Laserfiche WebLink
08.01.99 15:55 FAX 425 251 8782 BaRGH USES boos <br /> "•• _ 1 r 1 v O/U:J 41 U ttls ARCO LA rAZMA PAGE 67 <br /> C. Record the inspection observations on the Daily Visual Monitoring Log <br /> (Form.APPC-765: attached.) <br /> 4• RESPO PAN <br /> O ERA O RF_$P0Ns1BLLMFS <br /> A. LEAK RECORDING AND REPORTING PROCEDURE <br /> Whenever an alarm is activated, station personnel are to immediately- <br /> a. Contact ARCO Maintenance or its designated agent by using the <br /> telephone number previously provided. <br /> b. If aaY visible iadications of petroleum products or vapors are noticed <br /> call 911. <br /> c• Make an entry in the Recordable Discharge Log (Form APPC-765-1 <br /> attached) indicating the action taken <br /> d. Complete the Recordable Discharge Log when and as the source of <br /> the alarm is known. <br /> ARCO RF.SPONSIBiT-M[ S' <br /> B. WTHOD OF-REMOVING AN UNAUTHORIZED RELEASE FROM THE <br /> SECONDARY CONTAINMENT <br /> a• . AnY unauthorized release unto the secondary containment system of a product <br /> tank'-viU 11Ze removed-by PumPing• Uncontaminated product may be returned <br /> .to the tank_ Contaminated product may be returned to the refire <br /> ery recycled or may be disposed of following procedures i <br /> o to be <br /> n accordance with <br /> California Health Safety Code mquirements. <br /> b. . ARCO Mainter=`c will be responsible for authorizing and selecting <br /> contractors for the work to be performed. <br /> 5. TR_A G_ <br /> In addition to the training covering subjects mentioned in Sections 3 and 4 above, trailling <br /> needed for the operation of the tank system and monitoring equipment includes- <br /> How to: <br /> - Take tank levdl measurements <br /> Read dispenser meters <br /> Inspect equipment <br /> Recognize warning signs: dispenser hesitations, meter spins and odors <br /> Manually close dispenser impact valve <br /> Rcplace dispenser filters <br />