My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2000 TANK TOP UPGRADE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3518
>
2300 - Underground Storage Tank Program
>
PR0232337
>
INSTALL_2000 TANK TOP UPGRADE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2021 4:30:07 PM
Creation date
11/5/2018 11:31:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2000 TANK TOP UPGRADE
RECORD_ID
PR0232337
PE
2361
FACILITY_ID
FA0003599
FACILITY_NAME
ARCO AM PM #5569
STREET_NUMBER
3518
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
13002001
CURRENT_STATUS
02
SITE_LOCATION
3518 E HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HAMMER\3518\PR0232337\TANK TOP UPGRADE 2000.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. - PIPING PENETRATIONS: ALL PENETRATIONS OF THE SUMP TO BE ON A LINE TOWARD THE CENTER 8. - DROP TUBE CRITICAL DIMENSION: THIS DIMENSION IS CRITICAL AND MUST BE ADHERED TO. <br /> Sheet <br /> OF THE SUMP TO ENSURE THE PROPER INSTALLATION OF ALL BULKHEAD AND COMPRESSION FITTINGS CONTRACTOR WILL BE REQUIRED TO REINSTALL AT OWN EXPENSE OR WILL BE BACK CHARGED <br /> X71 het Notes AND RESULTANT WATER TIGHTNESS. ALL PIPING, CONDUIT AND GROUNDS THAT PENETRATE FOR EXPENSE TO CORRECT INCONSISTENCIES. <br /> 1. - SUMP PIPING PENETRATION$: THE SUMP SIDE WALLS MUST BE SEALED IN SUMPS. SUMPS SHALL BE HYDROSTATICALLY 9. - METHANOL COMPATIBILITY: FOR ALL METHANOL COMPATIBLE STORAGE SYSTEMS, ALL READILY <br /> SUMP PIPING PENETRATIONS SHALL BE MADE USING BULK HEAD FITTINGS 5. - TESTED WITH STANDING WATER FOR A PERIOD OF 24 HOURS TO INSURE THAT THE SUMPS ACCESSIBLE COMPONENTS WHICH ARE NOT METHANOL COMPATIBLE FOR THE IMMEDIATE <br /> ('ENVIRON'). <br /> PENETRATIONS <br /> COMPRESSION BE MADE ARE FITTINGS WITH SEAL-OFFS. NSTALLATIONGCHECKHLISTWBEFOREENGINEER MUST SIGN OFF CONTRACTOR WILL BE PAID. THIS TESTING ON THE TANK INTENDED SERVICE SHALL BE RETROFITTED INTO THE STORAGE SYSTEM. <br /> (I.E. ENVIRON). 10. - MANHOLE CROWNS: ALL MANHOLE OPENINGS ON THE TANK SLAB SHALL BE INSTALLED WITH <br /> 2. - SIPHON PIPING: 6. - FILL AND VAPOR CAP HEIGHT TO GRADE: THIS DIMENSION IS CRITICAL AND MUST BE ADHERED TO. A i-1Q2" CROWN OF CONCRETE TO PREVENT WATER INTRUSION INTO THE MANHOLE. <br /> THE HEIGHT OF PENETRATIONS INTO SUMP FOR SIPHON PIPING VARY BETWEEN TANKS. CONTRACTOR WILL BE REQUIRED TO REINSTALL AT OWN EXPENSE OR WILL BE BACK CHARGED FOR SEE S CTION A ON DWG. TK3-5. THE OWNER'S ENGINEER WILL BE REQUIRED TO SIGN <br /> SEE DETAILS #6, #7 & #8 ON DWG. TK3-2 FOR TANK SIPHON PIPING DETAILS. EXPENSE TO CORRECT INCONSISTENCIES. OFF ON THIS ITEM ON THE TANK INSTALLATION CHECKUST BEFORE CONTRACTOR WILL BE PAID. <br /> 3. -PIPING TESTING: TESTING OF THE SECONDARY CONTAINMENT PIPING IS REQUIRED, THE 7. - TURBINE SUMP SENSOR: SEE SHEET TK4-2, DETAIL #1 FOR LIQUID SENSOR DETAILS. SENSOR TO 11• - U.G. CONDUIT: ALL U.G. CONDUIT TO TANKS SHALL BE RIGID STEEL GALVANIZED (RSG) <br /> SEALING BOOT IN THE SUMP IS TO BE INSTALLED WITH THE VALVE TURNED DOWN. BE MOUNTED AT SIDE OF TANK WHERE PRODUCT PE ETRATION INTO SUMP IS MADE AND BELOW SCHEOULE 40, <br /> AFTER <br /> NG 0 THE THE VALVE <br /> ISR TO BE <br /> PIPING <br /> TO ALLOW DRAINAGE OF THE SECONDARY LOWEST PENETRATION FITTING WITHIN SUMP AREA.R. 12. - RISER GROUNDING: RISER GROUNDING: ALL RISERS IN THE FILL SUMP AND THE ANNULAR C (d <br /> SPACE RISER SHALL BE GROUNDED AND BONDED PER DETAIL #4 ON DWG. TK4-2. C. ^� ®ry <br /> TANK LEVEL GAUGE t0.. U V/ 0 t!1 <br /> INACTIVE SIPHON NOTE TO CONTRACTOR C I <br /> (IF INSTALLED) SLOPE AS SHOWN ON CONTRACTOR SHALL VERIFY RISER SPACING IN <br /> DETAIL #10 ON DWG. TK3-2 FIELD. WHERE REQUIRED, CONTRACTOR SHALL C <br /> ISTI DOUBLE ALL PROVIDE AND INSTALL 45' ELBOW AND ASSOC- <br /> >- 8 8 B 20 - ATED PIPE FITTINGS TO BRING THE VAPOR O W <br /> aw <br /> 0:1 21 DUCT 4"+ L <br /> p /� 16 12" _ RECOVERY RISERS TO THE PROPER SPACING, U <br /> o I I Ell AS ANK TK3-1 / / FILL AND VAPOR RECOVERY RISERS MUST CIE <br /> d <br /> 'EE NOTE R F, �IE •a-. <br /> ' IPE PUJG wlw -+ EE NOTE BE SPACED AS NOTED TO ALIGN WITH Q <br /> AUG NO W '^ '� 22 ww SPILL CONTAINMENT MANWAY, <br /> I S LL& o: 15 ILL ADAPT R SUMP M I RING 2" f ENT 2 3 .y.d 0 / \M,, <br /> al CAP IN I LIQUID S N R 18 0 1 0 / \ Q v <br /> TANK L L 5 DI AINMENT BOX SEE NOT 2" PIPE PLUG IN 4"X2" �4'yry✓ fre�y <br /> GAUGE I ') 11 10 IFDOUBLE TAPPED BUSHING a J > '� Wr^ <br /> (IF INSTA ) (TYPICAL W/INACTNE SIPHON) z ")'� Q W <br /> 24 1 1 0J <br /> 12 - - NEW :::" JNION I 12 13 <br /> I m ISCR'l EIACK STEE a 2O <br /> ALL I Q t IHOLE AC COVERS I 5 „ PIPE C END TANK CONNECTION FOR SIPHON O -4.1 O <br /> TO W GRADE I LL BE I SYSTEM SHOWN HERE, SEE DETAILS (� <br /> 4"X3 POR REC Y ADAPTE 6 LIq IGHT AND KABLE - AND TIGH LY #6 AND #T ON DWG. TK3-2 FOR TURBINE <br /> A _ & C SPILL NINNMENT NEW NION PICAL I CTNE SI H N) AND PASSIVE SIDE CONNECTIONS A <br /> k2--1 FILL 0 . (NP.) SCR' ACK STEE I SEE DETAILS #8 & #9 ON DWG. TK3-2 2-1 d �( <br /> 2" FROM FOR MIDDLE TANK SIPHON CONNECTIONS. U <br /> 8" ACC PORT H <br /> 8 <br /> 22 8 D FITTI <br /> n v' TK3-1 SE TE #1 <br /> T TO SCA <br /> (21 1/2" CABLE GRIP 1 lLj - a- <br /> SEALS SUPPLIED i6 SEE CONTRACTORS NOTE, THIS SHEET 6 4" PVC THREADED <br /> W/ SENSOR 12 18" 18" 8A 4 PIPE CAP <br /> Cd <br /> 1-1/2" MIN. CROWN SEE NOTE #5 --� 26" I.D. 12 J <br /> (TYPICAL ALL OPENINGS, (TYP.) 3/4" MIN. CROWN ( ) <br /> UNLESS NOTED OTHERWISE) 4-1/2' TO 6" NP' (TYP.) SET AT 6" MIN. A.C. PAVING <br /> v • • _ 12" MAX. <br /> --a.— T— .i_— — _i_-•:ee • • :7 - - -- - - - 1,_ _,y_ _� — _i_ _; — _ —r — .:.T _r — �:..-:i -rr-�' • �L._•.,.y_ - -.:•—' — _1 • • : �` <br /> •.; '• - I 3" MIN. <br /> SEAL OFF I :v"' ? ' ''�' <br /> .• r, tP: '.!`••}". .- SEE NOTE #1 23 y"":?•y. PEA GRAVEL <br /> 5 GALLON SPILL4.. !Y <br /> 3 4" COND. I U <br /> I,6QP TO SUMMP CONTAINER WITH 3" MIN. ;SEAL OFF J-BOX <br /> (SEE NOTE #10) I IN LINE DRAIN J-BOX PEA GRAVEL 3/4" CONDUIT (� <br /> 4" BLACK STEEL-- 1 4" BLACK STEEL (SEE NOTE #10) '•. y t1 20 <br /> RISER PRIMED AND RISER (SEE NOTE #11) � 23 23 SIPHON PIPING ' <br /> WRAPPED TO GRADE 3 4" CONDUIT 23 I 4 <br /> I // 3" PVC PIPE OPEN W <br /> TL ORANK BETWEEN AT BOTTOM _ ---- SEE NOTE 2 ry� <br /> I TANKS IF GAUGING ' � <br /> I NOT INSTALLED - - - -{- - 2 4" x 12" L BLACK STEEL " SEE NOTES 2 <br /> I (W/ PULL STRING) I RISER W/ PIPE CAP I #-4-&-#5 21 v� 13 z <br /> (SEE NOTE #10) TURBINE CONTAJNMENT AND FILL SIDE SUMPS (SEE NOTE #11) 2" VENT & V.R. PIPING <br /> (FURNISHED BY TANK MANF.) FIELD BOND TO d Q <br /> 1 TANK COLLARS, SEE DETAILS #1 & #2 2" BELL x MALE p > 14" C <br /> 23 3 ON DWG. TK3-1 FOR CURRENT STANDARDS O3 --- t0 ^ ADAPTER - '� _j ".`rte <br /> Tl <br /> ZZ <br /> 22 ZZ <br /> SEE NOTE #1 ��\\ C z $ o' <br /> 17 SUMP MONITOR <br /> LIQUID SENSOR 18 I I BACK FILL \\\•"•. Q (lS <br /> SEE NOTE #6 PEA GRAVEL/ \ ••,• J Q <br /> CRUSHE � <br /> AS PER TANK \\ \ W W Q <br /> MANE SPECS. \\ \ vi <br /> 2 3 1 l 1 5 6 7 8 9 10 11 12 i l i ili 15 16 (TVP,) \\\�\\ C 0 U <br /> N � <br /> II I 111 { I Q c � <br /> EXI ING TANK �- <br /> 1I 1 I I III 1 1 f!J ao ® C ° <br /> I I 1 I I II IjI <br /> co a <br /> j ILL I III I I ff 1 ® (n �•-6 <br /> TANK LEAKEXISTING 12"x12"xl/4" STEEL <br /> DETECTOR 45o PROTECTION PLATE-TYP. ALL <br /> • , \ \ I LIQUID SENSOR OPENINGS ON FIBERGLASS <br /> TANKBY TANK MANUS <br /> :. <br /> TANK (BY 2" BLACK STEEL <br /> IX IPHON PIPE <br /> N2 �cai <br /> •ey:• .y;•. SEE NOTE #10 9 TRAPPER SCREEN (TYP.) <br /> WRO <br /> master reeasa date <br /> NO.. DATE { , REVISIONS PROJECT RELEASE proj. exe, drawn by <br /> PERMIT- 9/19/00 J.V, <br /> _ project / facility <br /> BID 5569 <br /> Underground Tank Section - <br /> �� CONST. sheet / rile __ <br /> NOT TO SCALE: TK-2 - <br /> AS-BUILT of <br /> - . Ak10'J76/. kLF oPIW/u'd�/1 2.1,t.;1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.