1-1 2 <br /> .- O 11 ABOVE SLAB. SEE DETAIL SHEET TK3-5. 'e'w <br /> L=33.20' —' '\ 5 C NTRA T R SHALL INS LL TWO (2) 2 HP, VARIABLE <br /> S ED T (NES. ONE (1 IN 97 OCTANE, UNLEADED TANK O3 INSTALL 3" SINGLE WALL STAGE VAPOR RECOVERY <br /> U <br /> ( Q eew CJ I \ 1 AN ONE 1 IN THE A TI IP 87 OCTANE, HEADER FOR "BALANCE" VAPOR RECOVERY SYSTEM. SLOPE LL ,{• <br /> 4 / $1 ISL.{/ I UN EADE T NK. �l <br /> / CB _ _ O_� �. 5, C. O. _ ,I! O r�O ^ 2 1 \=- _ I ��'• 5 1 SECTIONS, SHEET MTK 3MU� TO TANKS. SEE DETAILS AND ,r <br /> / �j[�] L �I _ 8 SD J 1 ® INSTALL TWO, 2' DOUBLE WALL, PRODUCT LINES. LINES 'f0 cd <br /> C—,Ill,11}"1L'� 1 - BE EQUIPPED WITH LEAK MONITOR IN PIPING SUMP, <br /> r --t ) —] I �'/ J "' <`; \, ? ' ATTACHED TO TANK LEAK MONITOR WIRED FOR TURBINE GC <br /> SHUT DOWN. SEE DRAWING TK4-2 FOR WIRING DIAGRAM. _ <br /> [C� -] 1 __�,� SLOPE 1/8-INCH PER FOOT, MINIMUM, TO TANKS. SEE cd <br /> t I 11 ��r`) DETAIL 10, SHEET TK3-2 FOR TYPICAL PIPING <br /> II �/ (E) DRY ANNULAR — S. C. <br /> 0 ARRANGEMENT AT TANK 0 <br /> PIPING SHALL BE INSTALLED PER 0- <br /> FH ARCO FA L� I I r } MANUFACTURER'S RECOMMENDATIONS. W <br /> SPACE TO REMAIN, TYP q. ',�} Cd <br /> OS OD REUSE THREE, 2" VENT LINES. SLOPE 1/8-INCH PER FOOT, ��„ ' -.J <br /> 569 I (MINIMUM) TO TANKS. <br /> PLAN TERI 21 9 8 7 1 i . 1821 W <br /> II 0 © TERMINATION POINT OF TANK VENTS TO BE A MINIMUM OF / \ <br /> t I (p 12' ABOVE GRADE AND NOT WITHIN 5' FROM ANY BUILDING <br /> = I } Q OPENING OR PROPERTY LINE THAT CANBUILT UPON. <br /> ^� .----'-------- 4 VENT RISERS SHALL BE INSTALLED IN ACCORDANCE WITH <br /> UNIFORM FIRE CODE REQUIREMENTS. J^ <br /> (E) CANOPY yam`" 151314 3 ' O CONTRACTOR SHALL PROVIDE AND INSTALL NEW L.L- <br /> ��`)� SUBMERSIBLE PUMP POWER AND MONITOR CONDUITS AS W <br /> REQUIRED BY NEW WORK. REFERENCE SHEET TK4-2. <br /> / INSTALL BALL FLOAT VALVE/EXTRACTOR FITTING ASSEMBLY <br /> ACCES_ DRIVE �/ / 1 FOR VENT AND STAGE II VAPOR RECOVERY. SEE SHEET Q <br /> _ ` - i. . 'O TK-2 AND TK3-1. <br /> _ �E) P.I. C. UNI \ o I LLI <br /> CEJ ACCESS �. . ` O9 SEE DRAWING TK4-2 FOR MONITORING CONDUIT DETAILS. rI1 z <br /> TRASH -- r RAMP TYP. OF 2. : �/ . .� / 1 VJ <br /> ENCLOSURE PROTECT EXISTING INSPECTION/OBSERVATION WELL IN z � Z <br /> PLACE AS SHOWN. W ._.I �l <br /> VA 11 INSTALL 2" DIAMETER, DOUBLE WALL, FIBERGLASS, ACTIVE O --� <br /> O AND INACTIVE SIPHON LINES AS SHOWN ON DETAILS 6, 7 �/� <br /> 0 18 21 a\ �I•- ` AND 10, SHEET TK3-2. co �R <br /> \ � <br /> BACKFILL AND COMPACT TANK EXCAVATION IN Q W Z <br /> 0- AIRIWA FE ,Vy 19 r I ACCORDANCE WITH ARCO SPECIFICATIONS. PATCH AND/OR z <br /> UNI Tf h '•/ REPLACE A.C. PAVING TO MATCH EXISTING. Q Q CL r c <br /> ���, • + + ,. `� I 13 INSTALL NEW 4'x7', STEEL-FORMED, CONCRETE DISPENSER Z E <br /> S l; ISLAND, TYPICAL OF 4. REFERENCE DETAIL 1, SHEET (� U o <br /> CAI-i. Q W D a <br /> INSTALL FOUR (4) WAYNE VISTA SERIES 2/V580, 35" <br /> Q O W t <br /> FRAME, MULTI-PRODUCT DISPENSERS, TO BE FITTED WITH <br /> WITH BALANCE STAGE II HOSES AND NOZZLES, BREAK = Y O " <br /> AWAY VALVES AND UNDER DISPENSER CONTAINMENT Z rt <br /> U <br /> INCLUDING PRODUCT AND VAPOR SHEAR VALVES AND 3M c <br /> I INTERCOM. SEE DRAWINGS 1K3-3 AND TK3-4 FOR TYPICAL Lo O <br /> P. U.E. - INSTALLATION DETAILS. SEE DRAWING TK4-1 FOR <br /> A. C. PAVING `^h ] (2) VAULTS CID � <br /> (5) PULL BOXES DISPENSER WRING DIAGRAM. START UP BY n-Q <br /> ` MANUFACTURER'S REPRESENTATIVE. CONTRACTOR TO <br /> L1 (1) SIGNAL LT. PURGE LINES WITH MINIMUM 200 GALLONS PER HOSE. ANY <br /> JI xf• , (1) GAS VALVE AIR POCKETS OR START-UP PROBLEMS DUE TO IMPROPER <br /> [ , INSTALLATION OR INCORRECT WIRING THAT DESTROYS <br /> SD - SD C1 <br /> SD ELECTRONICS WILL BE BILLED BACK TO THE CONTRACTOR. <br /> NOTE THAT PIPING TO THE DISPENSERS MUST ALWAYS BE <br /> INSTALLED TO THE "B" SIDE OF THE DISPENSER TO N w o <br /> S.D.M.H. ��� ! ] ENSURE PROPER MOUNTING TO THE UNDER DISPENSER v <br /> Q CONTAINMENT SUMP. Z tau 61 - x <br /> I.D./PRICE SIGN Q N z cal <br /> CB 15 INSTALL DISPENSER SUMP MONITORS, TYPICAL OF 4. �+ 2 <br /> aWm <br /> ° � `o° <br /> /R=20.00' 16 INSTALL NEW ISLAND BUMPER POST, TYPICAL OF 4. SEE ® o U <br /> YD. LIGHT PLANTER L= 3.20' DETAIL 6, SHEET CA1-1. a J a <br /> AY PHONE TYP. 7 CONTRACTOR SHALL PROVIDE AND INSTALL (2) 3/4"0 °'d 0 <br /> -- I CONDUITS, NTH CONDUCTORS, TO EXISTING P.I.C. UNITS, <br /> VAULT TYPICAL OF 2. EXTEND CONDUITS AND COMPLETE <br /> CABLE PL= 164.25' <br /> CONNECTIONS AT CASHIER'S STATION. <br /> CONC. DRIVEWAY <br /> mos er release ate <br /> - VAUL T -- VAUL T <br /> N0. DATE REVISIONS PROJECT RELEASE proj. axe, drawn by <br /> CONC. SIDEWALK, CURB & GUTTER — -- - - ---- <br /> s to/oo dw- <br /> PERMIT <br /> - - - - - Hammer <br /> _ Hammer Lane <br /> - Project / facility - <br /> GRAPHIC SCALE °1D 5569 <br /> o CONST. sheet/ file <br /> - TK-1 <br /> ( IN FEET) AS-BUILT of <br /> I Inch - 10 feet <br /> "R ::.:d ti ,1t1;"ELF .FRSE/5°d3i. 5G3TK-i.01'M <br />