My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2000 TANK TOP UPGRADE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3518
>
2300 - Underground Storage Tank Program
>
PR0232337
>
INSTALL_2000 TANK TOP UPGRADE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2021 4:30:07 PM
Creation date
11/5/2018 11:31:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2000 TANK TOP UPGRADE
RECORD_ID
PR0232337
PE
2361
FACILITY_ID
FA0003599
FACILITY_NAME
ARCO AM PM #5569
STREET_NUMBER
3518
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
13002001
CURRENT_STATUS
02
SITE_LOCATION
3518 E HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HAMMER\3518\PR0232337\TANK TOP UPGRADE 2000.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TAIT & Associates, Inc. <br /> Architecture • Engineering • Environmental <br /> April 7, 2000 <br /> Via: Overnight <br /> Mr. Michael Kith <br /> San Joaquin County <br /> Department of Environmental Health <br /> 304 East Weber Avenue, Third Floor <br /> Stockton, CA 95202 <br /> Phone (209)468-3446 091; <br /> RE: ARCO AM-PM APR 10 1 <br /> 3518 E. Hammer Lane 2000 <br /> Stockton, CA 95202 ENVIRONMEN'A' HEALTH <br /> TAIT Job # AR109111-5569 PERMIT/SERVICES <br /> Dear Michael: <br /> On behalf of our client, ARCO Products Company, we wish to apply for a permit for the <br /> above location. Enclosed is our submittal package. <br /> 1. Three copies of the Closure Application and Installation Application <br /> 2. Application fee of$ 858.00 ($ 624.00 installation and $ 234.00 closure) <br /> 3. Detail sheets <br /> 4. Three sets of plans <br /> 5. Monitoring and response plans <br /> 6. Method for inerting the pipes <br /> The scope of work will involve the following. Remove and replace the gasoline dispensers <br /> with new dispensers. Demolish the existing dispenser islands and construct new islands. <br /> Install new product and vapor recovery piping as needed from the dispenser islands to the <br /> storage tanks. Install new turbine sumps at top of tank. Please send a copy of the permit to <br /> my attention. <br /> In an effort to reduce some plan check comments that may arise I would like to provide the <br /> following statements: <br /> 1. Any concerns about the depth to grade of the dispenser sumps and piping will be <br /> evaluated at the time of excavation. If it is determined that the existing conditions do not <br /> provide proper piping slope details for piping low point including monitoring equipment <br /> will be provided to San Joaquin County Environmental Health. <br /> arc application-f <br /> 2880 Sunrise Blvd. • Suite 206 • Rancho Cordova, California 95742 • (916)635-2444 (916)635-2606 fax <br /> Other OfficesSanta Ana • San Diego • Concord • Phoenix • Tucson Reno <br /> www.TAlT.conn <br />
The URL can be used to link to this page
Your browser does not support the video tag.