Laserfiche WebLink
6 <br /> 4 <br /> SUMP LID — <br /> 26" I.D. <br /> TYP <br /> 27 3/8" OD <br /> - - - - - - - - - - WATER TIGHT COVER <br /> ••o. ; 4 4 - 3/4" CONDUIT J-BOX SEALING BAND NOTE: <br /> -� • b SEAL OFF CLAMP CONTRACTOR SHALL BE HELD RESPONSIBLE ` <br /> 3" MIN TO LEAK DETECTION MONITOR PAN — FOR PROPER INSTALLATION PREPARATION PER /•► a N Q <br /> 5 2 CONDUCTOR #18 SHIELDED CABL MANUFACTURERS INSTRUCTIONS AND SHALL O <br /> IN RIGID METAL OR PVC SCH. 40 CONDUIT. REINSTALL SUMPS IF HYDROSTATIC TESTING L. L,. 0 <br /> SHOWS LEAKING IN THIS AREA OF THE SUMP. <br /> 8A 8 NEW 2" UNION, THREADED I //''�� V - <br /> BLACK STEEL 2 WIRE SHIELDED CABLE 26" I.D. ACCESS. LL 'U "" N <br /> 9 OPENING E .r ,� O <br /> 23 3//4" CONDUIT TO TURBINE, L r� <br /> RIGID, PVC COATED 3" PVC PIPE OPEN I RISER TOP O (� 1 ` <br /> AT BOTTOM MOUNTED F.R.P. RISER TOP O� (k C <br /> J-BOX 0 � i0 SUMP WALL i � `J vv W <br /> _ 48' ID SEE TOP JOINT �� �� ADHESIVE w ^ <br /> �.J _ -_ _- - - - _ SEAL ANY PENETRATIONS— .+ <br /> — MADE INTO SUMP i TEMP. ALIGNMENT SPACER <br /> 10 21 = a I (S PPLIED W/ Q (� y� r" <br /> 3 20 �. ATTACHED IN FIELD TO \ KIT �'r/^� _ <br /> PRODUCT PI LNG 3 I MANHOLE SKIRT (TTP 4 FL") - _ '� I I co n <br /> - - REMOVE AFTER INSTALLATION — rn I I '� <br /> 48" SUMP <br /> 2" BELL & FNPT Z ACCESS OPENING <br /> --� (0 <br /> - Y I '� I SLIP ON <br /> 11 ADAPTOR j i MIN C - I RISER � '^ <br /> J F.R.P. RISER -__--_ � � O <br /> - ---VEEDER ROOT <br /> 22 UOUID SENSOR I ((gg -yI/\ ABOVEOiE r <br /> -- NOTE: •� Wy KPT i I RISE ON (� � N <br /> F.R.P. COLLAR r•r.. <br /> RISER T}•�{� <br /> 1" MIN. FROM BOTTOM OF SUMP AN ADHESIVE VJ <br /> ONLY PRODUCT PIPING IS SHOWN IN COLLAR <br /> THIS VIEW FOR CLARITY. LOCATED AT SIDE OF PRODUCT LINE I �'-�_� (S PPLIED W/ C <br /> ENTRY BELOW LEVEL OF BOTTOM OF 1J <br /> I BONDED I I KIT) Q <br /> ALL BLACK STEEL PIPE AND FITTINGS IN LOWEST PENETRATION FITTING. TO TANK I <br /> THE TURBINE SUMP SHALL BE CLEANED FIELD <br /> AND PAINTED WITH A HEAVY COAT OF ��,.-. — LAY-UP �Y" <br /> GREY EPDXY. L.L. Q <br /> JOINT DETAILS <br /> Sump Section ro <br /> Turbine Side Sump »-, <br /> Liquid Sensor at Turbine Sump <br /> NOT TO SCALE: �1 _ _ 2cc <br /> 1 NOT TO SCALE 0 <br /> NOTTO SCALE: ^ <br /> _J <br /> N <br /> 42" I.D. �" ^ �� 32" I.D. ACCESS <br /> s OPENING <br /> I I I I I NOTE: Cd <br /> CONTRACTOR SHALL BE HELD RESPONSIBLE FOR Q <br /> / PROPER INSTALLATION & PREPARATION PER <br /> \ / MANUFACTURERS INSTRUCTIONS AND SHALL (3) I VENT LINES — <br /> RISERS ?• T , T <br /> REINSTALL SUMPS If HYDROSTATIC TESTING COMMON EXTRACTOR/ �! D <br /> SHOWS LEAKING IN THIS AREA OF THE SUMP. FLOAT VENT VALVE <br /> I~ ASSEMBLY FOR STAGE II }T Z <br /> VAPOR RECOVERY AND VENT V/ Q <br /> SEE NOTE <br /> PIPING LOCATED IN SUMP (TYP.) C_ <br /> 42" ID ABOVE 'r 3" 2". _ '0 <br /> TEMP. ALIGNMENT SPACER — — SLIP ON 3" 3" 0.. — <br /> ATTACHED IN FIELD TO ADHESIVEIL � <br /> RISER _ <br /> MANHOLE SKIRT (TYP. 4 PLCS.) °m PP ED 2" 'Tt <br /> REMOVE AFTER INSTALLATION wW// KIT 3L V W Qm <br /> DIJHESIVE pFRO a3" (C{ Z E <br /> BONDED R)PPLIED W/ S 'y 2" ' Qf.R.P. RISER �`TO TANK TK-1 L. JACCESS OPENING IN� ACTORY OR W .7 vIELD LAY-UP FSO 00 W z <br /> La �� NR p 87 TK-2 <br /> F.R.P. COLLAR <br /> JOINT DETAIL Q\5 O C 'erT <br /> Q I— cd <br /> 87 Y <br /> 41 —INY7 <br /> TK-3 •(A Q ELO a <br /> 42 co <br /> Fill Side Sump <br /> � a <br /> NOTTO SCALE <br /> a <br /> UZ � U LL <br /> 0R <br /> Vent and Vapor Recovery � � a <br /> Schematic w <br /> NOT TO SCALE: <br /> master re ease do e <br /> NO. DATE REVISIONS PROJECT RELEASE prof, exe. drawn by <br /> 3/19/00 J.V. <br /> PERMIT <br /> project / 'facility <br /> BID 5569 <br /> CONST, sheet _TIle <br /> AS—BUILT _- 73-1 <br /> of <br />