My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
16
>
2300 - Underground Storage Tank Program
>
PR0231136
>
INSTALL 1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 11:50:32 AM
Creation date
11/5/2018 11:39:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1999
RECORD_ID
PR0231136
PE
2361
FACILITY_ID
FA0003610
FACILITY_NAME
A&A GAS & FOOD MART
STREET_NUMBER
16
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13902001
CURRENT_STATUS
01
SITE_LOCATION
16 E HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
08/04/99 15:55 FAX 125 251 8782 BaRGH USEN lk 005 <br /> vim•co, 1��� <br /> 01; 11 114b/115420 EHS ARM LA PALMA <br /> PAGE 06 <br /> MO ITO G ONS pI, <br /> CO ODU CQMFANYFA CJLJTV r <br /> jU <br /> SEC Y O A NT <br /> DE <br /> LM 'R RO SID)RA G , T S & PROD'UCT LINES <br /> S MFRSIS E P17 SHTJTb0WN <br /> ARCO Facility: 4932 _ Address: 16 East Harding Way <br /> Stockton, CA 95204 <br /> Czoq� 906- 9s/!� <br /> This plan is designed to <br /> Title 23,CCR. meet The monitoring and responSe requirements of Section 2632, Article 3, <br /> L MONI)CORING EOUIPMFN- <br /> Secondarily contained storage tanks and lines at this facility are Monitored by a oontirruous <br /> electronic leak detection system' which consists of an alarm paueI, <br /> electronics, Liquid scissors sensors and associated <br /> are installed in the annular space of each double wall tank and <br /> product Zine piping sump %elzever a sensor detects the prrscnee of a liquid there is both a <br /> visual and audible alarrn'at the control panel. In addition, the continuous monitor on the <br /> product piping system will shut down the pump and activate the al <br /> release is detected or if the continuous product pi alarm system when a <br /> disconnected,the pumping syst,�will shut down. p Mo <br /> system fails or is <br /> Automatic line leak detectors arc installed on the secondarily contained pressurized product <br /> pipes. The line leak detector will detect a loss of pressure in the product lines and restrict <br /> the flow of product <br /> 2• MA QME_N YCE SCAEDUL-E O 0Nl'>r(1I�TG F iTIT <br /> The continuous electronic Ieak detection system including line leak detectors will be <br /> inspected according to the ufseturer's instructions by an outside contractor once during <br /> each calendar year- <br /> 3. RQU TINE MONETO G R C DU E <br /> On a daily basis the facility'operator shall_ <br /> A- Inspect the control panel for visual and audible alarm signals to confirAll that <br /> the unit is operating. <br /> U. Inspect island and tank fill areas for-signs of spillage or petroleum sheen, <br />
The URL can be used to link to this page
Your browser does not support the video tag.