0 s 1]0 20 _General Notes
<br />PIPING LEGEND
<br />NEW 2 F.C. DOUBLE WALL PRODUCT PIPING
<br />6' HIGH MASONRY WALL NEW 3" AND 2" FG. SINGLE WALL VAPOR RECOVERY PIPING
<br />i
<br />SCALE V= 10'-0" EXISTING4f NEW EXISTING 2" F.G. SINGLE WALL VENT PIPING (LOCATIONS ASSUMED)
<br />EXISTING/NEWCONOUIT (LOCATIONS ASSUMED) Or
<br />PAY TELEPHONES EXTENT OF NEW CONCRETE TANK SLAB ME BE REPLACED
<br />TEMP POWER
<br />TRASH ENCLOSURE PANEL FOR ON
<br />MW
<br />- 28' C/L FENCE r�
<br />PANEL
<br />EOUIPMENT ENCLOSURE I EXTENT OF NEW ASPHALT TO BE REPLACED
<br />iL+ EXISTING I MC
<br />REMEr I�� EXTENT OF NEW CONCRETE WALK INSTALLED
<br />POWER DIATIOP! 'X MC
<br />1 X PIPING OR CONDUIT INTERCEPT POINT (CONTRACTOR TO DETERMINE) \ >` �`
<br />POLE
<br />EQUIPMENT MW I 1. THE GENERAL CONTRACTOR SHALL VERIFY EXISTING SITE CONDITIONS PRIOR TO BID SUBMISSION r: C c W O
<br />TO REMAIN � U � � �
<br />2, ALL DIMENSIONS AND CONDITIONS MUST BE CHECKED AND VERIFIED IN THE FIELD BEFORE STARTING ANY WORK. •L
<br />- ANY DISCREPANCY SMALL BE CAI LED TO THE ATTENTION' OF THE OWNER'S ENGINEER FOR HIS DECISION BEFORE ," t J
<br />I PROCEEDING WITH THE WORK.
<br />/ U N 0 0
<br />r � o
<br />GP ` CB
<br />MC \ J i 3. ByINSTHE STATION AND TESTING OF PIPING AND SHALL BE PERFORMED O A LICENSED TANK SERVICE PROVIDER AS REQUIRED
<br />\ OY THE STATE AND LOCAL REQUIREMENTS. CONTRACTOR SHALL PROVIDE NOTIFICATION i0 THE JUR6DICTIOIJAL lV
<br />EXISTING -1� o
<br />I � � EXISTING EXISTING PRICE/ID LOT LIGHT I _ 4 AGENCY RESPONSIBLE FOR INSPECTIONS ACCORDING 70 THE PERMIT REQUIREMENTS.
<br />ALL ELECTRICAL- WORK PERFORMED WITHIN CLASS I HAZARDOUS AREAS SHALL BE SEALED PER NEC AND UFC V "
<br />MW REMEDIATION SIGN I REQUIREMENTS. O
<br />EXISTING PIPING (TYP.) C
<br />O� REMEDIATION TO REMAIN S. THE PRODUCT PIPING LAYOUT SHOWN ON THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND ARE NOT U g
<br />PIPING (TYP.) WASTE OIL I INTENDED TO BE AN EXACT REPRESENTATION OF THE PIPING LAYOUT. GENERAL CONTRACTOR TO RELOCATE, C L
<br />Tr
<br />TO REMAIN TANK MODIFY AND ADJUST PIPING INSTALLATION TO PROVIDE A SYSTEM CONSISTENT WITH THE INTENT OF THE DESIGN. \/// `/ ^` y�
<br />,JI TO REMAIN GENERAL CONTRACTOR SHALL PREPARE AS -BUILT" PLANS UPON THE COMPLETION OF THE INSTALLATION, O.✓ Od U' N✓ �..F.
<br />MW V
<br />1LV _ AIR IIP;f, I 6. ALL UNDERGROUND PIPING SHALL BE FIBERGLASS UNLESS NOTED OTHERWISE AND SHALL BE INSTALLED PER r
<br />i MANUFACTURERS SPECIFICATIONS. ow
<br />AIR /WATER > ca O
<br />i� DISPENSER 3 8 DED INSTALL
<br />SBy OWNER OBODEMENT REQUIRED FOR COMPLETE INSTALLATION WHETHER OR
<br />I - GP „GP RAISED DI _ '
<br />THE
<br />L V/
<br />DISPENSER ISLANDS j NOT THE GENERAL
<br />EOUIPMENT AST PROM
<br />(TYP. 4 PLCs.) mo LAWS
<br />CONTRACTOR CONDUCT THEIR LWORK TIIN OTHERS.
<br />WITH ALL FEDERAL STATE AND LOCAL O
<br />��xi-- -- -- - _G — -
<br />I � LAW AND REGULATIONS.
<br />4 Cowr,. sLAe w 2P 17 1s 1 W-- Installation Notes 0' -
<br />,JP MC al
<br />EXISTING (4) 2" DIA. BLACK STEEL 7 ]_�
<br />C, VENT RISERS TO REMAIN TK3-1 I I ��
<br />CL �� EXISTING (2) 12.000 GALLON MODERN WELDING SINGLE
<br />WALL
<br />TANKS TO REMAIN.
<br />TANK VENTS MODERN
<br />7 1Q000 GALLON LL GI_ CORNING SINGLE WALL FRP TANK TO BE REMOVED AND REPLACED WITH 10,000 GALLON �� ® V"
<br />MODERN WEDGING DOUBLE WALL GLASTEEL TANLDOUBLE REMAIN. SEE DWG. TK1-2. CONFIGURE PRODUCTS AS FOLLOWS; Y
<br />MC EXISTING MIDGRADE 89 OCTANE (TANK ((1) SHALL BE RECONFIGURED FOR UNLEADED 87 OCTANE, L_
<br />EXISTING VENT LINES
<br />EXISTING UNLEADED 87 OCTANE (TANK b2) SHALL BE REMAIN UNCHANGED /i • M
<br />TK3�3 M323 TK3-4 TK3-4 20 16 ISLAND BUMPER POST �'�"' ( THE ENVIRO TWO
<br />7 OCTANE TANS WILL BBELShED SHALL REMAIN E OCTANE. r1�IL.. J
<br />TO REMAIN18 NEW UNLEADED PREMIUM 92 OCTANE (TANK
<br />PHONED MAE SUMS TOGETHER ?0 PROVIDE FOR A BLENDING
<br />NEW ' TK3-4 TY'P. 4 PICS.) I NEW TURBINE SUMPS ON ALL TANKS. i
<br />VEFDER ROOT MC (TYP. SINGLE HOSE PER SIDE O INSTALL N(; 1/1/2 HP STANDARD TURBINE IN NEW 92 OCTANE TANK (TANK n3. c
<br />MCP' - ALARM 4'GNIi OR -i BLENDING 3 PRODUCT MPD) I EXISTING 2 3/4 HE RED JACKET TURBINES (TANKS #1 & #'2) TO BE RETROFITTED WITH 1-1/2 HP MOTORSREMAIN, INSTALL � �� 0
<br />�ISTLM r SIPHON CHECK VALVES ON TANK j)1 & f)2 TURBINES. TANK #1 SIPHON CHECK USED FOR CONDENSATE TANK EVACUATION. v
<br />m
<br />65'-0' � I
<br />MONITORING WELL 10 I w - ---- �-- _ __- __ - __. __ � i � TANK �2 SIPHON yCHECK USED FOR PRODUCT SIPHON BETWEEN TANKS k1 & N2. INSTALL ACTIVE SIPHON PIPING BETWEEN
<br />(TYP. 4 PICS.) c I \' _ UNLEADED
<br />THEPNI� AND
<br />DU UNLEADED
<br />K N2)) INSTALL 2" DOUBLE WALL PRODUCT LINE FROM TANK #1 1 TO TANK (f 2 AND '' % 0)
<br />g - #1 SUMP. INSTALL BACKFLOW PREVENTION CHECK VALVES IN PRODUCT LINES #1 & b2.
<br />NEW TANK SLAB 1q EXISTING 2 % /' „ // i , w1w� 0 CONTRACTOR SHALL FIELD LOCATE, INTERCEPT AND ROUfE EXISTING-COJNDURS TO PuReINE' LOCATIONS/ '
<br />ARCO AM PM y / C' / \/ /. / �: 1 CONTRACTOR TO VERIFY THAT EXISTING WIRING MAY BE REUSED. PULL NEW WIRE FROM PANELBOARD, -- (�
<br />r rrrLLL+rrr
<br />EXISTING 27 / / % //� O I IF REQUIRED. CHECK CIRCUIT BREAKERS IN PANEL, REPLACE IF NEEDED, ALL ELECTRICAL WORK SHALL
<br />G REMEDIATION 30' 4" m i� °1" "' / 7Z / wl % / NOONFORM TO THE UNIFORM ELECTRICAL CODE 1994 EDITION AND TO ALL LOCAL REQUIREMENTS.
<br />/ % E THAT EXISTING CONDUIT LOCATIONS ARE ASSUMED.
<br />i
<br />PIPING f - - - __... - ✓ EMERGENCY PUMP / 4 CONTRACTOR TO INSTALL TI4REE (3 4" DUAL POINT FILL ADAPTERS AND CAPS. INSTALL THREE (3 3" DUAL
<br />o .Q.. TO REMAIN - / I SHUTOFF SWITCH f m ,"4 O ))
<br />(INDOOR & OUTDOOR) / // �f/ �� / I POINT STAGE I VAPOR RECOVERY ADAPTERS AND CAPS. CONTRACTOR TO INSTALL NEW FILL SIDE 5 GALLON '��..((
<br />- TO REMAIN LOCATE TO SPILL CONTAINMENT BUCKETS AT FILL S1DE W/ INTEGRAL INLINE� DRAINS BACK TO TANK. INSTALL RISER ISOLATION JACKETS _aj R/
<br />a ( 48" A.F.F PER CODE %,/ /
<br />+H-
<br />E,
<br />'I _ /� I //� �Y ON ALL UNPROTECTED RISERS FOR CORROSION PROTECTION. SEE DETAIL #'1 ON DRAWING TK3-1. /yam
<br />^ - _ �/� J� / / 3Z of " 18 / 18 INSTALL 3" SINGLE WALL STAGE 11 VAPOR RECOVERY LINE FOR "BALANCE" VAPOR RECOVERY SYSTEM. SLOPE 1/8" PER FOOT 1�
<br />ICE
<br />3 ,! ANNULAR SPACE TYP. / / - MINIMUM TO NEW CONDENSATE TANK SEE DETAILS AND SECTIONS ON DWG. TK3-3. INSTALL NEW STAGE If VAPOR RECOVERY
<br />} STAGE I VAPOR RETURN (THP.) 4_ I I / ` 7 NEW STAGE II VAPOR RECOVERY J WGU7 LIN TSC 756 LONDENSAIE 1ANK TO ACCOMMODATE THE LACK OF FALL FROM THE FURTHEST DISPENSER TO THE TANK FIELD. SEE �rI
<br />,I I \ DOUBLE WALL CONDENSATE �' / -� �! C,,/ INSTALLATION DETAILS ON DWG. TK2-3, l�V
<br />O FILL (TYP.) o—' / -\ n- - TANK W/ MONITOR O"/% (/ 19 i / 2 -^ I� INSTALL TWO 2' DOUBLE WALL PRODUCT LINES. LINES TO BE EQUIPPED WITH MECHANICAL LEAK DETECTORS (3 GFH) LL
<br />, - 5` / 4) 1®I �J-1 i�TSM WIRED OD A LIQUID
<br />ITTURBINE SHUTDOWN, ILGPEL IE/B') PER THE
<br />F00T TURBINE
<br />M NIMUM 10 TANKSATSEEH DING TK4E 11 FOR WIRING
<br />J m /'` REVERS OOR / / III x �Jl y DIAGRAM. PIPING SHALL BE INSTALLED PER MANUFACTURERS RECOMMENDATION AND INSTRUCTIONS.
<br />z
<br />NEW TANK 1 a I III. / �' / sWw2 / / dJ_
<br />STAB I i n I,I % z I/ 1- / % ' 2 / _{ �- 1 I � RECONNECT EXISTING THREE (O E SINGLE WADI FIBERGLASS VENT LINES O TANKS (IFOV REQUIRED), CONTRACTOR E VERIFY
<br />Ii\ ,8 0 /% i / 19 THAT THE TERMINATION POINT OF EXISTING TANK VENTS TO BEA MINIMUM OF 17 ABOVE GRADE, 30 INCHES ABOVE ROOF
<br />I /
<br />i
<br />I'
<br />LINE AND NOT WITHIN 5 FROM ANY BUILDING OPENING OR PROPERTY LINE THAT CAN BE BUILT UPON MJD IN ACCORDANCE
<br />i \ V j � ¢ I'3 ,- I I �� I / Y ,'! 17. O WIN UNIFORM IRE CODE REQUIREMENTS SEE_DETAIL a4 ON DRAWING TK3-1.
<br />INSTALL THREE 3 VALL (3)RNE ANNULAR SPACE MONITOR SENSORS AT DOUBLE WALL TANKS y1 & {IN SEE DETAIL b2
<br />�� I � ON JAG TK4-2. INSTALL (3) NEW 1UR8INE SUMP SENSORS AT NEW TURBINE SUMPS, WIRED FOR TURBINE SHUTDOWN.
<br />AN LAR y�PACE (rYP.) - h' a m'�i l 0 INSTALL 2' DIA. ACTIVE SIPHON -BETWEEN 87 -OCTANE TANKS AS SHOWN. -- -^ -"-- -'
<br />^=. SEE DETAILS 6, 7 AND 8 ON UWG, TK3-2.
<br />fa / _/ MW,' I N 8 N
<br />STAGE I VAPOR RETURN (TYP.)�- %� �/��' � !; � �- I I � I /' INV O 9 � 18 �
<br />^ _ FILL (TYR )�- G
<br />a
<br />6' CFENCE % iD zoo
<br />ENCLOSURE
<br />0
<br />r�
<br />z
<br />OR
<br />o I-
<br />ID REINSTALL FOUR (4) INSPECTION/MONITORING WELLS AS SHOWN. W
<br />11 INSTALL NEW VEEDE.R ROOT TANK AND LINE LEAK MONITOR AND ALARM CONTROL PANEL MODEL TLS -350 IN
<br />TO BUILDING \ \
<br />f�LI IfAL CB BUILDING SEE DRAWING TK4-1 FOR LEAK DETECTION AND DISPENSER WIRING DIAGRAM
<br />2 VJ, `yW^.+
<br />CTR�PANEL 15 �
<br />TO BLILT>NG r = _ 1 12 INSTALL STATIC GROUNDING SYSTEM AS PER DETAIL #4 ON DWG. TK4-�
<br />D I ELECTRICFC �PAh'EI- �. � � I "L
<br />( .. 13 F CONTRACTOR TO BACKFILL EXCAVATION WITH PEAGRAVEL IN 12" LIFTS. REUSE OLD BACKFILL
<br />` 1 g /y
<br />A� '��� y - _�-D@7�18MON �� .. � lJ G
<br />I
<br />MC CID CONTRACTOR TO INSTALL NEW 6 CONCRETE TANK SLAB AND REINFORCING E LOCATIONS SHOWN. .�
<br />ET MANHOLE
<br />TO PROVIDE REHAB CAGES AT MANE{OLE. LOCATIONS. INSTALL NEW TURBINE AND FILL SIDE MANHOLES.
<br />ser r.{AN'HOLE covERs 1-1/2" ABOVE SLAB. ITL
<br />o -'� / 9�ACTNE SIPHON 15 CONTRACTOR TO INSTALL NEW SIDEWALK AS SHOWN. EXISTING SIDEWALK TO BE WIDENED FOR HANDICAPPED ACCESSIBLItt. rf
<br />�6 j EXTEND SIDEWALI( _ C W
<br />'E o xGP y/ ( 2 3 TURBINE (TYP) 21 21 / / / FOR ACCESS J.\� 16 CONTRACTOR INSTALL- NEW STEEL DISPENSER ISLAND FORMS AND CONCRETE PUMP ISLANDS.
<br />s w I /). X ( -h - +3 D i 23 !NSIWLL NEW IN -LIN 1 SEE DETAIL 77 ON DWG. TK3-4. ,
<br />I MCI ' 9 % PIPING SUMP 'J// Q P CONTRACTOR i0 INSTALL NEW CONCRETE DRIVE SLAB AND REINFORCING. CONTRACTOR TO INSTALL NE'W TANK SIAB5 AND REINFORCING,
<br />SGP 1 \ J MC\ MC_ IMC NEWPHANDICAPPED ,NEW HANEL A RED -3 MONITOR (87 OCTANE) o SEEE DRAWCONTRACTOR T DOWEL INTO EXISTING CONCRETE DRIVE SLAB AT PIC UNITS W '4" x I8" STEEL BARS AT 16" O.C. wed
<br />/ ll/ 101
<br />]� - - -- - 110' 2" -/ /-1 SIGN `, 18 CONTRACTOR TO INSTALL (4) FOUR GLBARCO B78, SINGLE HOSE PER SIDE, BLENDING MVLTI-PRODUCT DISPENSERS
<br />- - AS SHOWN. DISPENSERS TO BE FITTED WITH BALANCE STAGE II HOSES AND NOZZLES, BREAKAWAY VALVES AND
<br />TURBINE (TYP.) p 3 (- - - --- -. _. - T UNDER DISPENSER CONTAINMENT INCLUDING PRODUCT AND VAPOR SHEAR VALVES AND MONITORING SENSORS. `y
<br />'�.. ENT & STAGE II ' --- - - - - --" - _ -- --- --- - ---- . ^e-_.- _ 26 1 / / SEE DINGS, TK3-3 AND TK3-4 FOR TYPICAL INSTALLATION DETAILS •k-
<br />V
<br />___ I E (�J LL
<br />-
<br />PER RECOVERY MW ; NEW HANDICAPPED EXISTING PRICE ID i CONTRACTOR SHALL FIELD LOCATE, INTERCEPT AND CUT EXISTING CONDUIT ROUTED TO REMOVED
<br />PARKING (VAN ACCESSIBLE) I DISPENSERS AT A CONVENIENT LOCATION. REMOVE ALL WIRING BACK TO PANEL. CAP AND ABANDON
<br />W MW - 1 MC / TO THE NNEWSDISPENSNOT ERS REMOVE ALLNG REUSED HBREAKERSECK UINOTTB NG REUSEDS IN . REPLACEL FOR R BREAKERSIFNEEDED.
<br />SIGN ! ALL ELECTRICAL WORK SHALL CONFORM TO THE UNIFORM ELECTRICAL CODE 1994 EDITION AND TO ALL
<br />o 'MC a C m
<br />c f LOCAL REQUIREMENTS. NOTE THAT EXISTING CONDUIT LOCATIONS ARE ASSUMED m
<br />GP„ OF '�'qP ''!' GINE CONDUIT OUTSSHALO USED FOR NEW DISPENSER POWER AND COMMUNICATION AND ONE CONDUIT FOR GISPENSER
<br />y1'K �TI1Fi INTERCOM. REROUTE CONDUIT AT BUILDING TO ACCOMMODATE INTERCOM LOCATION AT SALES COUNTER. „r( G .0
<br />MG I r e�1J
<br />DISPENSER START UP BY MANUFACTURERS REPRESENTATIVE. CONTRACTOR TO PURGE LINES WITH 200 GALLONS PER HOSE 0 a
<br />EXISTING OR M` W IF qBa�.�, -. MINIMUM. ANY AIR POCKETS OR START UP PROBLEMS DUE TO IMPROPER INSTALLATION OR INCORRECT WIRING THAT E O o
<br />REMEDIATION "C U .� 13
<br />n MC''' PAN PIPING (TION */�• DESTROYS ELECTRONICS WILL BE BILLED BACK TO THE CONTRACTOR. C L_
<br />TO REMAIN {s,�/�+ '` 19 CONTRACTOR TO 'TOUCH UP/REPAIR ANY DAMAGE TO CANOPY COLUMNS FROM THE REMOVAL OF STEEL OVERHEAD HOSE W
<br />a EXISTING ''\\ 7 'y3P7 / yV jek RETRACTOR BARS AND OR SPANDREL SIGNS AS REQUIRED O t
<br />LOT LIGHT I'I `lsFAI TR(`kk�. 20 CONTRACTOR TO INSTALL (4) NEW ISLAND BUMPER POSTS. SEE DETAIL Hf6 ON DWG, TK3-4. 'M'� W -0 M u
<br />z PLANTER MW {h
<br />/ ON AND ALL OTHER � U c
<br />f EXISTING PLANTER L�- DAMAGED ASPHALT ON SITE SAWCUT CLEAN ALL ADJACENT ASPHALT IN REPAIR AREAS BEFORE PATCHING. SLURRY O
<br />(j
<br />AIM i 21 CONTRACTOR TO PATCH AND REPAIR ALL ASPHALT AFFECTED BY THE NFW TANK AND PIPING INSTALIAT!
<br />CO
<br />I /-1 COAT ALL ASPHALT ON SITE AND RESTRIKE PARKING SPACES / ' N
<br />MC T58 TSB 22 EXISTING PL, (PAY ISLAND CASHIERS). 70 REMAIN. '' I rT
<br />_ - - _ _ LdJ v, vJ a
<br />���(�P 23 CONTRACTOR TO INSTALL IN-L!NF PIPING SUMP TO ACCOMMODATE THE LACK OF FALL TO THE REMAINING 87 OCTANE TANKS AT HE SITE.
<br />JPr LJ MB TW (IF REQUIRED ONLY), ENVRON MODEL IUSS-2422 WITH ACCESS COVER INSTALL MONITORING SENSOR
<br />E O,
<br />F- TSB DRIVEWAY O IRED FOR TURBID SHUT DOWN
<br />z_ - BUS STOP SIGN ^
<br />— ` o Compliance Notes
<br />DRIVEwgy TSB T GENERAL CONTRACTOR SHALL OBTAIN NECESSARY PERMIT FROM THE DIVISION OF INDUSTRIAL SAFETY (STATE OF CALIFORNIA) K/�
<br />W
<br />FOR EXCAVATIONS OF TRENCHES 5 -0 OR MORE IN DEPTH INTO WHICH A PERSON IS REQUIRED TO DESCEND.
<br />,� P�✓
<br />v SIrMI, r ! Cell 7011 Free GENERAL CONTRACTOR SHALL PROVIDE 72 HOUR NOTIFICATION TO GOVERNING AGENCY PRIOR TO ANY REQUIRED INSPECTIONS. -
<br />_ _ TANK SYSTEM TO BE INSPECTED BY OWNER'S ENGINEER & GOVERNING AGENCY AT THREE 3 SEPARATE CONSTRUCTION O
<br />2
<br />r,,, 1-1300-422-4133 PHASES AS REQUIRED: SG��® y\
<br />-- _ 1. TANK AND PRIMARY PIPING HYDROSTATICALLY OR PNEUMATICALLY TESTED FOR 30 MINUTES.
<br />_ 2. INSPECTION OF ALL SECONDARY CONTAINMENT, INCLUDING TESTING, IN ACCORDANCE WITH MANUFACTURER'S GUIDELINES. `r7N 1 E�'P
<br />TWO 3. FINAL INSPECTION INCLUDING ALL PORTIONS OF THE LEAK DETECTION SYSTEM.. �+ ENGIN
<br />J; --- _--_ _ WORKING DAYS
<br />BEFORE YOU ALL TANK SUMPS AND UNDER DISPENSER URS TOMENT SUMPS SHALL BE S RE ATICALLY TESTED (LAKE TEST) WITH -u«D NI I`IIN6 aw DES:ca SPYALIETS'
<br />DIG STANDING WATER FOR A PERIOD Of 24 HOURS TO INSURE THAT THE SUMPS ARE WATERTIGHT. THE OWNER'S 1x215 12ND AVENUE SOUTH
<br />—� ENGINEER MUST SIGN OFF ON THIS TESTING ON THE TANK INSTALLATION CHECKLIST BEFORE CONTRACTOR WILL BE PPO. RENT, WASHINGTON28032
<br />-:_-
<br />-
<br />SION
<br />w - WV PLYMOUTH -- —�--�� —_ — o Sownern Cellrornm r ALL AGENCY
<br />PRIOR ALS TO TAN ESYSTEM BEING PLACED
<br />D IN FOR INTEGRITY
<br />PURPOSOR FORWARDED AND APPROVED BY GOVERNING
<br />R I der round Sorvice Ale 206
<br />LL
<br />IBLE
<br />DRIVE
<br />BCE# 4009
<br />- c - - - - - - - - - � - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - -_-. PER -
<br />_ I - - - - - -� � - .__ - _ --- - E NATIONALLY RECOGNIZED CODES LOCAL CODES AND GOVERNING AUTHORITIES ester release date
<br />-------------------- Note - - ----- - - ._- --
<br />1n
<br />- - - - _ - NO. ARCO PRODUCTS COMPANY MASTER REVISIONS
<br />EVII
<br />_ - - - - - - NO. DATE REVISIONS
<br />- I! CITY INSPECTOR i0 FIELD VERIFY THAT ALL EXISTING SITE ITEMS SUCH AS: `,�
<br />_ I 1 Ir WALKS AND ENTRANCE AS WELL AS DOOR SIZE AND HARDWARE AND ANY /i—'
<br />I - - - SANITARY FACILITIES ARE HANDICAPPED COMPLYING. PROJECT RELEASE prof, eXe. drawn by
<br />_--- 1 /4/99 ADDED NEW 10,000 GALLON DOUBLE WALL TANK ISSUED FOR 2/10/991/30/99 SHK
<br />Underground Tank Retrofit and Piping Installation Site Plan -
<br />D �� : ' - - - _ - FOR 92 OCTANE. PER ARCO FIELD ENGINEER PLAN CHECK
<br />--- Project / facility
<br />CALL', 1" - ;0'- U" -------- - � 23/4/99 PLAN CHECK COORECTIONS PER CITY OF STOCKTCD
<br />RELEASE 2/70/99 2133
<br />IN I F;3 )
<br />1 inch =10 ft, CONST, sheet / file
<br />RELEASE
<br />1 DW6 Tp1�/
<br />I ,__ I_-f-:u:I �1GG9\MECNAIJICAL�'I AI-Ik.S�4GG•drh 1»Ic/Prne03j D6/13i3 13 3-1 >_ele'. 7•-$70 Steve X2fs:
<br />AS -BUILT TK1-1
<br />of
<br />Il'"�]�
<br />�
<br />T & STAGE II
<br />`yAMOR RFCQVEEY • /
<br />U�Mw,/
<br />/
<br />AM v Q
<br />t-�
<br />ID REINSTALL FOUR (4) INSPECTION/MONITORING WELLS AS SHOWN. W
<br />11 INSTALL NEW VEEDE.R ROOT TANK AND LINE LEAK MONITOR AND ALARM CONTROL PANEL MODEL TLS -350 IN
<br />TO BUILDING \ \
<br />f�LI IfAL CB BUILDING SEE DRAWING TK4-1 FOR LEAK DETECTION AND DISPENSER WIRING DIAGRAM
<br />2 VJ, `yW^.+
<br />CTR�PANEL 15 �
<br />TO BLILT>NG r = _ 1 12 INSTALL STATIC GROUNDING SYSTEM AS PER DETAIL #4 ON DWG. TK4-�
<br />D I ELECTRICFC �PAh'EI- �. � � I "L
<br />( .. 13 F CONTRACTOR TO BACKFILL EXCAVATION WITH PEAGRAVEL IN 12" LIFTS. REUSE OLD BACKFILL
<br />` 1 g /y
<br />A� '��� y - _�-D@7�18MON �� .. � lJ G
<br />I
<br />MC CID CONTRACTOR TO INSTALL NEW 6 CONCRETE TANK SLAB AND REINFORCING E LOCATIONS SHOWN. .�
<br />ET MANHOLE
<br />TO PROVIDE REHAB CAGES AT MANE{OLE. LOCATIONS. INSTALL NEW TURBINE AND FILL SIDE MANHOLES.
<br />ser r.{AN'HOLE covERs 1-1/2" ABOVE SLAB. ITL
<br />o -'� / 9�ACTNE SIPHON 15 CONTRACTOR TO INSTALL NEW SIDEWALK AS SHOWN. EXISTING SIDEWALK TO BE WIDENED FOR HANDICAPPED ACCESSIBLItt. rf
<br />�6 j EXTEND SIDEWALI( _ C W
<br />'E o xGP y/ ( 2 3 TURBINE (TYP) 21 21 / / / FOR ACCESS J.\� 16 CONTRACTOR INSTALL- NEW STEEL DISPENSER ISLAND FORMS AND CONCRETE PUMP ISLANDS.
<br />s w I /). X ( -h - +3 D i 23 !NSIWLL NEW IN -LIN 1 SEE DETAIL 77 ON DWG. TK3-4. ,
<br />I MCI ' 9 % PIPING SUMP 'J// Q P CONTRACTOR i0 INSTALL NEW CONCRETE DRIVE SLAB AND REINFORCING. CONTRACTOR TO INSTALL NE'W TANK SIAB5 AND REINFORCING,
<br />SGP 1 \ J MC\ MC_ IMC NEWPHANDICAPPED ,NEW HANEL A RED -3 MONITOR (87 OCTANE) o SEEE DRAWCONTRACTOR T DOWEL INTO EXISTING CONCRETE DRIVE SLAB AT PIC UNITS W '4" x I8" STEEL BARS AT 16" O.C. wed
<br />/ ll/ 101
<br />]� - - -- - 110' 2" -/ /-1 SIGN `, 18 CONTRACTOR TO INSTALL (4) FOUR GLBARCO B78, SINGLE HOSE PER SIDE, BLENDING MVLTI-PRODUCT DISPENSERS
<br />- - AS SHOWN. DISPENSERS TO BE FITTED WITH BALANCE STAGE II HOSES AND NOZZLES, BREAKAWAY VALVES AND
<br />TURBINE (TYP.) p 3 (- - - --- -. _. - T UNDER DISPENSER CONTAINMENT INCLUDING PRODUCT AND VAPOR SHEAR VALVES AND MONITORING SENSORS. `y
<br />'�.. ENT & STAGE II ' --- - - - - --" - _ -- --- --- - ---- . ^e-_.- _ 26 1 / / SEE DINGS, TK3-3 AND TK3-4 FOR TYPICAL INSTALLATION DETAILS •k-
<br />V
<br />___ I E (�J LL
<br />-
<br />PER RECOVERY MW ; NEW HANDICAPPED EXISTING PRICE ID i CONTRACTOR SHALL FIELD LOCATE, INTERCEPT AND CUT EXISTING CONDUIT ROUTED TO REMOVED
<br />PARKING (VAN ACCESSIBLE) I DISPENSERS AT A CONVENIENT LOCATION. REMOVE ALL WIRING BACK TO PANEL. CAP AND ABANDON
<br />W MW - 1 MC / TO THE NNEWSDISPENSNOT ERS REMOVE ALLNG REUSED HBREAKERSECK UINOTTB NG REUSEDS IN . REPLACEL FOR R BREAKERSIFNEEDED.
<br />SIGN ! ALL ELECTRICAL WORK SHALL CONFORM TO THE UNIFORM ELECTRICAL CODE 1994 EDITION AND TO ALL
<br />o 'MC a C m
<br />c f LOCAL REQUIREMENTS. NOTE THAT EXISTING CONDUIT LOCATIONS ARE ASSUMED m
<br />GP„ OF '�'qP ''!' GINE CONDUIT OUTSSHALO USED FOR NEW DISPENSER POWER AND COMMUNICATION AND ONE CONDUIT FOR GISPENSER
<br />y1'K �TI1Fi INTERCOM. REROUTE CONDUIT AT BUILDING TO ACCOMMODATE INTERCOM LOCATION AT SALES COUNTER. „r( G .0
<br />MG I r e�1J
<br />DISPENSER START UP BY MANUFACTURERS REPRESENTATIVE. CONTRACTOR TO PURGE LINES WITH 200 GALLONS PER HOSE 0 a
<br />EXISTING OR M` W IF qBa�.�, -. MINIMUM. ANY AIR POCKETS OR START UP PROBLEMS DUE TO IMPROPER INSTALLATION OR INCORRECT WIRING THAT E O o
<br />REMEDIATION "C U .� 13
<br />n MC''' PAN PIPING (TION */�• DESTROYS ELECTRONICS WILL BE BILLED BACK TO THE CONTRACTOR. C L_
<br />TO REMAIN {s,�/�+ '` 19 CONTRACTOR TO 'TOUCH UP/REPAIR ANY DAMAGE TO CANOPY COLUMNS FROM THE REMOVAL OF STEEL OVERHEAD HOSE W
<br />a EXISTING ''\\ 7 'y3P7 / yV jek RETRACTOR BARS AND OR SPANDREL SIGNS AS REQUIRED O t
<br />LOT LIGHT I'I `lsFAI TR(`kk�. 20 CONTRACTOR TO INSTALL (4) NEW ISLAND BUMPER POSTS. SEE DETAIL Hf6 ON DWG, TK3-4. 'M'� W -0 M u
<br />z PLANTER MW {h
<br />/ ON AND ALL OTHER � U c
<br />f EXISTING PLANTER L�- DAMAGED ASPHALT ON SITE SAWCUT CLEAN ALL ADJACENT ASPHALT IN REPAIR AREAS BEFORE PATCHING. SLURRY O
<br />(j
<br />AIM i 21 CONTRACTOR TO PATCH AND REPAIR ALL ASPHALT AFFECTED BY THE NFW TANK AND PIPING INSTALIAT!
<br />CO
<br />I /-1 COAT ALL ASPHALT ON SITE AND RESTRIKE PARKING SPACES / ' N
<br />MC T58 TSB 22 EXISTING PL, (PAY ISLAND CASHIERS). 70 REMAIN. '' I rT
<br />_ - - _ _ LdJ v, vJ a
<br />���(�P 23 CONTRACTOR TO INSTALL IN-L!NF PIPING SUMP TO ACCOMMODATE THE LACK OF FALL TO THE REMAINING 87 OCTANE TANKS AT HE SITE.
<br />JPr LJ MB TW (IF REQUIRED ONLY), ENVRON MODEL IUSS-2422 WITH ACCESS COVER INSTALL MONITORING SENSOR
<br />E O,
<br />F- TSB DRIVEWAY O IRED FOR TURBID SHUT DOWN
<br />z_ - BUS STOP SIGN ^
<br />— ` o Compliance Notes
<br />DRIVEwgy TSB T GENERAL CONTRACTOR SHALL OBTAIN NECESSARY PERMIT FROM THE DIVISION OF INDUSTRIAL SAFETY (STATE OF CALIFORNIA) K/�
<br />W
<br />FOR EXCAVATIONS OF TRENCHES 5 -0 OR MORE IN DEPTH INTO WHICH A PERSON IS REQUIRED TO DESCEND.
<br />,� P�✓
<br />v SIrMI, r ! Cell 7011 Free GENERAL CONTRACTOR SHALL PROVIDE 72 HOUR NOTIFICATION TO GOVERNING AGENCY PRIOR TO ANY REQUIRED INSPECTIONS. -
<br />_ _ TANK SYSTEM TO BE INSPECTED BY OWNER'S ENGINEER & GOVERNING AGENCY AT THREE 3 SEPARATE CONSTRUCTION O
<br />2
<br />r,,, 1-1300-422-4133 PHASES AS REQUIRED: SG��® y\
<br />-- _ 1. TANK AND PRIMARY PIPING HYDROSTATICALLY OR PNEUMATICALLY TESTED FOR 30 MINUTES.
<br />_ 2. INSPECTION OF ALL SECONDARY CONTAINMENT, INCLUDING TESTING, IN ACCORDANCE WITH MANUFACTURER'S GUIDELINES. `r7N 1 E�'P
<br />TWO 3. FINAL INSPECTION INCLUDING ALL PORTIONS OF THE LEAK DETECTION SYSTEM.. �+ ENGIN
<br />J; --- _--_ _ WORKING DAYS
<br />BEFORE YOU ALL TANK SUMPS AND UNDER DISPENSER URS TOMENT SUMPS SHALL BE S RE ATICALLY TESTED (LAKE TEST) WITH -u«D NI I`IIN6 aw DES:ca SPYALIETS'
<br />DIG STANDING WATER FOR A PERIOD Of 24 HOURS TO INSURE THAT THE SUMPS ARE WATERTIGHT. THE OWNER'S 1x215 12ND AVENUE SOUTH
<br />—� ENGINEER MUST SIGN OFF ON THIS TESTING ON THE TANK INSTALLATION CHECKLIST BEFORE CONTRACTOR WILL BE PPO. RENT, WASHINGTON28032
<br />-:_-
<br />-
<br />SION
<br />w - WV PLYMOUTH -- —�--�� —_ — o Sownern Cellrornm r ALL AGENCY
<br />PRIOR ALS TO TAN ESYSTEM BEING PLACED
<br />D IN FOR INTEGRITY
<br />PURPOSOR FORWARDED AND APPROVED BY GOVERNING
<br />R I der round Sorvice Ale 206
<br />LL
<br />IBLE
<br />DRIVE
<br />BCE# 4009
<br />- c - - - - - - - - - � - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - -_-. PER -
<br />_ I - - - - - -� � - .__ - _ --- - E NATIONALLY RECOGNIZED CODES LOCAL CODES AND GOVERNING AUTHORITIES ester release date
<br />-------------------- Note - - ----- - - ._- --
<br />1n
<br />- - - - _ - NO. ARCO PRODUCTS COMPANY MASTER REVISIONS
<br />EVII
<br />_ - - - - - - NO. DATE REVISIONS
<br />- I! CITY INSPECTOR i0 FIELD VERIFY THAT ALL EXISTING SITE ITEMS SUCH AS: `,�
<br />_ I 1 Ir WALKS AND ENTRANCE AS WELL AS DOOR SIZE AND HARDWARE AND ANY /i—'
<br />I - - - SANITARY FACILITIES ARE HANDICAPPED COMPLYING. PROJECT RELEASE prof, eXe. drawn by
<br />_--- 1 /4/99 ADDED NEW 10,000 GALLON DOUBLE WALL TANK ISSUED FOR 2/10/991/30/99 SHK
<br />Underground Tank Retrofit and Piping Installation Site Plan -
<br />D �� : ' - - - _ - FOR 92 OCTANE. PER ARCO FIELD ENGINEER PLAN CHECK
<br />--- Project / facility
<br />CALL', 1" - ;0'- U" -------- - � 23/4/99 PLAN CHECK COORECTIONS PER CITY OF STOCKTCD
<br />RELEASE 2/70/99 2133
<br />IN I F;3 )
<br />1 inch =10 ft, CONST, sheet / file
<br />RELEASE
<br />1 DW6 Tp1�/
<br />I ,__ I_-f-:u:I �1GG9\MECNAIJICAL�'I AI-Ik.S�4GG•drh 1»Ic/Prne03j D6/13i3 13 3-1 >_ele'. 7•-$70 Steve X2fs:
<br />AS -BUILT TK1-1
<br />of
<br />
|