Laserfiche WebLink
0 s 1]0 20 _General Notes <br />PIPING LEGEND <br />NEW 2 F.C. DOUBLE WALL PRODUCT PIPING <br />6' HIGH MASONRY WALL NEW 3" AND 2" FG. SINGLE WALL VAPOR RECOVERY PIPING <br />i <br />SCALE V= 10'-0" EXISTING4f NEW EXISTING 2" F.G. SINGLE WALL VENT PIPING (LOCATIONS ASSUMED) <br />EXISTING/NEWCONOUIT (LOCATIONS ASSUMED) Or <br />PAY TELEPHONES EXTENT OF NEW CONCRETE TANK SLAB ME BE REPLACED <br />TEMP POWER <br />TRASH ENCLOSURE PANEL FOR ON <br />MW <br />- 28' C/L FENCE r� <br />PANEL <br />EOUIPMENT ENCLOSURE I EXTENT OF NEW ASPHALT TO BE REPLACED <br />iL+ EXISTING I MC <br />REMEr I�� EXTENT OF NEW CONCRETE WALK INSTALLED <br />POWER DIATIOP! 'X MC <br />1 X PIPING OR CONDUIT INTERCEPT POINT (CONTRACTOR TO DETERMINE) \ >` �` <br />POLE <br />EQUIPMENT MW I 1. THE GENERAL CONTRACTOR SHALL VERIFY EXISTING SITE CONDITIONS PRIOR TO BID SUBMISSION r: C c W O <br />TO REMAIN � U � � � <br />2, ALL DIMENSIONS AND CONDITIONS MUST BE CHECKED AND VERIFIED IN THE FIELD BEFORE STARTING ANY WORK. •L <br />- ANY DISCREPANCY SMALL BE CAI LED TO THE ATTENTION' OF THE OWNER'S ENGINEER FOR HIS DECISION BEFORE ," t J <br />I PROCEEDING WITH THE WORK. <br />/ U N 0 0 <br />r � o <br />GP ` CB <br />MC \ J i 3. ByINSTHE STATION AND TESTING OF PIPING AND SHALL BE PERFORMED O A LICENSED TANK SERVICE PROVIDER AS REQUIRED <br />\ OY THE STATE AND LOCAL REQUIREMENTS. CONTRACTOR SHALL PROVIDE NOTIFICATION i0 THE JUR6DICTIOIJAL lV <br />EXISTING -1� o <br />I � � EXISTING EXISTING PRICE/ID LOT LIGHT I _ 4 AGENCY RESPONSIBLE FOR INSPECTIONS ACCORDING 70 THE PERMIT REQUIREMENTS. <br />ALL ELECTRICAL- WORK PERFORMED WITHIN CLASS I HAZARDOUS AREAS SHALL BE SEALED PER NEC AND UFC V " <br />MW REMEDIATION SIGN I REQUIREMENTS. O <br />EXISTING PIPING (TYP.) C <br />O� REMEDIATION TO REMAIN S. THE PRODUCT PIPING LAYOUT SHOWN ON THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND ARE NOT U g <br />PIPING (TYP.) WASTE OIL I INTENDED TO BE AN EXACT REPRESENTATION OF THE PIPING LAYOUT. GENERAL CONTRACTOR TO RELOCATE, C L <br />Tr <br />TO REMAIN TANK MODIFY AND ADJUST PIPING INSTALLATION TO PROVIDE A SYSTEM CONSISTENT WITH THE INTENT OF THE DESIGN. \/// `/ ^` y� <br />,JI TO REMAIN GENERAL CONTRACTOR SHALL PREPARE AS -BUILT" PLANS UPON THE COMPLETION OF THE INSTALLATION, O.✓ Od U' N✓ �..F. <br />MW V <br />1LV _ AIR IIP;f, I 6. ALL UNDERGROUND PIPING SHALL BE FIBERGLASS UNLESS NOTED OTHERWISE AND SHALL BE INSTALLED PER r <br />i MANUFACTURERS SPECIFICATIONS. ow <br />AIR /WATER > ca O <br />i� DISPENSER 3 8 DED INSTALL <br />SBy OWNER OBODEMENT REQUIRED FOR COMPLETE INSTALLATION WHETHER OR <br />I - GP „GP RAISED DI _ ' <br />THE <br />L V/ <br />DISPENSER ISLANDS j NOT THE GENERAL <br />EOUIPMENT AST PROM <br />(TYP. 4 PLCs.) mo LAWS <br />CONTRACTOR CONDUCT THEIR LWORK TIIN OTHERS. <br />WITH ALL FEDERAL STATE AND LOCAL O <br />��xi-- -- -- - _G — - <br />I � LAW AND REGULATIONS. <br />4 Cowr,. sLAe w 2P 17 1s 1 W-- Installation Notes 0' - <br />,JP MC al <br />EXISTING (4) 2" DIA. BLACK STEEL 7 ]_� <br />C, VENT RISERS TO REMAIN TK3-1 I I �� <br />CL �� EXISTING (2) 12.000 GALLON MODERN WELDING SINGLE <br />WALL <br />TANKS TO REMAIN. <br />TANK VENTS MODERN <br />7 1Q000 GALLON LL GI_ CORNING SINGLE WALL FRP TANK TO BE REMOVED AND REPLACED WITH 10,000 GALLON �� ® V" <br />MODERN WEDGING DOUBLE WALL GLASTEEL TANLDOUBLE REMAIN. SEE DWG. TK1-2. CONFIGURE PRODUCTS AS FOLLOWS; Y <br />MC EXISTING MIDGRADE 89 OCTANE (TANK ((1) SHALL BE RECONFIGURED FOR UNLEADED 87 OCTANE, L_ <br />EXISTING VENT LINES <br />EXISTING UNLEADED 87 OCTANE (TANK b2) SHALL BE REMAIN UNCHANGED /i • M <br />TK3�3 M323 TK3-4 TK3-4 20 16 ISLAND BUMPER POST �'�"' ( THE ENVIRO TWO <br />7 OCTANE TANS WILL BBELShED SHALL REMAIN E OCTANE. r1�IL.. J <br />TO REMAIN18 NEW UNLEADED PREMIUM 92 OCTANE (TANK <br />PHONED MAE SUMS TOGETHER ?0 PROVIDE FOR A BLENDING <br />NEW ' TK3-4 TY'P. 4 PICS.) I NEW TURBINE SUMPS ON ALL TANKS. i <br />VEFDER ROOT MC (TYP. SINGLE HOSE PER SIDE O INSTALL N(; 1/1/2 HP STANDARD TURBINE IN NEW 92 OCTANE TANK (TANK n3. c <br />MCP' - ALARM 4'GNIi OR -i BLENDING 3 PRODUCT MPD) I EXISTING 2 3/4 HE RED JACKET TURBINES (TANKS #1 & #'2) TO BE RETROFITTED WITH 1-1/2 HP MOTORSREMAIN, INSTALL � �� 0 <br />�ISTLM r SIPHON CHECK VALVES ON TANK j)1 & f)2 TURBINES. TANK #1 SIPHON CHECK USED FOR CONDENSATE TANK EVACUATION. v <br />m <br />65'-0' � I <br />MONITORING WELL 10 I w - ---- �-- _ __- __ - __. __ � i � TANK �2 SIPHON yCHECK USED FOR PRODUCT SIPHON BETWEEN TANKS k1 & N2. INSTALL ACTIVE SIPHON PIPING BETWEEN <br />(TYP. 4 PICS.) c I \' _ UNLEADED <br />THEPNI� AND <br />DU UNLEADED <br />K N2)) INSTALL 2" DOUBLE WALL PRODUCT LINE FROM TANK #1 1 TO TANK (f 2 AND '' % 0) <br />g - #1 SUMP. INSTALL BACKFLOW PREVENTION CHECK VALVES IN PRODUCT LINES #1 & b2. <br />NEW TANK SLAB 1q EXISTING 2 % /' „ // i , w1w� 0 CONTRACTOR SHALL FIELD LOCATE, INTERCEPT AND ROUfE EXISTING-COJNDURS TO PuReINE' LOCATIONS/ ' <br />ARCO AM PM y / C' / \/ /. / �: 1 CONTRACTOR TO VERIFY THAT EXISTING WIRING MAY BE REUSED. PULL NEW WIRE FROM PANELBOARD, -- (� <br />r rrrLLL+rrr <br />EXISTING 27 / / % //� O I IF REQUIRED. CHECK CIRCUIT BREAKERS IN PANEL, REPLACE IF NEEDED, ALL ELECTRICAL WORK SHALL <br />G REMEDIATION 30' 4" m i� °1" "' / 7Z / wl % / NOONFORM TO THE UNIFORM ELECTRICAL CODE 1994 EDITION AND TO ALL LOCAL REQUIREMENTS. <br />/ % E THAT EXISTING CONDUIT LOCATIONS ARE ASSUMED. <br />i <br />PIPING f - - - __... - ✓ EMERGENCY PUMP / 4 CONTRACTOR TO INSTALL TI4REE (3 4" DUAL POINT FILL ADAPTERS AND CAPS. INSTALL THREE (3 3" DUAL <br />o .Q.. TO REMAIN - / I SHUTOFF SWITCH f m ,"4 O )) <br />(INDOOR & OUTDOOR) / // �f/ �� / I POINT STAGE I VAPOR RECOVERY ADAPTERS AND CAPS. CONTRACTOR TO INSTALL NEW FILL SIDE 5 GALLON '��..(( <br />- TO REMAIN LOCATE TO SPILL CONTAINMENT BUCKETS AT FILL S1DE W/ INTEGRAL INLINE� DRAINS BACK TO TANK. INSTALL RISER ISOLATION JACKETS _aj R/ <br />a ( 48" A.F.F PER CODE %,/ / <br />+H- <br />E, <br />'I _ /� I //� �Y ON ALL UNPROTECTED RISERS FOR CORROSION PROTECTION. SEE DETAIL #'1 ON DRAWING TK3-1. /yam <br />^ - _ �/� J� / / 3Z of " 18 / 18 INSTALL 3" SINGLE WALL STAGE 11 VAPOR RECOVERY LINE FOR "BALANCE" VAPOR RECOVERY SYSTEM. SLOPE 1/8" PER FOOT 1� <br />ICE <br />3 ,! ANNULAR SPACE TYP. / / - MINIMUM TO NEW CONDENSATE TANK SEE DETAILS AND SECTIONS ON DWG. TK3-3. INSTALL NEW STAGE If VAPOR RECOVERY <br />} STAGE I VAPOR RETURN (THP.) 4_ I I / ` 7 NEW STAGE II VAPOR RECOVERY J WGU7 LIN TSC 756 LONDENSAIE 1ANK TO ACCOMMODATE THE LACK OF FALL FROM THE FURTHEST DISPENSER TO THE TANK FIELD. SEE �rI <br />,I I \ DOUBLE WALL CONDENSATE �' / -� �! C,,/ INSTALLATION DETAILS ON DWG. TK2-3, l�V <br />O FILL (TYP.) o—' / -\ n- - TANK W/ MONITOR O"/% (/ 19 i / 2 -^ I� INSTALL TWO 2' DOUBLE WALL PRODUCT LINES. LINES TO BE EQUIPPED WITH MECHANICAL LEAK DETECTORS (3 GFH) LL <br />, - 5` / 4) 1®I �J-1 i�TSM WIRED OD A LIQUID <br />ITTURBINE SHUTDOWN, ILGPEL IE/B') PER THE <br />F00T TURBINE <br />M NIMUM 10 TANKSATSEEH DING TK4E 11 FOR WIRING <br />J m /'` REVERS OOR / / III x �Jl y DIAGRAM. PIPING SHALL BE INSTALLED PER MANUFACTURERS RECOMMENDATION AND INSTRUCTIONS. <br />z <br />NEW TANK 1 a I III. / �' / sWw2 / / dJ_ <br />STAB I i n I,I % z I/ 1- / % ' 2 / _{ �- 1 I � RECONNECT EXISTING THREE (O E SINGLE WADI FIBERGLASS VENT LINES O TANKS (IFOV REQUIRED), CONTRACTOR E VERIFY <br />Ii\ ,8 0 /% i / 19 THAT THE TERMINATION POINT OF EXISTING TANK VENTS TO BEA MINIMUM OF 17 ABOVE GRADE, 30 INCHES ABOVE ROOF <br />I / <br />i <br />I' <br />LINE AND NOT WITHIN 5 FROM ANY BUILDING OPENING OR PROPERTY LINE THAT CAN BE BUILT UPON MJD IN ACCORDANCE <br />i \ V j � ¢ I'3 ,- I I �� I / Y ,'! 17. O WIN UNIFORM IRE CODE REQUIREMENTS SEE_DETAIL a4 ON DRAWING TK3-1. <br />INSTALL THREE 3 VALL (3)RNE ANNULAR SPACE MONITOR SENSORS AT DOUBLE WALL TANKS y1 & {IN SEE DETAIL b2 <br />�� I � ON JAG TK4-2. INSTALL (3) NEW 1UR8INE SUMP SENSORS AT NEW TURBINE SUMPS, WIRED FOR TURBINE SHUTDOWN. <br />AN LAR y�PACE (rYP.) - h' a m'�i l 0 INSTALL 2' DIA. ACTIVE SIPHON -BETWEEN 87 -OCTANE TANKS AS SHOWN. -- -^ -"-- -' <br />^=. SEE DETAILS 6, 7 AND 8 ON UWG, TK3-2. <br />fa / _/ MW,' I N 8 N <br />STAGE I VAPOR RETURN (TYP.)�- %� �/��' � !; � �- I I � I /' INV O 9 � 18 � <br />^ _ FILL (TYR )�- G <br />a <br />6' CFENCE % iD zoo <br />ENCLOSURE <br />0 <br />r� <br />z <br />OR <br />o I- <br />ID REINSTALL FOUR (4) INSPECTION/MONITORING WELLS AS SHOWN. W <br />11 INSTALL NEW VEEDE.R ROOT TANK AND LINE LEAK MONITOR AND ALARM CONTROL PANEL MODEL TLS -350 IN <br />TO BUILDING \ \ <br />f�LI IfAL CB BUILDING SEE DRAWING TK4-1 FOR LEAK DETECTION AND DISPENSER WIRING DIAGRAM <br />2 VJ, `yW^.+ <br />CTR�PANEL 15 � <br />TO BLILT>NG r = _ 1 12 INSTALL STATIC GROUNDING SYSTEM AS PER DETAIL #4 ON DWG. TK4-� <br />D I ELECTRICFC �PAh'EI- �. � � I "L <br />( .. 13 F CONTRACTOR TO BACKFILL EXCAVATION WITH PEAGRAVEL IN 12" LIFTS. REUSE OLD BACKFILL <br />` 1 g /y <br />A� '��� y - _�-D@7�18MON �� .. � lJ G <br />I <br />MC CID CONTRACTOR TO INSTALL NEW 6 CONCRETE TANK SLAB AND REINFORCING E LOCATIONS SHOWN. .� <br />ET MANHOLE <br />TO PROVIDE REHAB CAGES AT MANE{OLE. LOCATIONS. INSTALL NEW TURBINE AND FILL SIDE MANHOLES. <br />ser r.{AN'HOLE covERs 1-1/2" ABOVE SLAB. ITL <br />o -'� / 9�ACTNE SIPHON 15 CONTRACTOR TO INSTALL NEW SIDEWALK AS SHOWN. EXISTING SIDEWALK TO BE WIDENED FOR HANDICAPPED ACCESSIBLItt. rf <br />�6 j EXTEND SIDEWALI( _ C W <br />'E o xGP y/ ( 2 3 TURBINE (TYP) 21 21 / / / FOR ACCESS J.\� 16 CONTRACTOR INSTALL- NEW STEEL DISPENSER ISLAND FORMS AND CONCRETE PUMP ISLANDS. <br />s w I /). X ( -h - +3 D i 23 !NSIWLL NEW IN -LIN 1 SEE DETAIL 77 ON DWG. TK3-4. , <br />I MCI ' 9 % PIPING SUMP 'J// Q P CONTRACTOR i0 INSTALL NEW CONCRETE DRIVE SLAB AND REINFORCING. CONTRACTOR TO INSTALL NE'W TANK SIAB5 AND REINFORCING, <br />SGP 1 \ J MC\ MC_ IMC NEWPHANDICAPPED ,NEW HANEL A RED -3 MONITOR (87 OCTANE) o SEEE DRAWCONTRACTOR T DOWEL INTO EXISTING CONCRETE DRIVE SLAB AT PIC UNITS W '4" x I8" STEEL BARS AT 16" O.C. wed <br />/ ll/ 101 <br />]� - - -- - 110' 2" -/ /-1 SIGN `, 18 CONTRACTOR TO INSTALL (4) FOUR GLBARCO B78, SINGLE HOSE PER SIDE, BLENDING MVLTI-PRODUCT DISPENSERS <br />- - AS SHOWN. DISPENSERS TO BE FITTED WITH BALANCE STAGE II HOSES AND NOZZLES, BREAKAWAY VALVES AND <br />TURBINE (TYP.) p 3 (- - - --- -. _. - T UNDER DISPENSER CONTAINMENT INCLUDING PRODUCT AND VAPOR SHEAR VALVES AND MONITORING SENSORS. `y <br />'�.. ENT & STAGE II ' --- - - - - --" - _ -- --- --- - ---- . ^e-_.- _ 26 1 / / SEE DINGS, TK3-3 AND TK3-4 FOR TYPICAL INSTALLATION DETAILS •k- <br />V <br />___ I E (�J LL <br />- <br />PER RECOVERY MW ; NEW HANDICAPPED EXISTING PRICE ID i CONTRACTOR SHALL FIELD LOCATE, INTERCEPT AND CUT EXISTING CONDUIT ROUTED TO REMOVED <br />PARKING (VAN ACCESSIBLE) I DISPENSERS AT A CONVENIENT LOCATION. REMOVE ALL WIRING BACK TO PANEL. CAP AND ABANDON <br />W MW - 1 MC / TO THE NNEWSDISPENSNOT ERS REMOVE ALLNG REUSED HBREAKERSECK UINOTTB NG REUSEDS IN . REPLACEL FOR R BREAKERSIFNEEDED. <br />SIGN ! ALL ELECTRICAL WORK SHALL CONFORM TO THE UNIFORM ELECTRICAL CODE 1994 EDITION AND TO ALL <br />o 'MC a C m <br />c f LOCAL REQUIREMENTS. NOTE THAT EXISTING CONDUIT LOCATIONS ARE ASSUMED m <br />GP„ OF '�'qP ''!' GINE CONDUIT OUTSSHALO USED FOR NEW DISPENSER POWER AND COMMUNICATION AND ONE CONDUIT FOR GISPENSER <br />y1'K �TI1Fi INTERCOM. REROUTE CONDUIT AT BUILDING TO ACCOMMODATE INTERCOM LOCATION AT SALES COUNTER. „r( G .0 <br />MG I r e�1J <br />DISPENSER START UP BY MANUFACTURERS REPRESENTATIVE. CONTRACTOR TO PURGE LINES WITH 200 GALLONS PER HOSE 0 a <br />EXISTING OR M` W IF qBa�.�, -. MINIMUM. ANY AIR POCKETS OR START UP PROBLEMS DUE TO IMPROPER INSTALLATION OR INCORRECT WIRING THAT E O o <br />REMEDIATION "C U .� 13 <br />n MC''' PAN PIPING (TION */�• DESTROYS ELECTRONICS WILL BE BILLED BACK TO THE CONTRACTOR. C L_ <br />TO REMAIN {s,�/�+ '` 19 CONTRACTOR TO 'TOUCH UP/REPAIR ANY DAMAGE TO CANOPY COLUMNS FROM THE REMOVAL OF STEEL OVERHEAD HOSE W <br />a EXISTING ''\\ 7 'y3P7 / yV jek RETRACTOR BARS AND OR SPANDREL SIGNS AS REQUIRED O t <br />LOT LIGHT I'I `lsFAI TR(`kk�. 20 CONTRACTOR TO INSTALL (4) NEW ISLAND BUMPER POSTS. SEE DETAIL Hf6 ON DWG, TK3-4. 'M'� W -0 M u <br />z PLANTER MW {h <br />/ ON AND ALL OTHER � U c <br />f EXISTING PLANTER L�- DAMAGED ASPHALT ON SITE SAWCUT CLEAN ALL ADJACENT ASPHALT IN REPAIR AREAS BEFORE PATCHING. SLURRY O <br />(j <br />AIM i 21 CONTRACTOR TO PATCH AND REPAIR ALL ASPHALT AFFECTED BY THE NFW TANK AND PIPING INSTALIAT! <br />CO <br />I /-1 COAT ALL ASPHALT ON SITE AND RESTRIKE PARKING SPACES / ' N <br />MC T58 TSB 22 EXISTING PL, (PAY ISLAND CASHIERS). 70 REMAIN. '' I rT <br />_ - - _ _ LdJ v, vJ a <br />���(�P 23 CONTRACTOR TO INSTALL IN-L!NF PIPING SUMP TO ACCOMMODATE THE LACK OF FALL TO THE REMAINING 87 OCTANE TANKS AT HE SITE. <br />JPr LJ MB TW (IF REQUIRED ONLY), ENVRON MODEL IUSS-2422 WITH ACCESS COVER INSTALL MONITORING SENSOR <br />E O, <br />F- TSB DRIVEWAY O IRED FOR TURBID SHUT DOWN <br />z_ - BUS STOP SIGN ^ <br />— ` o Compliance Notes <br />DRIVEwgy TSB T GENERAL CONTRACTOR SHALL OBTAIN NECESSARY PERMIT FROM THE DIVISION OF INDUSTRIAL SAFETY (STATE OF CALIFORNIA) K/� <br />W <br />FOR EXCAVATIONS OF TRENCHES 5 -0 OR MORE IN DEPTH INTO WHICH A PERSON IS REQUIRED TO DESCEND. <br />,� P�✓ <br />v SIrMI, r ! Cell 7011 Free GENERAL CONTRACTOR SHALL PROVIDE 72 HOUR NOTIFICATION TO GOVERNING AGENCY PRIOR TO ANY REQUIRED INSPECTIONS. - <br />_ _ TANK SYSTEM TO BE INSPECTED BY OWNER'S ENGINEER & GOVERNING AGENCY AT THREE 3 SEPARATE CONSTRUCTION O <br />2 <br />r,,, 1-1300-422-4133 PHASES AS REQUIRED: SG��® y\ <br />-- _ 1. TANK AND PRIMARY PIPING HYDROSTATICALLY OR PNEUMATICALLY TESTED FOR 30 MINUTES. <br />_ 2. INSPECTION OF ALL SECONDARY CONTAINMENT, INCLUDING TESTING, IN ACCORDANCE WITH MANUFACTURER'S GUIDELINES. `r7N 1 E�'P <br />TWO 3. FINAL INSPECTION INCLUDING ALL PORTIONS OF THE LEAK DETECTION SYSTEM.. �+ ENGIN <br />J; --- _--_ _ WORKING DAYS <br />BEFORE YOU ALL TANK SUMPS AND UNDER DISPENSER URS TOMENT SUMPS SHALL BE S RE ATICALLY TESTED (LAKE TEST) WITH -u«D NI I`IIN6 aw DES:ca SPYALIETS' <br />DIG STANDING WATER FOR A PERIOD Of 24 HOURS TO INSURE THAT THE SUMPS ARE WATERTIGHT. THE OWNER'S 1x215 12ND AVENUE SOUTH <br />—� ENGINEER MUST SIGN OFF ON THIS TESTING ON THE TANK INSTALLATION CHECKLIST BEFORE CONTRACTOR WILL BE PPO. RENT, WASHINGTON28032 <br />-:_- <br />- <br />SION <br />w - WV PLYMOUTH -- —�--�� —_ — o Sownern Cellrornm r ALL AGENCY <br />PRIOR ALS TO TAN ESYSTEM BEING PLACED <br />D IN FOR INTEGRITY <br />PURPOSOR FORWARDED AND APPROVED BY GOVERNING <br />R I der round Sorvice Ale 206 <br />LL <br />IBLE <br />DRIVE <br />BCE# 4009 <br />- c - - - - - - - - - � - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - -_-. PER - <br />_ I - - - - - -� � - .__ - _ --- - E NATIONALLY RECOGNIZED CODES LOCAL CODES AND GOVERNING AUTHORITIES ester release date <br />-------------------- Note - - ----- - - ._- -- <br />1n <br />- - - - _ - NO. ARCO PRODUCTS COMPANY MASTER REVISIONS <br />EVII <br />_ - - - - - - NO. DATE REVISIONS <br />- I! CITY INSPECTOR i0 FIELD VERIFY THAT ALL EXISTING SITE ITEMS SUCH AS: `,� <br />_ I 1 Ir WALKS AND ENTRANCE AS WELL AS DOOR SIZE AND HARDWARE AND ANY /i—' <br />I - - - SANITARY FACILITIES ARE HANDICAPPED COMPLYING. PROJECT RELEASE prof, eXe. drawn by <br />_--- 1 /4/99 ADDED NEW 10,000 GALLON DOUBLE WALL TANK ISSUED FOR 2/10/991/30/99 SHK <br />Underground Tank Retrofit and Piping Installation Site Plan - <br />D �� : ' - - - _ - FOR 92 OCTANE. PER ARCO FIELD ENGINEER PLAN CHECK <br />--- Project / facility <br />CALL', 1" - ;0'- U" -------- - � 23/4/99 PLAN CHECK COORECTIONS PER CITY OF STOCKTCD <br />RELEASE 2/70/99 2133 <br />IN I F;3 ) <br />1 inch =10 ft, CONST, sheet / file <br />RELEASE <br />1 DW6 Tp1�/ <br />I ,__ I_-f-:u:I �1GG9\MECNAIJICAL�'I AI-Ik.S�4GG•drh 1»Ic/Prne03j D6/13i3 13 3-1 >_ele'. 7•-$70 Steve X2fs: <br />AS -BUILT TK1-1 <br />of <br />Il'"�]� <br />� <br />T & STAGE II <br />`yAMOR RFCQVEEY • / <br />U�Mw,/ <br />/ <br />AM v Q <br />t-� <br />ID REINSTALL FOUR (4) INSPECTION/MONITORING WELLS AS SHOWN. W <br />11 INSTALL NEW VEEDE.R ROOT TANK AND LINE LEAK MONITOR AND ALARM CONTROL PANEL MODEL TLS -350 IN <br />TO BUILDING \ \ <br />f�LI IfAL CB BUILDING SEE DRAWING TK4-1 FOR LEAK DETECTION AND DISPENSER WIRING DIAGRAM <br />2 VJ, `yW^.+ <br />CTR�PANEL 15 � <br />TO BLILT>NG r = _ 1 12 INSTALL STATIC GROUNDING SYSTEM AS PER DETAIL #4 ON DWG. TK4-� <br />D I ELECTRICFC �PAh'EI- �. � � I "L <br />( .. 13 F CONTRACTOR TO BACKFILL EXCAVATION WITH PEAGRAVEL IN 12" LIFTS. REUSE OLD BACKFILL <br />` 1 g /y <br />A� '��� y - _�-D@7�18MON �� .. � lJ G <br />I <br />MC CID CONTRACTOR TO INSTALL NEW 6 CONCRETE TANK SLAB AND REINFORCING E LOCATIONS SHOWN. .� <br />ET MANHOLE <br />TO PROVIDE REHAB CAGES AT MANE{OLE. LOCATIONS. INSTALL NEW TURBINE AND FILL SIDE MANHOLES. <br />ser r.{AN'HOLE covERs 1-1/2" ABOVE SLAB. ITL <br />o -'� / 9�ACTNE SIPHON 15 CONTRACTOR TO INSTALL NEW SIDEWALK AS SHOWN. EXISTING SIDEWALK TO BE WIDENED FOR HANDICAPPED ACCESSIBLItt. rf <br />�6 j EXTEND SIDEWALI( _ C W <br />'E o xGP y/ ( 2 3 TURBINE (TYP) 21 21 / / / FOR ACCESS J.\� 16 CONTRACTOR INSTALL- NEW STEEL DISPENSER ISLAND FORMS AND CONCRETE PUMP ISLANDS. <br />s w I /). X ( -h - +3 D i 23 !NSIWLL NEW IN -LIN 1 SEE DETAIL 77 ON DWG. TK3-4. , <br />I MCI ' 9 % PIPING SUMP 'J// Q P CONTRACTOR i0 INSTALL NEW CONCRETE DRIVE SLAB AND REINFORCING. CONTRACTOR TO INSTALL NE'W TANK SIAB5 AND REINFORCING, <br />SGP 1 \ J MC\ MC_ IMC NEWPHANDICAPPED ,NEW HANEL A RED -3 MONITOR (87 OCTANE) o SEEE DRAWCONTRACTOR T DOWEL INTO EXISTING CONCRETE DRIVE SLAB AT PIC UNITS W '4" x I8" STEEL BARS AT 16" O.C. wed <br />/ ll/ 101 <br />]� - - -- - 110' 2" -/ /-1 SIGN `, 18 CONTRACTOR TO INSTALL (4) FOUR GLBARCO B78, SINGLE HOSE PER SIDE, BLENDING MVLTI-PRODUCT DISPENSERS <br />- - AS SHOWN. DISPENSERS TO BE FITTED WITH BALANCE STAGE II HOSES AND NOZZLES, BREAKAWAY VALVES AND <br />TURBINE (TYP.) p 3 (- - - --- -. _. - T UNDER DISPENSER CONTAINMENT INCLUDING PRODUCT AND VAPOR SHEAR VALVES AND MONITORING SENSORS. `y <br />'�.. ENT & STAGE II ' --- - - - - --" - _ -- --- --- - ---- . ^e-_.- _ 26 1 / / SEE DINGS, TK3-3 AND TK3-4 FOR TYPICAL INSTALLATION DETAILS •k- <br />V <br />___ I E (�J LL <br />- <br />PER RECOVERY MW ; NEW HANDICAPPED EXISTING PRICE ID i CONTRACTOR SHALL FIELD LOCATE, INTERCEPT AND CUT EXISTING CONDUIT ROUTED TO REMOVED <br />PARKING (VAN ACCESSIBLE) I DISPENSERS AT A CONVENIENT LOCATION. REMOVE ALL WIRING BACK TO PANEL. CAP AND ABANDON <br />W MW - 1 MC / TO THE NNEWSDISPENSNOT ERS REMOVE ALLNG REUSED HBREAKERSECK UINOTTB NG REUSEDS IN . REPLACEL FOR R BREAKERSIFNEEDED. <br />SIGN ! ALL ELECTRICAL WORK SHALL CONFORM TO THE UNIFORM ELECTRICAL CODE 1994 EDITION AND TO ALL <br />o 'MC a C m <br />c f LOCAL REQUIREMENTS. NOTE THAT EXISTING CONDUIT LOCATIONS ARE ASSUMED m <br />GP„ OF '�'qP ''!' GINE CONDUIT OUTSSHALO USED FOR NEW DISPENSER POWER AND COMMUNICATION AND ONE CONDUIT FOR GISPENSER <br />y1'K �TI1Fi INTERCOM. REROUTE CONDUIT AT BUILDING TO ACCOMMODATE INTERCOM LOCATION AT SALES COUNTER. „r( G .0 <br />MG I r e�1J <br />DISPENSER START UP BY MANUFACTURERS REPRESENTATIVE. CONTRACTOR TO PURGE LINES WITH 200 GALLONS PER HOSE 0 a <br />EXISTING OR M` W IF qBa�.�, -. MINIMUM. ANY AIR POCKETS OR START UP PROBLEMS DUE TO IMPROPER INSTALLATION OR INCORRECT WIRING THAT E O o <br />REMEDIATION "C U .� 13 <br />n MC''' PAN PIPING (TION */�• DESTROYS ELECTRONICS WILL BE BILLED BACK TO THE CONTRACTOR. C L_ <br />TO REMAIN {s,�/�+ '` 19 CONTRACTOR TO 'TOUCH UP/REPAIR ANY DAMAGE TO CANOPY COLUMNS FROM THE REMOVAL OF STEEL OVERHEAD HOSE W <br />a EXISTING ''\\ 7 'y3P7 / yV jek RETRACTOR BARS AND OR SPANDREL SIGNS AS REQUIRED O t <br />LOT LIGHT I'I `lsFAI TR(`kk�. 20 CONTRACTOR TO INSTALL (4) NEW ISLAND BUMPER POSTS. SEE DETAIL Hf6 ON DWG, TK3-4. 'M'� W -0 M u <br />z PLANTER MW {h <br />/ ON AND ALL OTHER � U c <br />f EXISTING PLANTER L�- DAMAGED ASPHALT ON SITE SAWCUT CLEAN ALL ADJACENT ASPHALT IN REPAIR AREAS BEFORE PATCHING. SLURRY O <br />(j <br />AIM i 21 CONTRACTOR TO PATCH AND REPAIR ALL ASPHALT AFFECTED BY THE NFW TANK AND PIPING INSTALIAT! <br />CO <br />I /-1 COAT ALL ASPHALT ON SITE AND RESTRIKE PARKING SPACES / ' N <br />MC T58 TSB 22 EXISTING PL, (PAY ISLAND CASHIERS). 70 REMAIN. '' I rT <br />_ - - _ _ LdJ v, vJ a <br />���(�P 23 CONTRACTOR TO INSTALL IN-L!NF PIPING SUMP TO ACCOMMODATE THE LACK OF FALL TO THE REMAINING 87 OCTANE TANKS AT HE SITE. <br />JPr LJ MB TW (IF REQUIRED ONLY), ENVRON MODEL IUSS-2422 WITH ACCESS COVER INSTALL MONITORING SENSOR <br />E O, <br />F- TSB DRIVEWAY O IRED FOR TURBID SHUT DOWN <br />z_ - BUS STOP SIGN ^ <br />— ` o Compliance Notes <br />DRIVEwgy TSB T GENERAL CONTRACTOR SHALL OBTAIN NECESSARY PERMIT FROM THE DIVISION OF INDUSTRIAL SAFETY (STATE OF CALIFORNIA) K/� <br />W <br />FOR EXCAVATIONS OF TRENCHES 5 -0 OR MORE IN DEPTH INTO WHICH A PERSON IS REQUIRED TO DESCEND. <br />,� P�✓ <br />v SIrMI, r ! Cell 7011 Free GENERAL CONTRACTOR SHALL PROVIDE 72 HOUR NOTIFICATION TO GOVERNING AGENCY PRIOR TO ANY REQUIRED INSPECTIONS. - <br />_ _ TANK SYSTEM TO BE INSPECTED BY OWNER'S ENGINEER & GOVERNING AGENCY AT THREE 3 SEPARATE CONSTRUCTION O <br />2 <br />r,,, 1-1300-422-4133 PHASES AS REQUIRED: SG��® y\ <br />-- _ 1. TANK AND PRIMARY PIPING HYDROSTATICALLY OR PNEUMATICALLY TESTED FOR 30 MINUTES. <br />_ 2. INSPECTION OF ALL SECONDARY CONTAINMENT, INCLUDING TESTING, IN ACCORDANCE WITH MANUFACTURER'S GUIDELINES. `r7N 1 E�'P <br />TWO 3. FINAL INSPECTION INCLUDING ALL PORTIONS OF THE LEAK DETECTION SYSTEM.. �+ ENGIN <br />J; --- _--_ _ WORKING DAYS <br />BEFORE YOU ALL TANK SUMPS AND UNDER DISPENSER URS TOMENT SUMPS SHALL BE S RE ATICALLY TESTED (LAKE TEST) WITH -u«D NI I`IIN6 aw DES:ca SPYALIETS' <br />DIG STANDING WATER FOR A PERIOD Of 24 HOURS TO INSURE THAT THE SUMPS ARE WATERTIGHT. THE OWNER'S 1x215 12ND AVENUE SOUTH <br />—� ENGINEER MUST SIGN OFF ON THIS TESTING ON THE TANK INSTALLATION CHECKLIST BEFORE CONTRACTOR WILL BE PPO. RENT, WASHINGTON28032 <br />-:_- <br />- <br />SION <br />w - WV PLYMOUTH -- —�--�� —_ — o Sownern Cellrornm r ALL AGENCY <br />PRIOR ALS TO TAN ESYSTEM BEING PLACED <br />D IN FOR INTEGRITY <br />PURPOSOR FORWARDED AND APPROVED BY GOVERNING <br />R I der round Sorvice Ale 206 <br />LL <br />IBLE <br />DRIVE <br />BCE# 4009 <br />- c - - - - - - - - - � - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - -_-. PER - <br />_ I - - - - - -� � - .__ - _ --- - E NATIONALLY RECOGNIZED CODES LOCAL CODES AND GOVERNING AUTHORITIES ester release date <br />-------------------- Note - - ----- - - ._- -- <br />1n <br />- - - - _ - NO. ARCO PRODUCTS COMPANY MASTER REVISIONS <br />EVII <br />_ - - - - - - NO. DATE REVISIONS <br />- I! CITY INSPECTOR i0 FIELD VERIFY THAT ALL EXISTING SITE ITEMS SUCH AS: `,� <br />_ I 1 Ir WALKS AND ENTRANCE AS WELL AS DOOR SIZE AND HARDWARE AND ANY /i—' <br />I - - - SANITARY FACILITIES ARE HANDICAPPED COMPLYING. PROJECT RELEASE prof, eXe. drawn by <br />_--- 1 /4/99 ADDED NEW 10,000 GALLON DOUBLE WALL TANK ISSUED FOR 2/10/991/30/99 SHK <br />Underground Tank Retrofit and Piping Installation Site Plan - <br />D �� : ' - - - _ - FOR 92 OCTANE. PER ARCO FIELD ENGINEER PLAN CHECK <br />--- Project / facility <br />CALL', 1" - ;0'- U" -------- - � 23/4/99 PLAN CHECK COORECTIONS PER CITY OF STOCKTCD <br />RELEASE 2/70/99 2133 <br />IN I F;3 ) <br />1 inch =10 ft, CONST, sheet / file <br />RELEASE <br />1 DW6 Tp1�/ <br />I ,__ I_-f-:u:I �1GG9\MECNAIJICAL�'I AI-Ik.S�4GG•drh 1»Ic/Prne03j D6/13i3 13 3-1 >_ele'. 7•-$70 Steve X2fs: <br />AS -BUILT TK1-1 <br />of <br />