Laserfiche WebLink
U � <br /> 2. We wish to provide the same statement as above for any concerns regarding the tank <br /> hold-downs and buoyancy calculations. <br /> 3. In the event the pea gravel is found to be contaminated such material will be hauled <br /> away. E.C.I. will be used for the waste hauler and the disposal site. <br /> 4. The line leak detector is integral to the Red Jacket Turbine Pump CPT-3. Detail sheet is <br /> included. <br /> 5. Sump sensors and dispenser probes will provide positive automatic shutdown of pump <br /> system. <br /> I am currently in plan review with City of Stockton Building Department, City of Stockton <br /> Fire Department and San Joaquin Valley Unified Air Pollution Control District. Please call <br /> me upon your review and let me know if I can provide any additional information or if any <br /> other agencies are involved. Thank you for your help with this project. <br /> Respectfully, <br /> e <br /> ASSOCIATES, INC <br /> ngione <br /> Engineering Assis nt <br /> //atc application-f <br />